MARIO PELARCA, Electrical Engineer

MARIO PELARCA

Electrical Engineer

SMCC Philippines Inc. (Sumitomo Mitsui Construction Co.)

Location
Philippines
Education
Bachelor's degree, Electrical Engineering
Experience
25 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 4 Months

Electrical Engineer at SMCC Philippines Inc. (Sumitomo Mitsui Construction Co.)
  • Philippines
  • My current job since April 2019

• In-charge of electrical temporary power supply for the whole construction facilities.
• Review design drawing & cost contract for electrical works as well as cost agreement between the General company and M&E sub-contractor.
• In-charge of client comment and additional works for electrical system.
• Responsible for checking documents from sub-con before stamp and approved.
• Check and monitor site execution to make sure all done as per approved shop drawing and material.
• Joint coordination meeting in order to solve the issue from all other sub-con.
• Coordinate with structural and architectural design to avoid conflict with M&E installation.
• Review material submittal documents from sub-con before submitted to client for comment and stamp approval.
• Check billing progress from sub-con before final process.

Electrical Engineer at PT. Taiyo Sinar Raya Teknik (Sumitomo Group Japan)
  • Indonesia
  • September 2011 to February 2017

1) Oversee the technical aspects to review electrical design & the specification base on the contract agreement between the client and the contractor.
2) Check any type of materials & equipment from medium voltage down to low voltage base on the given specification on the design drawing as well as communication system.
3) Checking and review shop drawing made by the drafter and give any sketch plan recommendation before submitted to consultant or client for approval.
4) In-charge of site implementation and control in coordination with civil works & various system installation as per the specification on the given approved shop drawing.
5) Checking of automation system & control base on the design & requirements from owner of the building and discuss personally to each vendors / supplier to get more productive and good result during the operation of the system.
6) Checking also of mechanical control system such as fire fighting & water supply for plumbing system on water tank source to install water level control system in order to operate the pump automatically.
7) Checking also of Mechanical equipment such as emergency back-up generator system include supply of fuel pipe and return pipe from fuel storage tank.
8) Checking on site & giving direct supervision on installation for each system base on approved
section and details as well as approved method statement.
9) Assessment on vendor technician during testing and commissioning works base on testing &
commissioning method statement from medium voltage down to low voltage as well as communication / electronic system.
10) Assessment or witness factory Fat testing & commissioning of medium voltage equipment such
as switch gear panel and transformer before delivery to actual site of installation and keep the
record all the data made by fat testing in-charge.

Site Electrical Engineer at HYUNDAI AMCO CO. LTD. (hyundai engineering group)
  • Libya - Benghazi
  • July 2010 to January 2011

Organized and checked the work of subcontractor, the daily activities & daily progress report, and also the daily work schedule. Checking the manpower capacity & ability to do the job and the quality of work if they are following the approved installation details & specification as well as the quality of materials being used and it should be approved materials, base on the approved shop drawing before submitting to the consulting office for final inspection. Coordinate to all discipline to avoid any obstruction during the execution of work on site, Oversee the technical aspect for the whole electrical works on building and infrastructure projects and make sure that the quality of work is done in accordance with the approved plan and specification as stipulated on the contract agreement between the client and main contractor. Monitoring the whole site implementation and work progress including the safety of all workers, that they are advised to wear complete PPE as ordered by the client and company rules to check and secure all the life of people on site during working time, Conduct actual checking on slab and on wall before submitting for consultant final inspection and before concrete casting will begin as per complete installation done to make sure that they follow the installation details and specification as well as approved materials, and checked and review the whole electrical shop drawings, details and specification.

Site Electrical Engineer at United ElectroMechanical Int'l. (UEI)
  • Qatar - Doha
  • March 2008 to March 2010

