Contracts Administrator| Senior Estimator
ARC (The Australian Reinforcing Company)
Total des années d'expérience :15 years, 10 Mois
Responsibilities
• Liaise, build relationships with clients and internal teams on projects including commercial, residential, civil construction ranging from $170k-$2M jobs
• Read, analyze and interpret drawings, take off the steel quantities and Bill of Quantities (BOQ)
• Prepare the estimated quote based on Bill of Quantities for submitting in the tender
• Liaise with Procurement, assess with new/special items in the estimating system database as required for inclusions in tender documentation.
• Manage and tracking tonnage of steel requirement with the estimated quantities and if there is any possibility to cross it the estimation, raise the flag and inform the customer upfront so that any further confusion will not raise
• Check the actual tonnage and deal with the back charge came from the customer
• Inspect sites and meeting as required
Achievements
• Developed a reinforcement estimation and schedule for Melbourne Park Redevelopment Project that saved an estimated $8000 by using site data, rather than following the typical detail and specifications
• Achieved a 15% increase in efficiency in the handling and delivery of materials to a remote location having collaborated with internal stakeholders based on the client’s list of priorities
Responsibilities
• Liaise, build relationships with clients and internal teams on projects including commercial, residential, civil construction ranging from $100k-$1.5M jobs
• Read, analyze and interpret drawings, take off the steel quantities and Bill of Quantities (BOQ)
• Prepare the estimated quote based on Bill of Quantities for submitting in the tender
• Liaise with Procurement, assess with new/special items in the estimating system database as required for inclusions in tender documentation.
• Manage and tracking tonnage of steel requirement with the estimated quantities and if there is any possibility to cross it the estimation, raise the flag and inform the customer upfront so that any further
• confusion will not raise
• Check the actual tonnage and deal with the back charge came from the customer
• Inspect sites and meeting as required
Achievements
• Developed a reinforcement estimation and schedule for Eastwood site an estimated $6000 by using site data, rather than following the typical detail and specifications
• Achieved a 10% increase in efficiency in the handling and delivery of materials to a busy location having collaborated with internal stakeholders based on the client’s list of priorities
Responsibilities
• Checked all architectural and engineering drawings, specifications, conditions of contract, schedule and other tender related documents to estimate quantity
• Performed take offs for preparing the bill of quantities (BOQ)
Responsibilities
• Read, analyze and interpret drawings, take off the required material quantities as per the specifications, standards so that customer can aware of the standard options, sizes, reflecting current pricing and specifications and these can available for the production estimation team/procurement for order preparation
• Administered master register for controlling all project documentation
• Prepared project expenditure reports, administered requests for information (RFI’s) and assisted with head contracts, progress claims, delay claims and managed external variations
• Reviewed and assessed subcontractor claims and creditor invoices
• Prepared payment schedules
• Developed construction programs and updates, tracked against site progress, implemented change controls, updated variations and communicated with client to get approvals
• Identified alternate solutions and performed value engineering to optimize time and cost by maintaining required quality
• Prepared cost forecasts and completed cost planning and budgeting as well as maintained the project budget to accurately report on monthly performance
Achievements
• Prepare around 800 telecommunication construction sites’ Bill of Quantities (standard type like Greenfield, roof top, share sites) for tender submission and process and claim for billing after completion of projects.
• Bill of Quantity preparation, check, and cost control for G+7 MSC building which is $7.5M project includes negotiation with contractors/suppliers, working closely with Procurement department
Responsibilities
• Read, analyze and interpret drawings, take off the required material quantities as per the specifications, standards so that customer can aware of the standard options, sizes, reflecting current pricing and specifications and these can available for the production estimation team/procurement for order preparation
• Administered master register for controlling all project documentation
• Reviewed and assessed subcontractor claims and creditor invoices
• Prepared payment schedules
Achievements
• Prepare around 300 telecommunication construction sites’ Bill of Quantities (standard type like Greenfield, roof top, share sites) for tender submission and process and claim for billing after completion of projects.
• Bill of Quantity preparation, check, and cost control for G+2 Remote BSC site building which is $4M project includes negotiation with contractors/suppliers, working closely with Procurement department
Responsibilities
• Estimated material and resource requirements from the design
• Prepared project scope, determined tender processes, prepared tender documents
• Prepared proposals, gathered pre-contract data and assisted with administering contracts
• Prepared estimates in building projects based on work activity and in work packages to use for the planning, organizing and scheduling of work
I have done MBA (Master of Business Administration) from the Department of Finance from the University of Dhaka
I have graduated as a Civil Engineer from Bangladesh University of Engineering and Technology (BUET) which is the number 1 ranked Engineering University in Bangladesh
I have passed Higher Secondary Certificate in the year 1998. I have obtained 760 marks on that exam from Science discipline.
I have passed Secondary School Certificate from one of the best schools in the country. I have obtained 820 marks for this exam.