BP WND Project
Pre commissioning and Commissioning activities for greenfield facility that will tie-in to a brownfield facility that will be refurbished, modified and preserved ready for operations.

 Review Work Authorization requests, ensure that all work covered by the WA is complete and that the affected equipment can safely be returned to operation.
 Determine the appropriateness of the requested work activities.
 Verify work complete and assess the quality of work carried out.
 Perform required re-testing when work is completed.
 Manage Preventive Maintenance work for the running equipment.
 Confirm that the commissioning cleanliness strategy for pipelines, Heat Exchangers, Vessels and equipment are applied before the preservation process.
 Plan, conduct and coordinate detailed phases of startup, operations, or maintenance for a project, including reviews of designs for plant operability and safety and jobsite pre-commissioning and startup assignments as directed
 Coordinate startup between project engineering, construction, specialty staff groups, clients, and vendors.

Mechanical Maintenance section head في Mercedes-Benz Egypt
  • مصر - القاهرة
  • ديسمبر 2010 إلى أكتوبر 2016

Egyptian-German Automotive Company: to assemble vehicles of Mercedes-Benz brand.;
 Apply TPM, Corrective, Preventive and Predictive Maintenance for machines/ equipment in the
Production line and Utilities area (Hoists- Pumps- Compressors- Boilers-Burners-Chemical tanks-
Heat Exchangers- AHU- Hydraulic, Pneumatic systems and special filling machines).
 Use CMMS program.
 Manage drawing/documentation systems to defined performance levels.
 Manage stores inventory to restock and reorder spare parts Foreign &local.
 Prepare consolidated work lists for shutdown as well as preliminary estimates of manpower and
material.
 Direct, instruct and supervise maintenance technicians.
 Prepare different projects visibility studies
 Estimate the cost projects on the basis of labor charges, time, used material, tolls and other
technical challenges.
 Define the project tasks as well as the requirements of resources.
 Connect with equipment suppliers and exchange information to find technical solution for
problems.
 Perform successfully troubleshooting and diagnose breakdown problems to increase the
efficiency for factory.
 Prepare internal audit according to DAIMLER procedure, beside shop floor management (5S
implementation and continuous improvement).
 Be responsible for any required manufacturing work (factory workshop and outsourcing
manufacturing work).

Sr-Start up Engineer في Bechtel
  • الإمارات العربية المتحدة - أبو ظبي
  • مايو 2008 إلى أبريل 2010

Responsible for Pre-commissioning, Commissioning activities and turnover of start-up systems to the owner (GASCO):
1) Nitrogen generation and Air Compressor system ( Air Products)
2) Steam Generation and Condensate system (Package Boilers)
3) Gas Turbine (GE).
4) Gas dehydration/NGL recovery unit.
5) Propane and Residue gas Compressors (GE & Elliott Ebara).
6) Fire Fighting system.
 Apply all HSE requirements (Safety awareness license from GASCO - Safety training from
Bechtel).
 Review work permits (LOTO, coordinate between Safety, Mechanical and E&I departments).
 Review system design manuals and operation manuals to apply the optimum condition for
system start-up and operation.
 Review drawings, documents, data sheets and piping isometric.
 Inspect and test procedures (Static & Rotating equipment).
 Coordinate contractor/subcontractor work scopes.
 Coordinate with E & I Discipline Engineers.
 Be responsible for preparation of material requisitions.
 Schedule and prioritize the activities to accomplish assigned tasks.
 Check the progress of the activities carried out by the vendors and contractors.
 Prepare the reports on the basis of the work done during the commissioning activity and submit
them to the commissioning manager.
 Issue procedures for different systems:-
Loading Refrigerant, Desiccant, Perlite, unloading Liquid Nitrogen, power flushing, steam blow,
High Pressure leak test and Dry out for different systems.

Shift Engineer في Cairo North Power Station
  • مصر - القاهرة
  • يناير 2005 إلى أبريل 2008

Combined cycle Power Station: - 2×250 Mw frame 9f gas turbine (GE) controlled by Mark VI, steam turbine (Alstom), HRSG (NEM), electrical systems up to 220Kv and three Gas Compressors.
 Attend the installation, commissioning and the start-up till the end of the project
working with GE, NEM and ALSTOM teams during the commissioning till the reliability test.
 Use DCS to control the whole plant.
 Isolate different systems electrically and mechanically
 Start up and shut down the turbine safely.

الخلفية التعليمية

بكالوريوس, Mechanical power
  • في Faculty of Engineering
  • مايو 2004

Specialties & Skills

Inspection
Commissioning
Data Sheets

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

PMP , Certified Project Manager (الشهادة)
تاريخ الدورة:
July 2017
صالحة لغاية:
July 2020
CMMS (Computerized Maintenance Management System ) (تدريب)
معهد التدريب:
C Work Company
تاريخ الدورة:
July 2013
O&M for Gas turbine GE f9 (تدريب)
معهد التدريب:
GE
تاريخ الدورة:
March 2007
HSE & Safety awareness (تدريب)
معهد التدريب:
Gasco UAE
تاريخ الدورة:
July 2009
O&M for Heat Recovery Steam Generation (تدريب)
معهد التدريب:
Nem Company - HOLLAND
تاريخ الدورة:
November 2006