▪ Reviewing approved ITP & Method of Statement for factory/site work, NDT testing
requirements and raising the relevant RFI’s according to ITP prior to start the
construction/production activities.
▪ Material verification @ all stages of inspection, Dimensional inspection, welding inspection,
Final visual Inspection
▪ Make sure the Inspection & Test Plan of each activity is fulfilled and “hold & witness points” of
the company's and client team are completed in due time.
▪ Ensure all operations are carried out in complete compliance with codes and standards (such as
checklist).
▪ Review and control the fabrication activities as per the ITP (i.e. H, W, and S)/ Contract
Specification / codes and Approved Drawing.
▪ Ensuring that project is being carried out as per the Standard, Client’s requirement, approved
method of statement and ITP
Fit-up Inspection: - Inspection of the fit-ups in the In-process stage with respect to visual,
dimensional and orientation compliance as per the approved drawings and specifications. To
inspect all types of assembly like Star - Column, Column Frame, Column, Beam, Truss,
Rafter, Crane - Girder, Jack Beam, Side-wall Column, Intermediate Column, H. & V.
Bracings, Pipe bracings, Angle Bracings etc. as per drawing.
▪ Knowledge of reading and making inspection of First Angle and Third angle projection
Welding inspection: - Familiar with most of the Welding Processes like SMAW, GTAW,
FCAW, GMAW, SAW & Stud Welding for CS, Mild steel, etc.
▪ Welder Qualification test (WQT) witness. Control of welding process as per applicable WPS &
PQR requirements. Have been experienced and well versed with the codes like AWS D1.1,
ASME Section IX. Monitoring and expedition of NDT requirements.Documentation: - Preparation of different types of documentation, inspection formats.
Preparation of final dossier for small projects, shipping documents (IRN). Documentation
control certificates & technical data as required by the customer such as NDT Reports, Final
Inspection Reports, Calibration Records, and Welder Performance Certificates etc. (MTC,
Visual/Dimensional Inspection Reports, Weld Map, WPS/PQR/WQRT, NDT Reports, and
Painting Inspection Reports) Review of Final Dossiers prior to acceptance of the product.
▪ Entering basic order events into job control system. Ensuring that the expediting guidelines are
followed in quality activities.
▪ Preparing Handing over documents for the project
worked as Engineer, Had to look for the site activities and inspection related activities of Dimensional, welding and final visual as per ITP and method of statement and raise RFI, Inspection of main steel structure installation
Worked as Quality Engineer, Activities involved related of Fabrication and welding inspection of structural steel members as per ITP Preparation of Documentation related inspection and release of IRN
Worked as Quality Engineer in Piping, Perform Pre-welding fit-up inspection, for root gap, Groove angle, root-face misalignment (Hi-low) as per approved WPS, orientation and Dimension, Line check as per approved IFC drawing, Line check to verify the visual InspectionInspection of welding of piping joints
Maintaining the hourly production reports
✓ Preparing of DPR ShiftWise
✓ Ensuring the quality of the components
✓ Verified drawings refined and corrected designs for engineering.
✓ Monitoring in-house rejections and to take actions for that.
✓ Responsible to act against quality issues in In-process.
✓ Responsible for new Component Tool trials & Process establishment & improvement.
✓ Responsible for process & product audit, sample inspection.