مانوليتو Toribio, Consultant mechanical project

مانوليتو Toribio

Consultant mechanical project

Lafarge

البلد
الفلبين
التعليم
بكالوريوس, Bachelor of Science in Mechanical Engineering
الخبرات
24 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :24 years, 9 أشهر

Consultant mechanical project في Lafarge
  • الفلبين
  • أغسطس 2013 إلى سبتمبر 2014

To provide consulting services for equipment improvement, rehabilitation projects and implementation of new projects.
Consults with department heads to define need of problem, conducts research, performs studies and surveys to obtain data and analyzes problems to advise on or recommends solutions.
Advises department heads on alternate methods of solving the problem, or recommends specification.
Conducted proposal writing (scope of work, cost estimate and work schedule) including meeting with contractors.

Mechanical Engineer/Supervisor, Head of New construction and Maintenance Project في PT Gunung Garuda
  • إندونيسيا
  • مايو 1996 إلى يناير 2012

Mechanical Engineer/Supervisor May 1996 - January 2012
(Head of new construction and maintenance projects)
PT Gunung Garuda, Indonesia
Responsible for mechanical supervision, management and control for the success of new construction projects and maintenance rehabilitation and improvement projects from conceptualization to execution and commissioning.
Managed new construction of electric arc furnaces and ladle furnace, water pump installation in the water treatment plant, installation of compressors and blowers, installation of dust collectors, alloy feeding equipment and conveyors, scrap transfer car and railway system.
Managed installation of piping system for hydraulic, oil, gas and water.
Managed installation of 16MVA and 20MVA transformers.
Manage new construction of hot rolling mill (hot rolled coil and plates)
Managed contractors and installation team, working closely with design, field and technical staffs to keep all team members continually and fully appraise of project targets and objectives. Controlled progress of projects to fit in construction schedule and prepare reports to management.
Performed periodic examination of contract administration in the field in order to locate any shortcomings or potential problems in the administrative procedures or contract terms and conditions.
Presided over meetings with local and foreign contractors and other section called for the coordination of projects, commissioning and maintenance activities. Acts as owner representative and looks after the best interest of the company and endeavors to project professionals and suitable image to the company at all times.
Organized and trained personnel for construction works and for maintenance activities such as spares identification and spare parts preparation.

Project Engineer في Refractories Corporation of the Philippines
  • الفلبين
  • يناير 1996 إلى أبريل 1996

Project Engineer (Area Engineer) January 1996 - April 1996
Refractories Corporation of the Philippines, Philippines,
Conducted project site inspection and prepared plans and drawings for mechanical erection, piping installation and for building extension.
Prepared bill of materials for fabrication, procurement and for cost estimates.
Prepared bidding documents and presided meetings with contractors.
Directed and supervised contractors in the implementation of projects.
Prepared reports to management on detail development of the project activities.

Mechanical Engineer في National Steel Corporation
  • الفلبين
  • أبريل 1989 إلى سبتمبر 1994

Mechanical Engineer I April 1989 - September 1994
Hot Strip Mill Expansion Project
National Steel Corporation, Philippines
Reviewed plans and interpreted design aspect of the equipment and process of the mill. Planned and organized activities. Inspected/monitored all activities involved in the fabrication, rehabilitation, mechanical equipment erection and installation of piping systems.
Updated plan to conform to the order of priorities as set by the current progress of the projects
Directed and supervised contractors for the implementation of project activities. On site evaluation and trouble shooting of all factors that caused the delayed performance of project activities and formulated the strategy in resolving issues on daily basis.
Coordinated with all groups concerned in providing the necessary support for all activities, thru initiation of formal letters, job orders, purchase requisition of construction materials and borrowings from other department, negotiations for shifting and assignment of transfer of resources(manpower, equipment, etc.) to other areas and with other module engineers and supervisors of contractors upon confirmation of the solutions.
Presided meetings with foreign and local contractors, implementing and other sections called for the coordination of the installation and commissioning activities.
Evaluated over-all accomplishment of the project. Prepared analysis of slippage in the project schedules and plans or systems and procedures on how project delays recovered. Prepare reports and or presentation materials to top management.
Acted as shift supervisor or guide engineer in-charge in the area whenever required.

Field Engineer في Atlantic Gulf and Pacific Co. (AG&P)
  • الفلبين
  • أبريل 1987 إلى سبتمبر 1989

Field Engineer January 1986 - August1988
Atlantic Gulf and Pacific Co. of Manila (AG&P), Philippines
New Cold rolling mill project and Hot Rolling mill maintenance rehabilitation project.
Area engineer in-charged for piping installation for water and fire protection (water sprinkler, Halon 1301)
Prepare the required materials for the project execution. Inspection of all materials and equipment installed to ensure its quality and completeness and prepared as-built drawings.
In-charged in the distribution and control of construction materials.
Conducted inspection of the equipment and materials as to its specification, design capacity and dimensions.
Supervised in the project reconciliation.
Engineer assigned in the mechanical spares and maintenance group special projects. Spearheaded the spare identification listing and assisted the department in the preparation of spare parts and budget.

الخلفية التعليمية

بكالوريوس, Bachelor of Science in Mechanical Engineering
  • في Misamis University
  • مارس 1983

College: Misamis University Ozamis City, Misamis Occidental Philippines School Year 1978 - 1983 Degree: Bachelor of Science in Mechanical Engineering

Specialties & Skills

Project Execution
Project Supervision
Equipment Installation
Field Organizing
Maintenance Management
Project Management, Mechanical Installation Rotary and Static, Piping Installation oil, gas, water
Microsoft word, Microsoft excel, MS office project, AutoCAD

اللغات

الانجليزية
متمرّس

العضويات

Philippine Society of Mechanical Engineer
  • Member
  • April 1992