Preparation of design criteria report in accordance with local, International codes and based on project requirements.
Calculation of cooling and heating loads, space distribution using Carrier's Hourly Analysis Programme (HAP) 4.9 Ver.
Selection of grilles, diffuser, louvers, FCU as per international standards.
Selection of Air-conditioning equipment including Chillers, AHU's and Package unit as per the calculation.
Ventilation calculation in line with ASHRAE 92.1-2010.
Enclosed car park ventilation calculations in line with CIBSE, ASHRAE & SBC.
Selection of Exhaust fan for Toilets, Smoke Extract Fan and Kitchen Ventilation as per the standard.
Preparation of plumbing drawings as per the International Standards and in line with SBC.
Calculation of Static head for pump selection.
Co-ordination of design drawing with other disciplines such as ID, Structure and Electrical department.
Shop drawing review based on the design drawing and the project standards/specifications.
Site inspection as a client consultant to ensure work is carried out as per the approved shop drawing and standards/specifications.
Material Approval as per Local, International Standards and Project's specifications.
Potable Water Demand Calculation in line with UPC, IPC and Local authorities regulation/guidelines (NWC)
Drainage pipe sizing in line with UPC.
Basement drainage design including sump design.
Calculation of building load using HAP 4.41 and verifying them with existing published thumb rules.
Providing best possible air conditioning solutions considering all available technologies.
Duct designing and duct routing as per SMACNA.
Selection of various equipments and accessories such as AHU, FCU, Boilers etc.
Providing ventilation solutions for kitchens and toilets as per ASHRAE standards 62.1.
Plumbing design which includes water supply (cold and hot), sewage system as per latest International plumbing code.
Preparation of Pipe Alignment sheet manually in accordance with the specifications.
Cost effective design and provide a better solution to reduce the number of bends which in turns reduce the friction and the stress at that point.
Cooling Load calculation by manual method with E-20 Form, Airflow calculation & Air Distribution to various branches of duct.
Duct size calculation by Equal Friction Method.
Duct system design following SMACNA and DW 144 codes, supervision of duct fabrication and installation of the duct work.