TELECOM ROLLOUT ENGINEER
GULF BUSINESS HORIZON
مجموع سنوات الخبرة :14 years, 9 أشهر
• LTE. (4G) project with
o Commissioning node B and get RRH reachable.
o Installing antennas, RRH, fiber, power cables, GPS, and node B.
o Check all connections of GPS to adjustment synchronization.
• GSM. (2G) troubleshooting for Alcatel BTS (GSM & DCS) traffic problems.
o Cross feeder and cross section.
o Down sector, combiner, TRE, twin and MCTRX.
o VSWR Measurement with Site Master and clear alarms.
• New link Alcatel microwave installation.
o Installation & alignment of (0.3-0.6-1.2-1.8-2.4) dishes.
o Installation & configuration for all Alcatel transmission links as (AWY, LUX 50, MPR and MXC) and its software.
o Making new routes.
• Swap AWY microwave with MPR9500 project.
o Preparing for MDT (download IDU & ODU configurations).
o Check site access.
o Check up the equipment to avoid faulty parts.
o Installing new IDU and replace ODU with new version.
o Then making traffic cutover to the new PCM route
• SWAP 2G & 3G Project with Alcatel-Lucent
o Remove old Siemens 900 or 1800 BTS and sometimes both
o Installation of new 9100 BTS & making all Configuration & commissioning
o Installation of new DDF & alarms and check it with NOC and get the site up.
o Check cross in both section and feeders with drive tester.
• SWAP Transmission with MPR9500.
o Preparing for MDT (download IDU & ODU configurations).
o Check site access.
o Check up the equipment to avoid faulty parts.
o Installing new IDU and replace ODU with new version.
o Then making traffic cutover to the new PCM route.
• New site installation (RF& Telecom).
o Installation of antennas and its mechanical & electrical tilt.
o Determination for feeder length and installation of the connectors.
o Installing the feeders and measure the VSWR and optimize its values.
o Installing the MW link and make the new route
o Installing the 2G 900 & 1800 BTS and check alarms with NOC
• Checking the down 2G site`s and down sectors and clear all the appeared alarms :-
• Make the required maintenance and troubleshooting for 2G Alcatel 9100A BTS
• Make the required maintenance and troubleshooting for ( Alcatel 9400 AWY ) microwave links
• make new routes for new 3G sites
• use site master for clear the VSWR alarms
• coordinate technicians for clearing environmental alarms from sites and making the required PM for sites
installation and commissioning of NEC MW Equipments. (Neo Compaq) for Mobinil company
LOS & site Survey for Etisalat Company and make the required Reports as standards.
RF Installation. (Antennas and feeders)
Using site master for making the required sweep test for feeders
Work as civil site engineer in the following projects:
Etisalat GRDU. project (quick site) (all civil work about installing the tower and shelter )
Mobinil GRDU. project
Mobinil repair project(Alex.)
Grade: pass • Graduation Project "MOBILE JAMMER" Excellent Degree