مازن عبد الرزاق أحمد, Supervisor Site Engineer

مازن عبد الرزاق أحمد

Supervisor Site Engineer

Consolidated Engineering Company S.A.L ( Khatib and Alami )

البلد
العراق - بغداد
التعليم
بكالوريوس, Bachelor of Science Civil Engineer
الخبرات
32 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :32 years, 8 أشهر

Supervisor Site Engineer في Consolidated Engineering Company S.A.L ( Khatib and Alami )
  • العراق - بغداد
  • مايو 2023 إلى أغسطس 2023

Supervising the construction of one of the Interchanges within the first package of projects to relieve traffic congestion in Baghdad Governorate. This Project consisting of Three bridges at different levels.
The cost of this Interchange is approximately 40 Million U.S.D.

Consultant Engineer في مؤسسات و شركات مختلفه
  • العراق - بغداد
  • يناير 2017 إلى مايو 2023

Separated consultative work related to the roads and buildings projects in Iraq and Syria.

مهندس أستشاري في شركات أستشاريه متعدده
  • العراق - بغداد
  • يناير 2017 إلى مايو 2023

Separated consultative work related to the roads and buildings projects in Iraq and Syria.

Supervision Team Leader في TEAM INTERNATIONAL Engineering & Management Consultant – Lebanon
  • العراق - البصرة
  • مارس 2016 إلى نوفمبر 2016

Consultancy services for the construction supervision and related services for rehabilitation of expressway No. 1, section R7&R8 of the transport corridors project / Iraq.
- The Project Development Objective is to improve road transport connectivity and safety on selected road sections along Expressway No. 1.
The contract consists of two sections,
a) Section R7, Nasiria - Rumaila: is about 145 km in length.
b) Section R8, Rumaila - Basra & Safwan) consist of two parts, Rumaila - Safwan is 81+000 km, and Rumaila - Basra Junction is 32+900 km, Total length is 113+900 km.
- The typical cross section for this Expressway has 6-lanes divided with a wide median in addition to paved standing lanes at the edge of pavement in both directions. Flexible pavement is used for the Expressway. It consists of two asphalt layers, Asphaltic Base-course and Sub-base layers.
- The work comprises of rehabilitation of the existing road, and all parking areas, resettlement areas, airstrip, bridges and interchanges existing through the expressway, and include but not limited to:
 Repair and improvement of traffic safety measures.
 Repair of pavement distresses.
 Replacement of bearings, expansion joints and handrail on bridges.
 Construction of new check points.
 Rehabilitation of resettlement areas.
- The cost of Section R7 is USD 95, 685, 500
- The cost of Section R8 is USD 85, 842, 500
All works were in accordance to (AASHTO) Specifications.

Senior Design Engineer ( Roads ) في SIRAJ Offshore for Consulting Engineer/ Beirut office – Lebanon
  • العراق - بغداد
  • يونيو 2011 إلى ديسمبر 2015

1- Prepare the design and follow up construction supervision of road Abuja - Boyaha - Abijokola. This road is connecting city Abuja (capital) to Bogara, with length (128) km and 4-Lane single carriage way (Tow in each direction) .The cost about (100m) USD.
2- Checking and preparing the design and supervising the construction through my work as a consultant on the Link road of Kut city in Iraq. This project consists of 20 km length of Highway with two separated direction with 6 traffic lanes (3 in each direction), also consist of four interchanges with bridges and one bridge over Tigris River. The cost about (90m) USD.
3- Preparing the Geometric Design of a Calabar - Maidugri Railway Project in Nigeria, with length of 1200 km.
All works were in accordance to (AASHTO) Specifications. The Road and Railway design using Auto Cad Civil 3D program.

