Mhamad Lamaa,  LEED Green Associate (R) | Senior Architectural Coordinator

Mhamad Lamaa

LEED Green Associate (R) | Senior Architectural Coordinator

NATCON

البلد
لبنان - بيروت
التعليم
بكالوريوس, Architectural Engineering
الخبرات
15 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 10 أشهر

LEED Green Associate (R) | Senior Architectural Coordinator في NATCON
  • لبنان
  • أشغل هذه الوظيفة منذ مايو 2016
Senior Architect في RAMCO Trading and Contracting S.A.L.
  • لبنان - بيروت
  • فبراير 2015 إلى أبريل 2016

Project: Beirut 700

Residential Tower (G+23) | Owner & Developer: Ammache Group | Consultant: Khatib & Alami, Hawa & Moujaes.

• Composite drawings.
• Finishing and electro-mechanical coordination.
• Execution supervision.

Section Architect / Finishing Coordinator في RAMCO Trading and Contracting S.A.L.
  • لبنان
  • يناير 2014 إلى فبراير 2015

Project: RAWCHE VIEW AT 1090 |
Residential Tower (G+22) | Owner & Developer: United Real Estate Co. | Consultant: Khatib & Alami | ID & Landscape design: Creative Studio 11

• Being a member of the main contractor team
• Responsible for the ID section: Main entrance lobby, Health club & Landscape
• Follow the finishing scopes from technical floor to B5
• Execution coordination
• Preparing mock ups for ID & consultant inspection
• Responsible for facades stone cladding by preparing cutting lists, controlling the fixation progress, monitoring the stone codes & stocks

Project Architect / Assistant Project Manager في RAMCO Trading and Contracting s.a.l.
  • لبنان - بيروت
  • أبريل 2012 إلى يناير 2014

Control all the project architectural drawings.

Be the only responsible for any updated drawing.

Stay up to date with the clients through emailing the latest drawings and send the updated information and project's data.

Following the different subcontractors and coordinate the drawings with the subcontractors ones.

Ensure that the shop drawings are executed properly on site in a professional way in order to meet the project's standards and the high end details and materials.

Keep the Projects Manager up to dated with all the ongoing works and give the tasks to the foreman and all the skilled labors day by day.

Order the needed materials from the different suppliers and request many quotations and data sheets to select the appropriate quality and price.

Gathering all the data sheets from all the suppliers and send the needed ones to the consultant in order to have the approval.

Update the head office with the important data and updates from the field.

Attend the Clients meetings at the site offices in order to reach a final solution between the design and the execution.

Attend all the Interior Designers meetings at the site offices and their design offices in order to coordinate all the data to stay away from any misunderstanding and keep the design drawings updated with the site limitations.

Help the projects manager in preparing all the needed schedules for cladding, paint, marble...and all other finishing scopes.

Prepare the subcontractors payments certificates and update the auditors with the latest works and contracts.

Hand over the works from the subcontractors when they submit the FIR Field Inspection Request.

Projects Engineer في The Phoenicians for contracting s.a.r.l.
  • لبنان - بيروت
  • يونيو 2011 إلى أبريل 2012

As a Projects Engineer, i started in the renovation of the BLC Bank - St. Michel branch.

I started from demolishing till the final snags then the handing over for the consultant representative (ERGA) and the Owner.

Following all the drawings and coordination meetings, shop drawings, emails and subcontractors scopes...

sending the feedback and updates to the Head office with a daily report for all the ongoing works in the field.

The same task at the same time was going at BLC Bank-Hazmiye Branch.

3rd project i followed, was an offices extension and renovation for TABET OFFICES "la maison de blanc".

During the same period of time, i worked on the 3 fileds, spending the day time in jumping from site to site and following all the ongoing works through mobile calls and many coordinations.

Owner - Free Lancer في Mhamad Lamaa-Architectural Engineer (Free Lancer)
  • لبنان - بيروت
  • فبراير 2011 إلى يونيو 2011

Mhamad Lamaa
Architectural Engineer
Renovation-Restoration-Construction-Interior Execution-Finishing-Site Supervision-Shop Drawings.

