MEP QA/QC Manager
Cawley & Mckillop Contracting LLC
Total des années d'expérience :25 years, 2 Mois
1. Generated and established a quality policy and procedure to improve quality awareness and work quality.
2. Supervised the overall implementation of quality policy and procedure (MEP).
3. Conducted meeting to all Site and QA/QC Engineer regarding quality issues on site that is affecting the work productivity.
4. Coordinated to the Contractor all quality related matters affecting the work at site such as per the project requirement, shop drawing, international and local standards.
5. Review and approved all submittals such as Method Statement, Work and Material Inspection
1. Supervised all mechanical works at site for HVAC, Plumbing, Drainage, Fire Fighting, Waste water treatment, LPG system and infrastructure works from installation up to Testing and Commissioning.
2. Verified that all works at site are in compliance to project specification, approved drawings and related international and local standard.
3. Reviewed all technical submittal such as material, engineering calculation, pipe sizing, equipment selection, RFI, drawings and handover documents.
4. Highlighted all major quality issue at site through FOR and NCR.
5. Coordinated properly to Contractor, sub-contractor and related department regarding work status in order to execute in orderly and safely manner.
6. Coordinated to the designer and/or client on issue that is affecting work progress and need immediate attention.
7. Handled some of the prestigious project in Qatar such as National Museum of Qatar, Baladna Farm and Industrial Factory (Milk and Plastic) from installation to Testing and Commissioning.
8. Major Accomplishment: Handed-over a fast track project worth $275M to the client on the agreed time frame.
1, Prepared and coordinate all take-off to be distributed to procurement for material order.
2. Conducted daily meeting to supervisor regarding work progress and safety requirement at site.
3, Ensured that all shop drawing to be executed on site is approved and commented by the consultant.
4, Prepared all submittals such as quality procedure, method statement, risk assessment and inspection.
5. Coordinated to all related department regarding work requirement prior to its execution.
6. Checked all the works at site is complying the project specification and related international or local standard prior to inspection.
7. Coordinated to the designer and/or client on issue that is affecting work progress and need immediate attention.
8. Prepared monitoring form on all site related issue and work progress in order to check actual work completion vs. project time frame.
9. Major Accomplishment: Maintain high passing rate on all inspection and technical submittal by proper monitoring and checking of works.
Maintenance/ Calibration Engineer
1. Generated a maintenance schedule according to all production equipment and tools in accordance to its operation and maintenance manual to ensure that equipment and tools are always in good condition.
2. Coordinated periodical testing to the third party for equipment such as generators, ageing chamber, AC Units to ensure that emission are within the parameters set by the local authority.
3. Promoted safety awareness to all personnel performing the maintenance procedure.
4. Generated procedure and method statement on how the maintenance shall be conducted by the concerned department.
5. Identified all damage equipment and tools and arrange immediately for a part replacement to avoid any delay at the production area.
6. Verified that all stocks for spare parts are properly monitored to ensure the availability.
7. Made proper identification of the tools and equipment.
8. Performed the calibration of tools (calipers, micrometers, torque driver and standard weights).
IQC Engineer
1. Generated a Quality procedure and Work Instruction that will guide and help Inspector to perform accordingly their work.
2. Strictly implemented First In First Out (FIFO) in order to avoid any material to be stocked for a long period of time.
3. Conducted a plant visit to supplier in order to check the procedure and methods required in processing the materials are being followed properly.
4. Major Accomplishment: Generated a quality procedure and method statement to be followed by personnel as basis of their judgement in order to avoid any material delayed in the production.
Production Engineer
1. Organized personnel and discussed the day to day activities to meet production target.
2. Conducted and perform process improvement using different statistical tools to improve productivity.
3. Performed process improvement using different statistical tools in order to improve productivity.
4. Trained personnel to all new procedure being implemented to have good quality products.
5. Major Accomplishment: Exceeded the production output for six succeeding months by process evaluation.
ISO Auditor (ISO9001&ISO14001)
1. Conducted system verification to the set policy, program, and procedure being followed and showing improvement on its implementation.
2. Highlighted major issue to the management that may cause big impact to the system and surveillance audit.
3. Created deviation report in case the issue found to have a major impact to the system being implemented.