Project Manager في Amec Foster Wheeler
  • المملكة العربية السعودية - الشرقية
  • أشغل هذه الوظيفة منذ ديسمبر 2013

Project Manager (Dec 2013 - present)
• Senior Project Manager/Consultant to Saudi Aramco Upstream GM Project Management.
Developing and analyzing KPI’s and Dashboards for Business Risk Mitigations, Business
target settings, CAPEX optimization, Expenditures forecast, Performance Dialogue, HR and
Safety.
• Senior Project Manager/Consultant to Saudi Aramco PMC team on Fadhili Gas Program.
Developed Progress, Manpower and Safety KPI Dashboards for the entire program.
Monitoring all pre - commissioning activities via customized dashboard/tracker on a weekly
basis.
Ensure schedules are coordinated and consistent with the overall project schedule.
Provide information on schedule performance and alert project Managers on issues that
may cause delay and propose recovery scenarios.
Produce S-curves and statistical analysis diagrams.
Compare the planned resources with actuals on site.
• Project Manager (Foster Wheeler And Partners Engineering Limited, FWAPEC) Fadhili Gas
Development Program, Saudi Aramco, Al-Khobar, Kingdom of Saudi Arabia Program around
US$8 billion whilst the FEED is over around 18 months.
Leading a team of around 100 engineers and designers on the Early Works, Infrastructure
and Residential and Industrial Buildings Scope of this PMC / Front End Engineering Design
(FEED).
Program currently on time and budget and corporate margins meeting expectations after
nearly 10 months.
Company Representative for Technical Execution of the stated Scope and reporting to the
Saudi Aramco Project Manager on Project Progress and Technical and Commercial
Submissions
Reporting to the Foster Wheeler In Kingdom Project Director as well as the FWAPEC and
SOFCON Technical Director.
In addition, interfacing with the Foster Wheeler Energy Ltd, UK Team undertaking the Gas
Plant Process Design as well as the Pipelines
Team Leadership of a diverse and multi-cultural technical and estimating team.
Multi-center project execution in a jointly owned company.
Interaction with international team of seconded resources

Project Manager في AmecFW
  • المملكة العربية السعودية - الخبر
  • مارس 2013 إلى ديسمبر 2014

ARAMCO Site Development Project - Home Ownership in Al-Hasa. The Project Scope includes Detailed Engineering Design infrastructure facilities required for the development of H/O Lots, Increment III, Phase - 2B in Al-Hasa under BI-28-00009. The project covers 289 lots, Three (3) daily Mosques - Three (3) Lots for Muathin, Three (3) Lots for Imam, 4 (NC) Neighborhood Centers, Four (4) Green Areas, Public library, parking, One Boys Intermediate and Elementary School, One Girls Intermediate and Elementary School and park.

Project Manager في SOFCON
  • المملكة العربية السعودية - الشرقية
  • أغسطس 2012 إلى ديسمبر 2013

Rabigh Phase II project, Non process Buildings (Saudi Aramco-Sumitomo Chemical). The Project Scope includes Detailed Engineering Design for the followings:
• Temporary JV Camp Facilities and Directorate Office Facilities.
• Non Process Buildings and associated equipment.
• Electrical power and utilities supply to all Non Process Buildings.

Project Manager في SOFCON
  • المملكة العربية السعودية - الرياض
  • مايو 2013 إلى ديسمبر 2013

Saudi Electric Company (SEC) projects-Design for Training and Development Institute and Distribution Control Center in Riyadh.

Project Manager في SOFCON
  • الإمارات العربية المتحدة - أبو ظبي
  • مايو 2012 إلى يوليو 2012

The scope comprises of Detailed Engineering Design and tender Documents preparation for Multi Products Terminal Facility projects at four (4) different locations in Abu Dhabi. It includes design and construction of Maintenance Workshop, Additive Storage Facility, and Dike Walls around bulk finish products and Material Shed at lube and Grease Plant.

Lead Project Engineer في SOFCON
  • المملكة العربية السعودية - الرياض
  • أبريل 2012 إلى يوليو 2012

The scope comprises of Detailed Engineering Design and Procurement Support to construct a new Fire Station Building in Wasea Bulk plant and ASL crude oil pipelines (6km) along with Loading bays for Wasea Bulk plant.

Project Manager في SOFCON
  • المملكة العربية السعودية - الخبر
  • سبتمبر 2011 إلى يونيو 2012

Project Manager
Lead multi-discipline teams (Architectural, Civil/Structural, Process, Mechanical, Pipelines, Electrical, Instrumentation and Communication) on the tasks of conducting FEED engineering or detail design packages and construction support. Manage the conduct, preparation and delivery of design packages encompassing multi-discipline design calculations, drawings, data sheets and technical documents (including scope of work, interface work and specifications), including special contributions to civil/structural works.
Main job responsibilities include job assignments/distribution to the discipline engineers, guiding engineers for the preparation of various deliverables, resolving technical issues, checking the design package for its accuracy before submission, meeting the milestones, controlling and allocating of man hours, attending project progress & review meetings.

