Mian Muhammad Naeem,

Mian Muhammad Naeem

RPM

Lieu
Oman - Muscat
Éducation
Etudes secondaires ou équivalent, Electrical
Expérience
10 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :10 years, 9 Mois

à RPM
  • Émirats Arabes Unis
  • décembre 2015 à juin 2017

Experience of Testing Equipment:
I have experience to use the testing equipment.
•Site Master( Bird, Enritsu)
•Power Meter
•Laptop (Site Maintenance to check over all working of BTS)
•Multi Meter (Analog/digital)

Team lead (Site Engineer) à PTML
  • Pakistan
  • mai 2011 à novembre 2015

Worked with NEC Pasolink and NEC Pasolink NEC, Alcatel systems
•Troubleshooting and fault tracing was done by me.
•Having good knowledge about METS Genset and its operations.
•Media troubleshooting from site to BSC for path availability.
•Troubleshooting and configurations done with Huawei power quip systems.
•Installation, commissioning of RTN-620, RTN-950 & RTN-910 MW links.
•Making services and traffic shifting of sites.
•Having good knowledge and ability to work on Web LCT T2000 and U2000.
•Trouble shooting of different type of fault regarding DBS 3900, BTS3012, BTS3012AE.
•Rectification of power equipment.
• Fault rectification of VSWR issues.
•Hands on Experience on HUAWEI LMT for Alarms monitoring and Site Configuration check
•Optical Fiber Cable splicing & ODF patching,
Troubleshooting of O/F cut locating the fault using OTDR meter & perform splicing activates,
Attend planned outages for the smooth operation & maintenance of BSS
Power up Rectifier and all Equipment Racks.
•Power Equipment, Ericson, All Type of Batteries, ACB, DCB, POWER CUBE 1000

Site Engineer à Huawei Telecom (Pvt.) Ltd
  • janvier 2007 à avril 2011

Ufone project
•Installation and integration of BTS 3012, BTS3012 AE and BTS 3900 (3G supported)
•Installation and commissioning of MW antennas and NEC Passolink, RTN620, 910 and RTN950 configuration.
•Fault troubleshooting and rectifying regarding MW and BTS.
•Making cross connection and services as per requirements.
•RTN related fault tracing and troubleshooting.
•Installation of different type of rack (MSC, BSC, BTS, SDH, Rectifier, ACDC Cabinet, DDF Rack)
•Doing patching for BTS and microwave and troubleshooting, done loop test and E1 testing.
•Make all type of connector (Jumper Cable Connector, Feeder Cable Connector, BNC Connector, L.Type State Connector)
•Power up Rectifier all Equipment Racks.
•Installation of RF Antennas and Micro Wave.
ATP (Acceptance testing procedure) of Indoor & outdoor system
•PTCL Project
•Installation/commissioning of indoor BTS 3900.
•Assembling & installation of RRU.
•Power and bts pad of PTCL BTS sites
•Swapping of old BTS 3606 with new BTS 3900

Senior Team Lead à Advance Star Link ) (Pvt.) Ltd Sub Contractor of Huawei
  • octobre 2006 à décembre 2007

Laying and preparation of Data cable connector.
•Worked with (O & M) BSS Department for fault rectification at BTS Sites.
•Conducted indoor/Outdoor ATP of BTS site with Huawei.

Éducation

Etudes secondaires ou équivalent, Electrical
  • à Poly Technical Collage Siaklo
  • janvier 2004

(

Etudes secondaires ou équivalent,
  • à Islamia High School Chawind
  • janvier 2000

(Science)

Langues

Anglais
Expert
Punjabi
Expert
Urdu
Expert