Michael Tyrone Alinell, Electrical Engineer

Michael Tyrone Alinell

Electrical Engineer

Jash Technical Services

Lieu
Arabie Saoudite - Riyad
Éducation
Baccalauréat, Electrical Engineering
Expérience
12 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :12 years, 10 Mois

Electrical Engineer à Jash Technical Services
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis juin 2022

I joined this company and was assigned at King Abdullah Financial District Community Project (Wadi, Area 303 and Grand Mosque) to implement, maintain and improve the performance of machineries & systems, procurement of electrical items, tools, etc. and lead the team of technicians in their daily routine activities.
Duties and responsibilities:
• Maintain corrective and preventive maintenance records of electrical and low-current systems (CCTV, Access Control, Fire Alarm, BMS).
• Responsible for repair, modification, upgrade and testing of non-working systems such as water feature (fountain systems) and UV sterilization system.
• Responsible for the inspection, maintenance, and security of all tools, equipment and personal protective clothing and shall be responsible for conducting an annual inventory of the same.
• Develops, establishes, recommends, and enforces safety practices applicable to electrical systems.
• Maintain, test, and certify electrical supply networks including power distribution boards, panels, facilities, receptacles, lighting switches, cables/wiring, electric motors, electric pump stations, and equipment.
• Manage a team of electricians to ensure all work is repaired and installed to the highest standards in accordance with the applicable electrical standards.
• Performs other work as required including assisting other trades.
• Consulted with clients & superiors on progress and issues.

R&D Electrical Engineer à Libertas Engineering
  • Philippines - Manille
  • novembre 2021 à janvier 2022

I joined this company and was assigned at Shop/Laboratory to perform and experiment various alternative sources of energy. Part of the contract consists of design, research, and implementation of assigned projects as per stakeholder instructions.
Duties and responsibilities:
• Perform various engineering research and solutions, prototyping and testing.
• Record daily lab notes and weekly executive engineering report for stakeholder project notes and status reporting.
• Lead all aspects of electrical engineering for all products during duty in project.
• Rendering 3D designs using Blender tool.
• Performing ad-hoc tasks that maybe assigned in accordance with business needs.
• Research in electrical engineering in terms of alternative power generation, battery storage and other related disciplines.

Senior Testing and Commissioning Engineer à Global Estate Resorts, Inc.
  • Philippines - Taguig
  • mars 2021 à novembre 2021

I joined this company and was assigned at different projects at different locations. Focal point of being senior testing & commissioning engineer and quality control engineer at the same time required documentation, evaluation, inspection and testing of GERI MEPFS facilities. Projects involved were the following:
 Upgrade design, evaluation, installation and testing/commissioning of STP systems of Twin Lakes Hotel (Laurel, Batangas) and Holland Park (Binan, Laguna)
 Standby diesel generator synchronization of Holland Parks 1 & 2
 LV switchgear switching and energization at Southwoods Mall
 Testing and commissioning of fire alarm, CCTV systems at Twin Lakes Hotel
 Testing and commissioning of staircase pressurization and smoke extraction fans (SMEF) at Twin Lakes Hotel.
 Testing and commissioning of BMS (Building Management Systems) Twin Lakes Hotel.
Duties and responsibilities:
 Develop and provide all testing and commissioning forms for all MEPFS system.
 Review and comment all the MEPFS engineering design drawing and project specifications.
 Review and comment on all MEPF contractor’s installation and testing method statements.
 Attend all the testing and commissioning of all GERI’s projects.
 Develop and improve method statement/work procedures for all MEPFS system as GERI’s guidelines for implementing the testing and commissioning guidelines.
 Prepare general condition survey prior start of the testing and commissioning activity.
 Prepare punch list reports and determine corrective measures for on-site problems.
 Interacts with contractors and stakeholders, interprets design and specifications.
 Assist and mentoring of fellow quality control engineers at site with regards to practiced standards, non-compliance reports (NCR), request for information (RFI), request for site inspection (RFSI), Project Turnover (PTO), etc.
 Performs routine calculation.
 Performs various administrative duties and other duties as assigned.

