Mian Muhammad Naeem,

Mian Muhammad Naeem

RPM

Location
Oman - Muscat
Education
High school or equivalent, Electrical
Experience
10 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :10 years, 9 Months

at RPM
  • United Arab Emirates
  • December 2015 to June 2017

Experience of Testing Equipment:
I have experience to use the testing equipment.
•Site Master( Bird, Enritsu)
•Power Meter
•Laptop (Site Maintenance to check over all working of BTS)
•Multi Meter (Analog/digital)

Team lead (Site Engineer) at PTML
  • Pakistan
  • May 2011 to November 2015

Worked with NEC Pasolink and NEC Pasolink NEC, Alcatel systems
•Troubleshooting and fault tracing was done by me.
•Having good knowledge about METS Genset and its operations.
•Media troubleshooting from site to BSC for path availability.
•Troubleshooting and configurations done with Huawei power quip systems.
•Installation, commissioning of RTN-620, RTN-950 & RTN-910 MW links.
•Making services and traffic shifting of sites.
•Having good knowledge and ability to work on Web LCT T2000 and U2000.
•Trouble shooting of different type of fault regarding DBS 3900, BTS3012, BTS3012AE.
•Rectification of power equipment.
• Fault rectification of VSWR issues.
•Hands on Experience on HUAWEI LMT for Alarms monitoring and Site Configuration check
•Optical Fiber Cable splicing & ODF patching,
Troubleshooting of O/F cut locating the fault using OTDR meter & perform splicing activates,
Attend planned outages for the smooth operation & maintenance of BSS
Power up Rectifier and all Equipment Racks.
•Power Equipment, Ericson, All Type of Batteries, ACB, DCB, POWER CUBE 1000

Site Engineer at Huawei Telecom (Pvt.) Ltd
  • January 2007 to April 2011

Ufone project
•Installation and integration of BTS 3012, BTS3012 AE and BTS 3900 (3G supported)
•Installation and commissioning of MW antennas and NEC Passolink, RTN620, 910 and RTN950 configuration.
•Fault troubleshooting and rectifying regarding MW and BTS.
•Making cross connection and services as per requirements.
•RTN related fault tracing and troubleshooting.
•Installation of different type of rack (MSC, BSC, BTS, SDH, Rectifier, ACDC Cabinet, DDF Rack)
•Doing patching for BTS and microwave and troubleshooting, done loop test and E1 testing.
•Make all type of connector (Jumper Cable Connector, Feeder Cable Connector, BNC Connector, L.Type State Connector)
•Power up Rectifier all Equipment Racks.
•Installation of RF Antennas and Micro Wave.
ATP (Acceptance testing procedure) of Indoor & outdoor system
•PTCL Project
•Installation/commissioning of indoor BTS 3900.
•Assembling & installation of RRU.
•Power and bts pad of PTCL BTS sites
•Swapping of old BTS 3606 with new BTS 3900

Senior Team Lead at Advance Star Link ) (Pvt.) Ltd Sub Contractor of Huawei
  • October 2006 to December 2007

Laying and preparation of Data cable connector.
•Worked with (O & M) BSS Department for fault rectification at BTS Sites.
•Conducted indoor/Outdoor ATP of BTS site with Huawei.

Education

High school or equivalent, Electrical
  • at Poly Technical Collage Siaklo
  • January 2004

(

High school or equivalent,
  • at Islamia High School Chawind
  • January 2000

(Science)

Languages

English
Expert
Punjabi
Expert
Urdu
Expert