UZ750 - Islands Surface Facilities project
Area responsible for civil, piping and EIT underground works
- 20355 m³ concrete works
- 12459 ID underground pipe installation
- 1254 KM cable pulling
Two residential towers (twenty-five stories) and one commercial building (eight stories)
Site engineer, in charge of concrete and finishing works as per site conditions and completion priorities.
- Post tension slabs were used in the project
- Climbing system was followed while executing the core wall
- Wire mesh and L-shape angle used for concrete masonry unit work
- Execution of a pool
- Execution of complex architectural elements
MS project - design of a 4-stories hospital -The analysis and design were performed using the softwares ETABS and SAFE. -The structural system used is dual system consisting of shear walls and intermediate moment resisting frame. -The calculations and assumptions were based on the following codes: ACI-318M-05, UBC-97, ASCE-07. -The analysis method used in the project was the equivalent static lateral load