Mena Kamel Abdelmalak, Senior Electrical Quality Control Engineer.

Mena Kamel Abdelmalak

Senior Electrical Quality Control Engineer.

Egyptian Union For Construction (ELHAZEK)

Location
Egypt - Cairo
Education
Bachelor's degree, Electrical engineering
Experience
13 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 6 Months

Senior Electrical Quality Control Engineer. at Egyptian Union For Construction (ELHAZEK)
  • Egypt - Cairo
  • My current job since April 2020

 Supervise and coordinate daily activities with subcontract representatives.
 Ensure current revision documents are utilized for installation.
 Responsible for the implementation of project policies, procedures, and instructions as assigned.
 Support & contribute in the permit to work/work authorization as assigned.
 Finish site works within time schedules and budgets.
 Prepare timely progress reports and coordinate with the management.
 Provide accurate information and data to management for inclusion in progress reports.
 Attend coordination meetings with the project team, client, contractors, sub-contractors and other stakeholders.
 Review and verify corrective actions established from NCR’s and discrepancy reports.
 Prepare the as-built drawings.

Electrical and instrumentation Sr. Engineer at Bechtel Oil, Gas, & Chemicals
  • Egypt - Alexandria
  • February 2017 to December 2019

Electrical and instrumentation Superintendent
 Supervise and coordinate daily activities with subcontract representatives.
 Responsible for ensuring tools & equipment are maintained, inspected & operated according to the project requirements & procedures.
 Ensure current revision documents are utilized for installation.
 Responsible for the implementation of project policies, procedures, and instructions as assigned.
 Review and verify Electrical detailed DWG. and P&IDs or other project documents as assigned.
 Support & contribute in the permit to work/work authorization as assigned.
 Support and contribute to Bechtel zero-incident program as assigned.
 Liaise, arrange and handover with back to back for shift changes.
 Finish site works within time schedules and budgets.
 Hold weekly progress meetings with the subcontractor to validate provided input and ensure progress is following the project schedule & contract requirements.
 Prepare timely progress reports and coordinate with the management.
 Provide accurate information and data to management for inclusion in progress reports.
 Attend coordination meetings with the project team, client, contractors, sub-contractors and other stakeholders.
 Review and verify corrective actions established from NCR’s and discrepancy reports.
 Prepare the as-built drawings.

Electrical and instrumentation Completions Engineer
 Manage Work inspections and punch list on TEAMWORKS, Citrix, SETROUTE and InfoWorks software.
 Track system closeout and report to PM in line with turnover
 Report completeness of construction activities and advise PM of deficiencies by way of report.
 Ensure all pre-energization & commissioning activities are witnessed by and signed off as accepted.
 Ensure compliance with the mechanical completion procedure that aligns with the project milestones
 Coordinate with the Construction Quality group to ensure records are properly prior to the status update in the TEAMWORKS.

QA/QC Electrical and instrumentation Team leader at ORASCOM Construction Industries
  • Egypt - Cairo
  • August 2010 to January 2017

Work responsibilities:
Leading team of engineers, inspectors, and technicians at the following
• Inspection and supervisor for Erection and Testing for all Electrical Activities
o Steam Turbines, Generators, Transformers, GCB, IPB, Motors, ACC, GIS, and Fuel oil treatment
o MV and LV Switchgears and HV, MV, LV and Control Cables (Megger, HI pot Test) and make sure it complies with drawings, SLD, Protection Philosophy of contract and Specs.
• Inspection and supervisor for Erection and Testing for all Instrumentation Activities
o Temperature, Pressure, Flow, Level and vibration Transmitters, Elements and Indicators
o Control Valves, Motorized Valves, Safety Valves and Hydraulic Valves
o Instruments Tubing and Instrumentation air lines
o DCS, Control Panels, Optical Fiber, HMIs, Ethernet and Topology of power plant and make sure it complies with drawings, Hookup, P&ID, Process Diagram and Specs.
• Implement / prepare quality procedures and documentations systems considering the project requirements and needs.
• Preparing analysis of NCR's (Non-Conformance Reports) and timely presenting to respective project leaders for corrective and preventive actions
• Closing of NCR's on Quality audits in discussions with concerned site In- charges.
• Review method of statement
• Ensure the works result meet clients and Project Contractual requirements regarding the Quality Standards.
• Regular Daily Site visits to ensure QA Procedures are applied properly
• Participate with the construction team to close all punch list items.
• Participate with commissioning team in first fire for the turbines, back energize, Steam Below & hot cleaning
• Prepare Turnover packages TOP with all required documentation.