Project Lead Engineer في SOFCON
  • المملكة العربية السعودية - جدة
  • سبتمبر 2011 إلى مارس 2012

The project scope includes installation of additional wastewater treatment Equipment to be in full compliance with the latest Saudi Aramco Engineering (SAES) environmental standards.

Project Engineer from April 2010 to November 2011 on WASEA في BULK PLANT
  • المملكة العربية السعودية - الخبر
  • أبريل 2010 إلى نوفمبر 2011

Worked as a Project Engineer from April 2010 to November 2011 on WASEA
BULK PLANT (Saudi Aramco) . The project provides a new grass roots bulk plant,
named as WASEA Bulk Plant in the South Western corner of the Saudi Aramco
land reservation. This bulk plant will ultimately supply two grades of gasoline and two grades of diesel. Although the initial demand at start-up will be approximately
185 MBD, this plant is being designed for a demand of 250 MBD in the year 2019.

Project Engineer and Civil Lead في Saudi Aramco Engineering
  • المملكة العربية السعودية - الخبر
  • نوفمبر 2010 إلى فبراير 2011

Worked as a Project Engineer and Civil Lead from November 2010 to February 2011 on THUWAL TOWNSHIP DEVELOPMENT. The project scope includes
public buildings, road improvements, surface drainage, water booster station, non- electrical utilities and a cultural park.

Project Lead Engineer في SOFCON
  • المملكة العربية السعودية - الشرقية
  • يونيو 2008 إلى أغسطس 2010

GOSI Housing Project. A major detailed engineering design for more than 500 villas and 58 hectares of infrastructure utilities and road network.

Civil Lead Engineer في SOFCON
  • المملكة العربية السعودية - الشرقية
  • أكتوبر 2004 إلى مايو 2008

Royal Commission’s Infrastructure Development Projects (Jubail 2 industrial city),

Site Development of Lots Areas, Roads And Utility Corridors In Light Industrial Park Expansion for Yanbu's Royal Commission in Saudi Arabia.
Main Tasks:
• Task 20-B (Area 2 km2)
DESIGN ROADS AND UTILITIES IN LIPE (LIGTH INDUSTRIAL PARK EXPANSION).
• Task 22 (Area 4 km2)
DETAILED DESIGN AND ENGINEERING FOR ROADS, UTILITES AND MATERIAL TRANSPORT CORRIDORS IN YANBU-2 PHASE-1.
• Task 02 (Area 2 km2)
DETAILED DESIGN AND ENGINEERING FOR ROADS AND UTILITES IN HAII
AL BATHNA, HARAH 4.

Civil Engineer في DAR AL-HANDASA
  • المملكة العربية السعودية
  • سبتمبر 2002 إلى يوليو 2004

Sep.2002 - July 2004 DAR AL-HANDASA Lebanon July 2004

Civil Engineer
Worked on number of design projects executed by the company. Duties performed
include: • Leading the data collection team.
• Developing the design drawings.
• Preparation of technical specifications.
• Preparation and organization of Bill of quantities.
• Distribution networks modeling and simulation using H2Onet software.
• Design of water irrigation systems.
• Provide construction support as needed.

Project Engineer في VIVA CONTRACTING COMPANY
  • لبنان
  • يونيو 2000 إلى سبتمبر 2002

June 2000 - Sep. 2002 VIVA CONTRACTING COMPANY Beirut Lebanon

Project Engineer
Duties carried out include design and detailing RCC structures, steel structures,
preparation of structural steel fabrication drawings and specifications. Job
performed also include maintaining materials tracking list, cost estimation and preparation of as-built drawings

Assisted the construction team with supervision in infrastructure facilities
development of number of industrial and commercial Clients. The projects
associated includes: Rehabilitation of Anout Public School, El-Basatin Infrastructure
Development, Rural Roads Development in Deirkouble, Road Asphalting in
Gharifeh & Aynbal, Ainksor's Water System and Ainksor's road system
development.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Lebanese American University
  • يونيو 2000

Specialties & Skills

Dashboards
Project Management
Risk Management Consulting
Civil Engineering
AUTO CAD 2010
CIVIL/STRUCTURAL
ENGINEER
LEAD ENGINEER
PROJECT LEAD ENGINEER
kPI dashboards
dashboard
project management
data analysis

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الفرنسية
مبتدئ

العضويات

Lebanese Engineering Society
  • Member
  • January 2000
PMI
  • PMI-RMP
  • April 2012
Saudi Council of Engineers
  • Civil Engineering
  • January 2012

التدريب و الشهادات

Project Risk Management Professional PMI RMP (الشهادة)
تاريخ الدورة:
July 2012
Commercial and risk management for projects (تدريب)
معهد التدريب:
Amec Academy
تاريخ الدورة:
September 2015
المدة:
19 ساعة
Project Risk Management Professional (PMI-RMP) (الشهادة)
تاريخ الدورة:
April 2012
صالحة لغاية:
April 2020

الهوايات

  • Interactive excel Dashboards
  • Harley Davidson Rider