1. Three (3) SAUDI
ARAMCO
APPROVALS
2. SAUDI ARAMCO
CARD, BADGE NO.#
8440204
3. Certification of
Appreciation by Saudi
Aramco for successfully
executing Shutdown
Review Scope of Work, Contract, Company Specifications, and Standards & perform the work in
compliance to the specified requirements.
Able to Assure that construction team work is in compliance with SAUDI ARAMCO/International
standards requirements, procedures, specifications and schedule Q of the project contract.
Able to Write inspection reports and initiate Non-Conformance Reports (NCRs) and Log Book entry
(LBE) as needed. Responsible for welder qualification test as per WPS and maintain record of welder
certificates and monitor of welder’s performance.
Review & Approval of Procedures Such as per applicable standards & Codes.
Review of WPSs / PQR, ITP, PMI, Method statements & NDT Procedures to comply with Client
# ABROAD PROFESSIONAL EXPERIENCE
requirements.
Inspection of Fabrication and welding of Pipeline Systems as per field weld.
Preparation of progress reports & inspection documents.
Responsible for verifying whether the welding technique and performance of Welder conform the
requirements of applicable standard.
Prepare and check the quantity and quality of the welding consumables to meet the requirements of
each project.
Preparation of test packages including weld map & weld traceability.
Monitoring daily construction activities of sub-contractors, to ensure erection is in compliance with
contract specification.
Review of Hydro test packages, NDT clearance prior to release for hydro testing
Supervise the maintenance and inspection of welding, and fabrication.
Prepare checklist and implement weekly and monthly schedules of manpower, material and
equipment.
Co-ordination with contractor’s inspectors to ensure consistent Quality / production according to
piping isometrics, support drawings and details.
Ensure the compliance of safety procedures according to the company and industry standards.
Prepare PWHT instruction, Witness PWHT activity and review the graph records.
Monitoring all calibration activities such as welding equipment’s, measuring equipment’s
Follow up and closing of NCR and log book entries.
Generating INCR’s in case of violations and monitoring corrective actions.
Reviewing of material specification and grade, material traceability reports According to Project
Specification.
Ensure that all Inspection and Test Plans, Quality Control Procedures, Project Specifications, Codes
and Standards are being followed during the project execution period.
Reviewing of weekly and monthly project quality index.
Follow up and closing of NCR and log book entries
Inspection of materials, Pipe, Structural joint Fit-up, weld root visual, etc.
Witnessing the pre-heating & post weld heat treatment and approving the charts for the same.
Witnessing the stage wise Inspection as per drawings.
Witnessing the Mechanical testing (Bend test, Tensile test & Macro tests, etc.
NDT Request offering & Radiographic film interpretation, Repair clearing & related documentation
preparation as per code and standards.
Magnetic Particle Testing with fluorescent & wet particle testing hands on experience by prod and
yoke
magnetization methods, interpretation as per the standard codes & procedures.
Stage inspection in fabrication processes for marking & material identifications as per design
specifications.
Inspect materials delivered at the project site and ensure they conform to the standards and
specifications.
Conducting inspection/test in accordance with Inspection & Test Plan (ITP) and checklist.
Maintaining all inspection and test records as appropriate.
Reporting Non-Conformance & ensuring all Non-Conformance Reports (NCR’s) are properly
documented and closed out.