Asst.Plant Incharge (Power Plant )
KSF Tri Zone Industry Pvt. Limited 24km Sheikhupura Road Lahore
Total years of experience :14 years, 2 Months
3 x 1 MW Gen-set Jenbacher J320 GSNL
3 x 750 KVA Gen-set ALLIED CAT
2 x 1 MW Gen-set MTU18V20000-G26F
• Caterpillar, Volvo and cumin's diesel-based
•Ability to work in Team as a Team member, in a team-oriented and safety-conscious environment.
•Preventive and corrective maintenance of all Electrical & Mechanical Equipments, such as Motors, Transformers, cooling tower fans, and ventilation fans.
•Troubleshooting, general maintenance, and overhauling of rotary equipment such as centrifugal pumps, compressors, heat exchangers, cooling towers and turbocharged gas engines.
•Responsible for the smooth operation of Gensets and auxiliaries.
Plant specifications: - (225 MW)
28 x 8 MW Gen sets Niigata STX (16V34HLX)
Fire Tube HFO/Gas fired Boiler.
Auxiliaries' compromises of RO Plant, Cooling radiators, Purifiers, Filters, Different types of Pumps.
Job Responsibilities:
Responsible for troubleshooting, routine maintenance, and significant over holing.
Responsible for conducting day-to-day maintenance activities along with the Mechanical Maintenance and E&I departments.
3 x 1 MW Gen set Jenbacher J320 GSNL
3 x 750 KVA Gen set ALLIED CAT
2 x 1 MW Gen set MTU18V20000-G26F
Job Responsibilities:-
Responsible for troubleshooting, routine operation, maintenance, startup and shutdown of the plant.
Responsible for conducting day-to-day operational and maintenance activities along with the Mechanical Maintenance and E&I departments.
Responsible for conducting and record-keeping of weekly safe operations in different systems.
I have do one year post diploma training Program (PDTP) in this training i learn about the working of turbines pumps compressors and the systems of nuclear power plant also learn about heat exchangers and the working of nuclear power plant.
KSF Tri Zone Industry Pvt. Limited 24km Sheikhupura Road Lahore: Worked as Asst Plant Incharge (Power) From March, 2013 to January 2014
• Plant Capacity (3+3) MW Gas and Diesel Based.
• Jenbacher JGS320GSNL (3* 1.064 MW)
• Caterpillar, Volvo and cumin's diesel based
•Ability to work in Team as a Team member, in a team oriented and safety conscious environment.
•Preventive and corrective Maintenance of all Electrical & Mechanical Equipments, such as Motors, Transformers, cooling tower fans, and ventilation fans.
•Trouble shooting, general maintenance and over hauling of rotary equipments such as centrifugal pumps, Compressors, heat exchangers, cooling towers and turbo charged gas engines.
•Responsible for smooth operation of Gensets and auxiliaries.
Ghazi Fabrics International Limited 46-KM Multan Road Lahore: Worked as Asst.Maintenance Engineer (Power) From October, 2010 to March 2013.
• Plant Capacity 12 MW Gas Based.
• Jenbacher JGS620GSNL ( 4* 3.14 MW)
•Schedule breakdown and preventive maintenance such as measured & adjust valve lash, valve take up, cleaning & installation of spark plugs, after cooler, turbocharger, cooling tower fans, supply fans, & exhaust fans overhauling and alignments etc. •Hand on experience of top end maintenance of Jenbacher engines
Ghazi Power International Limited 46-KM Multan Road Lahore: Worked as Asst. Diesel Mechanic From March, 2010 to October, 2010.
• Plant Capacity 20 MW FHO Based.
• Caterpillar 3616B (6*3.4 MW).
Transferred to Gas Power Plant.
Preventive and corrective Maintenance of all Electrical & Mechanical Equipments, such as Motors, Transformers, cooling tower fans, and ventilation fans.
•Trouble shooting, general maintenance and over hauling of rotary equipments such as centrifugal pumps, Compressors, heat exchangers, cooling towers and turbo charged gas engines.