Sea Water RO Plant Operator
Abu Dhabi Distribution Company
Total years of experience :13 years, 9 Months
Site Name: Al Yasat Island, Abu Dhabi
Plant / Capacity: Desalination Plant / 2 M USGPD
Scope
High TDS sea water treated to Portable Water by used system such as Media Filtration, SWRO & BWRO Treatment.
Site Name: Nabhaniyah, Saudi Arabia
Plant / Capacity: Drinking Water Treatment Plant / 25 MLD
Scope
The Radio Active Element of Radon and Metal Ions are presented.
Deep Well water treated to Drinking Water by followed system like Chlorination, Media Filtration, BWRO Treatment and Post Treatment.
(a) Site Name: SDSTPS (2*800 MW), Nellore, Andhra Pradesh Govt.
Shift In charge (Commissioning and O & M)
Plant/Capacity: Desalination Plant / 6 MLD
Duration: Mar’14 - May’15
Scope
High TDS Sea water treated to DM Water by Used system such as Tube Settler, Media Filtration, SWRO, BWRO Treatment and Mixed Bed.
(b) Site Name: Sterlite Industries (I) Ltd., Tuticorin
Shift In-charge (Operation & Maintenance)
Plant/Capacity: ETP-1, 2, 3, 4 (Effluent Type‘Arsenic’ Heavy Metal), RO Plant, Evaporater-1&2 and MOL-1, 2 Plants / 10 MLD
Duration: Aug’13 - Feb’14
Scope
High Arsenic Effluent treated to less than 10 PPM level treated water followed by the Primary & Secondary Clarifier, Reactor, UF and BW RO Process System. Here Arsenic Metal precipitated in Sludge form.
RO Reject fed to Evaporator to generate Condensate water and prepared the Milk of Lime Solution used by MOL Plant for Sulphuric Acid Plant.
(a) Site Name: Kaleesuwari Refinery Pvt. Ltd., Chennai
Site In-charge (Plant Supervisor)
Plant/Capacity: ETP-1 & 2, UF & BWRO / 4 MLD, Drinking RO, Softner, Multi Effect Evaporator, STP Plant and Cooling Tower
Duration: Apr’13 - Jun’13
Scope
High TDS with Oil Effluent treated to low TDS treated water followed by the Oil Separator, DAF, Primary & Secondary Clarifier, Aeration, Media Filtration, Softner, UF and BW RO System as well as plant domestic waste water and sewages treated by the STP plant.
(b) Site Name: Apollo Tyres Pvt. Ltd., Oragadam, Chennai
Plant Supervisor (May’12 - Mar’13)
Plant Operator (Jun’10 - Apr’12)
Plant/Capacity: WTP-60M3 & DM Plant 30M3 / Drinking RO and Softner
Scope
High TSS & TDS Lake Water treated to low TDS permeate water by using system of Tube -Settler, Media Filtration, BW RO, UV Treatment and Softner.
The Same feed water treated to DM water by using the system BWRO, SAC, SBA, Degasification and Mixed Bed.
Site Name: Chemplast Sanmar Pvt. Ltd., Cuddalore
Plant/Capacity: Desalination Plant / 4 MLD
Scope
High TDS Sea water treated to DM Water by using Tube Settler, Media Filtration, SWRO, BWRO and Mixed Bed Process System.
High COD, TSS & TDS PVC Resin Plant Effluent treated to low TDS treated water by using Clarifier, Media Filtration, UF, BW RO and SW RO.
Site Name: EID Parry Sugar Pvt. Ltd., Pudhukotti
Plant/Capacity: ETP-Aerobic-100m3/Hr / DM Plant-50m3/Hr
Scope
High COD, BOD and TSS Sugar Effluent treated to less value as the Pollution Board Acceptances Limit by using Equalization, Aeration and Clarifier.
High TDS Bore well water treated to DM Water by using Media filter, UF, BW RO SAC, SBA and Mixed Bed.