I worked during this period of time as a Freelancer with some clients.

1- Supervision, shop drawings, interior execution for a Luxurious apartment in Kreitem-Beirut.

2-Supervision, shop drawings, interior execution, sub-contractor for a luxurious apartment in Rawche-Beirut.

3-Renovation for 2 old shops and hand over it to the owner.i was the main contractor.

4-subcontractor for finishing works, curtain glass and others in a luxurious apartment in rawche-Beirut.

5-subcontractor for HVAC works in a luxurious apartment in Mathaf-Beirut.

6-CPH magazine office: as built drawings and material consultancy

add to this many desing works and buildings permits in the region of Mount Lebanon.

Finally, the most important job i did through my free lancing experience is "Projects Pricing".

Project Architect في Jaber Group
  • لبنان - بيروت
  • يونيو 2009 إلى فبراير 2011

1-working as a site architect in an old G+11 building.

this tower was THE MINISTRY OF ECONOMY and have been purchased by Jaber Group.

I was responsible for all the Renovation works in this building including the on site designs, execution drawings, materials selection, material purchase, structural renovation, finishing follow up and snagging, electrical works, mechanical works and coordination between all the subcontractors.

I reported directly to the CEO of Jaber Group.

later on i started to sale the apartments to the clients and explain all properties and options of the product.

2-working in the 2nd project in the phase of excavation and diaphragm wall.

the project was a student's dormitories (G+10).
I was following the excavation works as per the basements layouts (3 basements) in a sandy soil with the excavation subcontractors.

counting the trucks and order the needed gravels and concrete.

Site Engineer - QA/QC Architect في KOCHACE ENTERPRISE L.L.C. (Oger Abu Dhabi sub-contractor)
  • الإمارات العربية المتحدة - العين
  • أغسطس 2008 إلى مايو 2009

UAE university new campus PPP development ( 1.58 billions AED ) .
consultant :COX Group Pty Ltd.

Leading the finishing teams and following the consultant snag lists and apply it in order to reach the handing over phase and deliver the final product to the main contractor and client.

Following the quality control and quality assurance paper work and respond to the main contractor requests and snags.

Coordination between different shop drawings for the project.

Dealing with different nationalities gave me the experience in how to deliver the ideas and tasks in a proper way.

Quality Approvals - Quality Control - Submittals - Coordination with Main contractor - Site Coordination - Quantity surveying - Condas furniture submittals - Shop drawings - Interventions - Invoices - Handing Overs - MIR - WIR - Snag check List works .

Free Lancer - As Built & execution drawings في OGER LIBAN
  • لبنان - طرابلس
  • يوليو 2008 إلى أغسطس 2008

I took the task of doing an as built drawings for an old archeological house in Batroun city. this house will be a social center for the area.

my task as a freelancer is to survey the outdoor and the indoor of the house and draw all the plans and sections.

i did a portfolio with autocad drawings for the project and sent it to OGER LIBAN.

الخلفية التعليمية

بكالوريوس, Architectural Engineering
  • في Beirut Arab University B.A.U.
  • يوليو 2008

Faculty of Architectural Engineering - Five-year Full-time degree

Specialties & Skills

3D Studio Max
Microsoft Office
Adobe Photoshop
AutoCAD
ADOBE PHOTOSHOP CS6
AUTOCAD
BUILDING MATERIALS
Project's pricing
Outlook mailing
Softwares & Hardwares
Google Sketchup

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الفرنسية
متوسط

العضويات

Engineers and Architects syndicate-Beirut (Ordre des Ingenieurs et Architectes - Beyrouth)
  • Member
  • June 2009

التدريب و الشهادات

written certificate from AISO (الشهادة)
تاريخ الدورة:
August 2007
صالحة لغاية:
October 2007

الهوايات

  • Music
    House and trance music
  • Finishing techniques
    Stay up to date with latest finishing techniques by watching videos and reading articles...