Michael Sarceno, INSTRUMENT FOREMAN

Michael Sarceno

INSTRUMENT FOREMAN

MOHAMMAD AL-MOJIL GROUP

Location
Philippines
Education
Bachelor's degree, ELECTRICAL ENGINEERING
Experience
11 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 10 Months

INSTRUMENT FOREMAN at MOHAMMAD AL-MOJIL GROUP
  • Saudi Arabia - Jubail
  • June 2011 to March 2013

June 17, 2011- March 24, 2013 - INSTRUMENT FOREMAN
MOHAMMAD AL-MOJIL GROUP
Cogen project
Manifa, K.S.A.
Responsibilities: Supervision and assist of works. performing activities. Installation of instrument stanchion, junction box and secondary cable tray and supports. installation of inline instruments. installation of transmitters such as level / flow / pressure. Installation of impulse and airline tubing, cable pulling of control cable. Loop check, megger, gland and termination of control cable from instrument to junction box. Every morning I meet my people to discuss about the schedule of works for every groups and the most important is safety of the workers.

INSTRUMENT FOREMAN at QATAR KENTZ
  • Qatar - Doha
  • July 2009 to February 2011

July 15, 2009 - Feb. 22, 2011 - INSTRUMENT FOREMAN
QATAR KENTZ ( W.L.L.)
Shell Pearl GTL Project
Ras Laffan Industrial City,
State of Qatar

Responsibilities: Supervision and assist of works. performing activities, Installation of instruments such as level / flow and pressure transmitters, secondary sable tray and supports. Cable pulling for secondary control cable. Gland and termination of control cable from junction box to Instrument. Installation of instrument stanchion. indicator alarm. differential pressure alarm, Flow and level indicator. Installation of impulse and air line tubing. As a foreman, I do took charge in withdrawing material and power tools from the warehouse, then brought to my men for proper distribution to different group of member in which assignment areas and review the plans for the standard procedure of instrumentation. Meeting every morning about safety rules. Give instructions about schedule of work.

ELECTRICAL -INSTRUMENT FOREMAN at CONSOLIDATED CONSTRACTORS COMPANY
  • Saudi Arabia - Jubail
  • February 2007 to February 2009

Feb. 26, 2007 - Feb. 26, 2009 - ELECTRICAL -INSTRUMENT FOREMAN
CONSOLIDATED CONSTRACTORS COMPANY
Khursaniyah Gas Plant Project (KGPP)
Kingdom of Saudi Arabia
(Saudi Aramco Project)

Responsibilities: Supervision and assist of works. performing activities, Installation of different kind of electrical - instrument device. Installation of exposed and underground conduit, Power and Instrument cable tray, Pipe rack and street lighting. As a foreman, I do took charge in withdrawing material and power tools from the warehouse, then brought to my men for proper distribution to different group of member in which assignment areas and review the plans for the standard procedure of electrical and instrument. Meeting every morning about safety rules. Give instructions about schedule of work.

CADET ENGINEER at ILIGAN LIGHT and POWER INC
  • Philippines
  • August 2000 to January 2003

August 15, 2000 - January 29, 2003 -- CADET ENGINEER
ILIGAN LIGHT and POWER INC.
La Salle Road, Iligan City
Responsibilities:
Undergoes training and report preparation in all progress units. Prepares daily operating reports of all units. Assist the daily works of assign engr.

ELECTRICIAN at AGAP ARABIA LIMITED
  • Saudi Arabia - Jubail
  • July 1992 to July 1994

July 08, 1992 - July 08, 1994 - ELECTRICIAN
AGAP ARABIA LIMITED
Kingdom of Saudi Arabia
1. Dammam Glass Plant
2. Safaniya GOSP - 4
3. Zuluf Wet Crude Handling Project
4. Off - Shore

Responsibilities:
Termination of panel boards, Installation and Termination of controls, Termination of motors, Termination of cut-out box, Check-up of electrical apparatus, Repair and Maintain HVAC, Cable pulling, Lay-out of electrical plans, Installation and Termination of instruments. Cable pulling of electrical and instrument cables. Installation of power and control
cable tray.

ELECTRICIAN at ENGINEERING EQUIPMENT INC
  • Philippines
  • September 1990 to April 1992

September 21, 1990- April 4, 1992- ELECTRICIAN
ENGINEERING EQUIPMENT INC. (EEI)
NSC Hot Mill Expansion Project
Tominobo, Iligan City


Responsibilities:
Installation of exposed and underground electrical conduits. Installation of power and instrument cable trays. Installation of pull box. Preparation and Installation of support of bus bars. Installation of grounding. Installation of street and building wiring.

Education

Bachelor's degree, ELECTRICAL ENGINEERING
  • at Cagayan de Oro College
  • October 1999

1994 - 1999 - BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING Cagayan de Oro College Carmen, Cagayan de Oro City EXAM. PASSED: Registered Electrical Engineering Licensure Exam. Registered Master Electrician Licensure Exam.

Specialties & Skills

Instrumentation
Instrument Development
College Recruiting
College Relations
College Access
ENGINEER
GAS PLANT
INSTRUMENTATION
LIGHTING
TRAINING

Languages

English
Intermediate
Tagalog
Expert

Memberships

Institute of Integrated Electrical Engineers
  • Life Time Member
  • June 2001

Training and Certifications

Training (Certificate)
Date Attended:
February 2010
Valid Until:
February 2010