Project Control Engineer
Parsons International Limited
Total years of experience :18 years, 7 Months
Project: Education City, Doha - Qatar
•Creating Work Breakdown Structures of the project.
•Allocating budget to the various Work Breakdown Structures.
•Managing the invoicing process, calculation, and documentation.
•Liaising with the client for invoice procedure and approval.
•Assisting in the re-baseline calculation of the project.
Proposal Project Schedule (P6) for the following projects:
•Consultancy services for the district cooling plant, DCP-02 & DCP-03; Dubai, U.A.E.
•Banana Island Resort Project; Doha, Qatar.
•Construction Supervision for Development of ISF Camp; Duhail, Qatar.
Project Cost Estimate for the following projects:
•Consultancy services to manage & control the non-revenue water in the WDD network; Bahrain.
•Consultancy services for the district cooling plant, DCP-02 & DCP-03; Dubai, U.A.E.
•Consultancy services for the development of integrated master plan for the water, wastewater & TSE; Madinah, K.S.A.
•Post-contract professional consultancy services for construction of 10 new schools - Public Work Authority; Doha, Qatar.
•Pre-built warehouses, preliminary design, tender support, and post contract services - Abu Dhabi Ports Company; Abu Dhabi, U.A.E.
•New Doha Port Project - New Doha Port Project Sterring Committee; Doha, Qatar.
•Development of regional airports - Ministry of Transport & communications - Civil Aviation Affairs; Muscat, Sultanate of Oman.
Project: Road Safety Audit, Abu Dhabi U.A.E
•Initiate the project by liaising with the Client and other Consultants on a regular basis.
•Conduct a monthly work progress meeting with other consultants.
•Preparing the Project Management Plan (PMP).
Creating a Geodatabase for more than 2, 000 Km of road network to be used in the road safety survey.
•Generating all necessary maps of the road network, finding, and output to be used in the survey and final report.
Project: Saadiyat Island Development Transportation Master Plan Study, Abu Dhabi U.A.E
•Developing a transportation model for Saadiyat Island to evaluate and validate the transportation multi-modal concepts.
•Preparing Shapefiles needed for the transportation analysis (TAZs, centroids and centroid connectors, road and transit networks).
•Assisting in the development of trip generation, trip distribution and road / transit assignments.
•Handling the QA/QC of all the model output files.
•Utilizing Synchro and Sidra software to develop the Saadiyat road network model to evaluate and analyze signalized, un-signalized, and roundabout intersections.
•Assisting in the preparation of the TMP technical report with the coordination of the Transportation Project Manager.
•Assisting in the preparation of several TIS studies for multiple developments within Saadiyat Island, such as Al Manarat and Marina Tower.
Project: Sir Bani Yas Island Development, Abu Dhabi U.A.E
•Developing a transportation model for Sir Bani Yas Island to design and evaluate its unique transportation multi-modal concepts.
•Preparing Shapefiles needed for the transportation analysis (TAZs, centroids and centroid connectors, road and transit networks).
•Developing a manual trip generation and trip distribution based on planned number of visitors and activities.
•Handling the QA/QC of all the model output files.
•Utilizing Synchro and Sidra software to develop the Saadiyat road network model to evaluate and analyze signalized, un-signalized, and roundabout intersections.
•Assisting in the preparation of the TMP technical report with the coordination of the Transportation Project Manager.
•Ortho-rectification, geo-reference and mosaic of aerial photos and satellite images using ERDAS Imagine 9.0.
•Developing Geodatabase for several projects using ArcGIS and AutoCAD.
•Creating a Geodatabase for the road network of U.A.E to be used in the development of a navigation system, using ArcGIS.
Working on ArcGIS software to build GIS projects for different municipalities
•Ortho-rectification, geo-reference and mosaic of satellite imagery using ERDAS Imagine 9.0.
•Updating old cadastral maps using Microstation, ArcGIS and AutoCAD.