Resident Engineer في Consolidated Engineering Company s.a.l (Khatib & Alami)-Lebanon
  • سوريا - دمشق
  • أكتوبر 2007 إلى مايو 2011

Consultancy services for Construction Supervision for Deir Ezzor-L47 Highway Project in Syria.
The total length of this road is 102 Km, the width is 13.5m for the single part with length 91.5Km, and width 24.5m for the dowel part with length 10.5Km. This project included Trumpet Interchange with one Bridge, also included several Box and Pipe Culverts, in additional to Embankment works, and Aggregate courses, thickness 40cm and Asphalt courses, thickness 20cm (divided on three layers).
The cost is 3, 230, 000, 000 S.P (68m) USD.
All works were in accordance to (AASHTO) Specifications.

Project Manager في United Builders Corporation LTD
  • سوريا - دمشق
  • أغسطس 2004 إلى أكتوبر 2007

1-Responsible for the construction works ( reinforced concrete frameworks) for the building of machines (C.V.), with height of 43m, and the construction of machines foundations, for the benefit of Alsweidy factory for cables-Adra-Syria .
2-Responsible of the construction works for the Family Summer Club Restaurant - Damascus-Syria, including construction of asphaltic road, concrete structures, casting stamp concrete grounds, implementation of artificial lakes works, water filtration, stone revetment works, electrical wiring & sanitary piping and agricultural works.
3- Responsible for the construction works including asphaltic roads and storage yards, concrete structures, metallic frameworks, reinforced concrete grounds, electrical wiring & sanitary piping. for the benefit of Alsweidy factory for Transformers -Adra-Syria .

Project Manager في Ala'a Ismail Contracting Office
  • سوريا - دمشق
  • فبراير 2002 إلى يوليو 2004

1-Responsible of structural works for control buildings and guarding house, and foundations of electrical transformers and towers and circuit breakers, concrete cable trenches, and water drainage, asphalt and concrete roads, for the following Electrical Power Transformer Substation:
• Substation (KVA 66-230/400 ), Latakia - Syria, within Turkish - Syria connection project (main Contractor Siemens-Germany).
• Substation (KVA 66-20), Zamalka - Damascus, (main Contractor Safanico - Iran).
• Substation (KVA 66-20), Kudsaya - Damascus, (main Contractor Safanico - Iran).
• Substation (KVA 66-20), Mazzeh - Damascus, (main Contractor Barzian - Iran).
2- Responsible of the construction of metallic framework for the new cement factory project, Hama - Syria . (main Contractor Musharket Company- Iran) .

Project Engineer في Mufeed Tameem & Partners Company- Bashar Hajjar Company
  • سوريا - دمشق
  • مارس 2001 إلى يناير 2002

Responsible for all the civil works including excavation for utilities, networks, junctions, back-filling and road reinstatement, for the Installation of water supply pipes network (Ain Fijeh), Damascus -Syria

Supervisor Engineer في Al Rasheed Company
  • العراق - بغداد
  • يناير 1995 إلى ديسمبر 1997

Supervision services for construction of a road near Baghdad (12 km long with cost of $ 10 Million). The works including surveying and pavement construction.
My responsibilities including the follow up progress, program monitoring, Reports, Quality Control, Shop drawing and Materials submittals.
All works were in accordance to (AASHTO) Specifications.

Road Design Engineer في State Organization of Roads and Bridges- Planning and Designs Department
  • العراق - بغداد
  • يونيو 1988 إلى أبريل 1994

Prepare the Design and follow up construction supervision of Roads and Intersections and Interchanges (multi levels) as follows:
- Primary Studies to the Alignment of the road.
- Surveying to the land within the alignments.
- Studies to the soil and ground water level.
- Horizontal & Vertical alignments according to the type of the road needed.
- Design the pavement layers to the road.
Some of the most important projects that I had designed in Iraq :
1- Road at city of Mosul, 4-lane (2 in each Direction) length 30 km . Cost (14M USD).
2- Road near Baghdad, 4 lane (2 in each Direction), length 23 Km . Cost (10M USD).
3- Two roads on Hilla south Baghdad, 2-lane, length 42 Km . Cost (12M USD).
4- Roads in Basrah , 2-lane, total length 45 Km., cost (30M USD).
5- Many Intersection & Interchanges with one and two grades .
All works were in accordance to (AASHTO) Specifications.