Site preparation and implementation as per site condition and civil work condition with proper supervision on actual installation, oversee and check the approved shop drawing and approved method of statement as well as proper approved specification and approved installation details and relate to skilled workers before execution of work to avoid rejected and passed by the consultant during inspection time, and this well be done for inspection as per as built plan I made and also it is reflected to approved shop drawing and sign by consultant inspector and main contractor QA/QC in-charge for approval reference and proof, All material installed also based on material approval and all documents is on site just in case for checking, Every work executed is based on calendar days work target and as per contract agreement to avoid delayed and back-charging, Attending 30 minutes daily coordination meeting in order to know and follow all problems in any discipline involved on site and this is the basis to run the work smoothly on site, Material estimate and material take off should also consider on site in order to meet the proper contract agreement without losing the contract price, monitoring on site should also done properly to avoid delayed and rushing problems, final checking of works to be done before submitting to QA/QC for final submittal for inspection, safety procedures also followed as per client and contractor rules during execution of work, I’m conducting daily safety briefing to workers before start the work, Scope of work and system in-charge to be lay-out is under special system which is Fire Alarm system, Public Address system, MATV system and Access Control system involved door access system / security surveillance system, all is under low current system, Every shop drawing problem to be finalized on design in-charge before executing on site, daily reporting also submitted to my construction manager and also discussing any problems in-counter on site, site condition, design and material problems, noted, no foreman under me.

Site Electrical Engineer at ELSERVCO ELECTRICAL SERVICES (EST)
  • United Arab Emirates - Abu Dhabi
  • December 2005 to December 2007

Site monitoring actual Implementation Supervision for the 7 system shop drawings & handling 4 foreman for site lay-out and installation for the following system, 1) Lighting System w/ CSM & DALI control, 2) Power System include power schematic riser diagram 3) Emergency Lighting System, 4) Fire Alarm & Voice Evacuation System, 5) Security & Surveillance System include CCTV riser diagram 6) Telecommunication & CATV System include IDF Connection and riser diagram 7) Building Management System(BMS), BUSBAR assembly & cable tray installation vertical & horizontal, raised floor trunking lay-out for structured cable, Checking & reviewing approved shop drawings and installation approved details, Monitor civil works for upcoming electrical works, Checking & reviewing material approval, technical submittal before submitting for material inspection and make sure material to be installed on site is approved from consultant & client, Reporting and discussing to MEP coordinator regarding site problems & giving them updated accomplishment & pending works to Sr. Electrical Consultant in order to check & giving action whatever the problems on site to avoid delaying the project, Preparing electrical check request(RFIA) to the consultant for approval on site works, Assisting the Inspector during inspection time in order to act immediately whatever the comment they want to do, Performing all other duties that requested by the senior electrical engineer, Prepared & submit daily activities report to consultant and main contractor, Assisting the foreman to interpret the plan & specification specially as per site condition, direct instruction and supervision to the technician on site, follow up the consultant whatever comments on site and rectify as per comment, in-charge for making as built shop drawings, prepared pre-commissioning check request with the assessment from supplier and assist the consultant for final inspection.

Electrical Inspector at GERARDO R. DIGAL CONSTRUCTION AND ARCHITECTURAL SERVICES.
  • Philippines
  • February 2004 to July 2005

Reporting to General Manager as well as the Head of the department, I'm in-charge of the safety on site implementation on safety requirements during execution of work, I'm conducting safety briefing to all workers every morning regarding the rules and regulation about safety procedures before start the work, I'm conducting tools check up, hand tools, power tools, scaffolding and all safety materials being used on site, PPE is always implemented on site, Materials inspection before installation on site as per material sub-metal and approval, actual inspection about electrical works on site as per recommended and advice by management team and make sure that they follow the approved details installation and specification, attend weekly meeting by management rules and make a report daily to submit at the office for record purposes specially no accident happen...

Electrical & Instrument Fitter at KENTZ MEPC (Malaysia) SDN. BHD.
  • Malaysia
  • June 2003 to October 2003

Reporting to E & I Supervisor, Construction Punch-list responsibility assignment, Study the P & IDS and interpret the sketch plan and specification before the start the work, prepare permit to work on every task location, safety briefing on actual site of work due to some area already on operation, Tubing lay
out & installation for air pressure Supply, plus control valve accessories connection, Glanding and termination of electro-pneumatic assembly, plus high and law transmitter for air-pressure unit, plus Temperature transmitter tubing connection of solenoid valve, plus nitrogen gas tubing and air-vent for discharging., Cable tray lay-out and installation
for instrument cable including fabrication of trunking & support, plus cable pulling and cable dressing inside cable trunking & instrument control panel including termination or connection from panel to apparatus, assisting to commissioning team after connection.