Electrical Engineer at ORASCOM Construction idustries
  • Egypt - Cairo
  • October 2011 to February 2013

MIVIDA Villas Project (Parcel 5), New Cairo city, Egypt
Owner: Emaar
Consultant: Egyptian Group for Engineering Consulting (EGEC)


Work responsibilities:
• Supervise the electrical installation of the project
• Finish site work within time schedules and budgets.
• Direct the site work crew and the subcontractors
• Prepare the as-built drawings
• Quantity surveying of the materials for each trade
• Revise shop drawings & composite drawings
• Report the project progress to management
• Revise the purchase orders
• Receive and review the materials in the project
• Handover the finished work to the consultant and the owner
• The jobs execute under the OSHA safety standard (29 CFR 1926) for construction safety and health in sites.

Manage work operation involving erection, installation, testing and commissioning for the following activities
• Power system including pulling cables, cables testing, cables termination and distribution panels installation
• Lighting System including conducts installation, pulling cables and termination and fixture, switches, and panels installation
• Light current systems (Telephone and data)

Electrical engineer at ORASCOM Construction Industries
  • Egypt - Cairo
  • August 2010 to October 2011

Housing and Development Bank Headquarters Building, 5th settlement, New Cairo City, Egypt
Owner: Housing and Development Bank
Consultant: Engineering Consultants Group (ECG)


Work responsibilities:
• Supervise the electrical installation of the project
• Finish site work within time schedules and budgets.
• Direct the site work crew and the subcontractors
• Prepare the as-built drawings
• Quantity surveying of the materials for each trade
• Revise shop drawings & composite drawings
• Report the project progress to management
• Revise the purchase orders
• Receive and review the materials in the project
• Handover the finished work to the consultant and the owner
• The jobs execute under the OSHA safety standard (29 CFR 1926) for construction safety and health in sites.

Manage work operation involving erection, installation, testing and commissioning for the following activities
• Power system including Ring main unit (RMU), distribution transformers, Switch gear, cable trays, pulling cables, cables testing, cables termination and distribution panels installation
• Lighting System including conducts installation (PVC, EMT & RGS), pulling cables and termination and fixture, switches, and panels installation
• Light current systems (Telephone, Data, Fire alarm, Firefighting (FM200 & CO2), Building management system (BMS), Public address, Master clock and satellite)
• Earthing system

Education

Bachelor's degree, Electrical engineering
  • at Faculty of engineering
  • November 2010

Specialties & Skills

Electrical
oil gas
Quality Control
Instrumentation
PowerPlant
AutoCAD
Microsoft Office suite such as MS Word, MS Excel and Power Point
Lv experence
Site Supervision
Engineering
Boilers
leadership
HV Cables
Communication skills
Instrumentation
Testing
Transformers
Oil and gas
Compleations
Turnover
Generators
MV Equipment
Steam Turbine
Gas Turbine
Gas compressors
Fiber Optic
power plant
Instrumentation and control

Languages

English
Expert

Memberships

Egyptian engineers syndcate
  • 86/08412
  • January 2011

Training and Certifications

OSHA (Certificate)
Date Attended:
May 2017
Global System for Mobile communications (GSM) (Training)
Training Institute:
High Technology Center (HTC), Cairo University
Date Attended:
July 2009

Hobbies

  • Reading, music and football