Assistant Resident Engineer في State Organization of Roads and Bridges- Baghdad Abu-Graib Expressway Project
  • العراق - بغداد
  • ديسمبر 1986 إلى يونيو 1988

I was in charge of the Construction Supervision Services supported by CAWI Consult Company - Denmark .
for the parts outlined below, of the project Baghdad - Abu Ghraib Expressway . This project connect Baghdad city to Iraqi Expressway No. 1. The length is 23 km, with two separated directions, three traffic lanes and one emergency & hard shoulder lanes for each direction, Separated by a median island . This project included different type of grade-separated Interchanges, bridges, pavements, TROUGH works and infrastructure services. The Contractor was (SAMSUNG) Construction Company - South Korea, and consultant was CAWI consult-Denmark. The cost $ 150 Million.
My responsibilities including Checking the implementation of the items according to the specifications, Follow up progress, Reports, Quality Control, Invoices, Shop drawing and Materials submittals .
The work on this project was in the following Parts:
1. Supervisor on bridge / Viaduct (A 9-10) within the road. It consists of two separated bridges (3-lane with emergency & hard shoulder lanes in each direction). The type is Continuous post tension prestressed cast in situe Box Girder. It’s length is (800) m.
2. Supervising the construction of Trough within the road with the same cross section width; length (850) m, including concrete structures (walls, base, bridge piers, and pumping stations). Ground Anchors used for fixing trough base to the earth against the ground water uplift pressure. The Ground Anchors was executed by (BAUER) subcontractor for foundations construction / Germany .
3. Supervising the construction of over pass bridges within Expressway (Two bridges) including all parts, Precast Piles, Foundation, Piers, and the Super Structure. The type of this structure is post tension prestressed, cast - in Situe Box Girder.
All works were in accordance to (AASHTO) Specifications

الخلفية التعليمية

بكالوريوس, Bachelor of Science Civil Engineer
  • في University of Technology / Department of Building and Construction Engineering
  • يونيو 1983

Specialties & Skills

Civil Constructions
Consultancy for Civil Construction
Roadway Design
Design of Roads and Interchanges
Implementation of structural work for Electrical Power Transformer Substations and for Cables Factor
Supervising Construction of Roads and Bridges
Installation of water supply pipes network
Construction of Metallic Framework

اللغات

العربية
اللغة الأم
الانجليزية
متوسط

العضويات

Iraqi Engineers Union
  • Consultant Engineer
  • June 1983

التدريب و الشهادات

(Course on Enterprise Project Portfolio Management Software (Primavera P6 (تدريب)
معهد التدريب:
On Internet
تاريخ الدورة:
June 2017
المدة:
25 ساعة
Courses on Auto cad Civil 3D (تدريب)
معهد التدريب:
Azmi H. Makhoul Institute
تاريخ الدورة:
March 2013
المدة:
100 ساعة
Different subjects related to construction and design of roads and bridges (تدريب)
معهد التدريب:
State Organization of Roads and Bridges - Baghdad- Iraq
تاريخ الدورة:
June 1989
- Course on Computer software (Windows) , (Word) , (Excel) (تدريب)
معهد التدريب:
State Organization of Roads and Bridges - Baghdad- Iraq
تاريخ الدورة:
March 1992
Course on Computer program (AutoCAD) (تدريب)
معهد التدريب:
Higher Institute of Computer-Damascus-Syria
تاريخ الدورة:
April 2001
Course on Computer program (AutoCAD) (تدريب)
معهد التدريب:
State Organization of Roads and Bridges - Baghdad- Iraq
تاريخ الدورة:
August 1989

الهوايات

  • السياحه و المطالعه