Electrical Technician at ASADRA SANKO (Malaysia) SDN. BHD.
  • Malaysia
  • February 2002 to April 2003

This is newly construction oil & Gas refinery Train-7 & Train-8 construction Project, 1st, attend daily safety briefing on every team & weekly safety
briefing on overall contractor, Reporting to Electrical foreman & supervisor as a team leader of the group, prepared daily schedule as per task given, prepared sketch & drawing, tools and materials to be used, safety materials as well, Cable laying direct
buried from substation to any area of sub-panel location and from transformer location as per sketch plan and specification before backfilling, cable tray lay-out & installation horizontal and vertical from 50mm to 900mm size of cable tray, through welded support around the oil and Gas tower and cooling tower as well as pipe line control valve panel and termination point, motor control line to panel and termination box, lighting fixtures
line and termination point box, lighting steel support fixing, termination point box and panel support installation, cable tray grounding connection on every end, and after all laying of cable and cable tray installation, cable pulling will follow point to point using XLPE cable vertical & horizontal, thin follow glanding and termination to termination
box, control panel, transformer termination point using high voltage terminator qualified,
and substation connection, lighting fixtures connection as per design drawing schedule of
loads, termination of motor control box point, grounding and earthing connection, thin
commissioning team will follow for testing and energized.

Electrical Engineer at GERARDO R. DIGAL CONSTRUCTION AND ASSOCIATED.
  • Philippines
  • July 2001 to December 2001

Reporting to Project Manager, Handling 2 foreman, in- charge of site implementation for electrical installation vertical and horizontal project, study shop and approved drawing and help to interpret the sketch plan and specification to skilled and foreman on site, actual supervision on execution on work on site as per drawing and specification, request material approval to the consultant, and make request inspection for consultant inspection on site installation and make sure that we immediately do repair or whatever the consultant comment...

Residence Engineer at ACTIVE CONSULTANCY GROUP & COMPANY
  • Philippines
  • October 2000 to June 2001

* Oversee the technical aspect of the whole project
and make sure that the quality of work is done in accordance with the plans and specification as stipulated in the contract agreement, Inspection of installed materials against the specified plus Monitor progress of construction work & proper
documentation, Checking of elevations and gridlines before approval of concreting plus Responsible for the approval of all construction materials to be used
on the project site plus Evaluation of billing & recommends the percentage as per work accomplishment to the general contractor, Log daily work activity, weather, equipment, manpower and other data relevant to the construction operation, plus Coordinate with the design architect for any revision to be implemented, Attend jobsite technical & management meeting plus Conduct ocular
inspection for the proper execution of work and Supervise of all electrical lay-out & installation done on actual work plus Supervise concreting, masonry works and other finishing works plus Conduct re-bar testing & cylindrical concrete test ..

Project Engineer at CCBJR CONSTRUCTION & ENGINEERING SERVICES
  • Philippines
  • December 1999 to August 2000

In-charge of site implementation, handling
manpower for project execution on site, monitoring on actual accomplishment and supervise to meet the calendar days requirements between the client and contractor, updated all materials to be installed to make sure all are already approved by the client and consultant, monitor and checking the progress report daily as per work schedule by manpower, making billing report quarterly and make sure that they meet the progress requirements as per management team advice, checking all manpower skilled if they are qualified to be the member of a team and make sure all are capable to follow when pressured came out on site implementation, update daily report progress given by foreman..

Working College Student / Personal Driver at University of Mindanao (UM)
  • Philippines
  • June 1994 to March 1999

Personal driver of former vice president of the university of Mindanao and also messenger of the doctorate office of the said university as well as sometimes building technician, then studies during night time.

Education

Bachelor's degree, Electrical Engineering
  • at University of Mindanao (UM)
  • March 1999

Study five year course of Bachelor of Science in Electrical Engineering until I receive Diploma, then Review 5 Months preparation for Electrical Licensure examination dated October, 1999 in order to become a Registered Electrical Engineer license in the Philippines.

Specialties & Skills

QA QC Engineering
MS Excel
MS Word
Basic AutoCad

Languages

English
Expert
Tagalog
Expert
Indonesian
Intermediate

Memberships

Institute of Integrated Electrical Engineers (IIEE) Philippines
  • Regular Member
  • January 2000

Training and Certifications

Scaffolding Inspector Course (Training)
Training Institute:
TUV Middle East LLC, Qatar