Electrical Engineer à Faisal Electro Mechanical Company Limited
  • Arabie Saoudite - Khobar
  • avril 2015 à juin 2020

I joined this company and was assigned at different projects at different locations. Focal point of being site & quality control engineer at the same time required documentation, inspection and caring the welfare of workers for the success of the project.
Duties and responsibilities:
 Generally responsible for implementations and monitoring of all electrical related works at site.
 Estimates, prepares, and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.
 Plans and analyses all possible construction methodologies and recommends the best options to the Asst. Project Manager for approval prior to execution at site.
 Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.
 Manages directly and provide engineering and technical supports to all the electrical work groups at site.
 Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups.
 Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.
 Assign targets for accomplishments and ensure targets are met on daily basis for all electrical groups at site.
 Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
 Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national, or international standards.

MEP Engineer à COMO Facilities Management LLC
  • Qatar - Doha
  • mai 2012 à décembre 2013

I joined this company and was assigned to different Qatari locations preferably banks, residential and commercial establishments. I handled mainly LV & HV electrical maintenance systems and assigned as Testing & Commissioning Engineer in residential and commercial projects. Responsible in handling electrical problems or electrical engineering issues at a building, work site or other location.
Generally responsible for implementation and monitoring of all electrical-related works at the site.
 Estimates, prepares, and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.
 Plans the execution of all electrical-related works and coordinates the works to mechanical and civil groups.
 Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
 Manages directly and provides engineering and technical support to all the electrical work groups at site.
 Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national, or international standards.
 Ensures that all site works are done according to all applicable quality standards.
 Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.
 Performs other related duties as may be required by the Project Engineer and Facilities Supervisor.

MEP Engineer à EMCOR Facilities Services
  • Qatar - Doha
  • mars 2008 à septembre 2009

I joined this company in managing and maintaining the facilities such as HVAC, chiller, LV & HV systems, plumbing, civil works of Al Sadd Sports Club. Coordinates also with the clients, contractors, and suppliers regarding issues on site.
 Defined a projects scope based on clients requirements, reviewing architectural, engineering, and furniture installation plans.
 Maintained strict safety standards and procedures.
 Consulted with clients & superiors on progress and issues.
 Documented & maintained production of as-built prints.
 Managed all activities of construction projects with carpenters, electricians, plumbers, HVAC technicians and concrete finishers.
 Scheduled and supervised crews, while maintaining safe working conditions.
 Perform any other related duties as assigned by immediate superior.

Plant Operations Engineer à AP Genco North Services Incorporated
  • Philippines - Manille
  • janvier 2008 à mars 2008

Joined the company in creation, implementation, and managing production programs. Coordinated machinery maintenance schedules and building facilities team. Coordinated administrative and operational activities. Completed research, documentation and record keeping for production problems. Promoted safety awareness and a professional working environment. Communicated with staff in all departments and at all levels. Analyzed and improved departmental operations. Maintained neat and orderly stockroom. Supervised dispatching for city and line haul truck drivers. Managed complex and demanding tasks.
 Ensured compliance of process controls at machining and assembly areas.
 Evaluated, established goals, and set performance standards.
 Ensured quality control standards were maintained.
 Exchanges information on process conditions at shift hand over.
 Communicates, coordinates, and assists team members in the production process.

Building Maintenance Engineer à First Electro Dynamics Corporation
  • Philippines - Batangas
  • mai 2007 à novembre 2007

Joined the company in planning and directed installation, maintenance, testing, and repair of HV & LV systems, HVAC facilities and production equipment. Planned, coordinated, and directed engineering project, organized, and assigned staff, and directed integration of technical activities with products.
 Prepared, reviewed, and maintained maintenance schedules and operational reports and charts.
 Determined material and equipment needs and ordered supplies.
 Conferred with engineers, customers, and others to discuss existing and potential engineering projects and products.
 Prepared engineering sketches and specifications for construction, relocation, and installation of transmitting and receiving equipment, facilities, products, and systems.
 Conducted studies to gather information regarding current services, equipment capacities, traffic data, and acquisition and installation costs.

Building Engineer à Ayala Property Management Corporation
  • Philippines - Calamba
  • novembre 2006 à mars 2007

Joined the company as Building Engineer & Technical Assistant for examining HV & LV electrical system, and HVAC facilities, such as telephone, air-conditioning, and industrial plant, and analyzed information, to determine installation, service, and repair needed. Monitored operations, and inspected, tested, and measured completed work, using devices, such as hand tools, gauges, and specifications to verify conformance to standards. Requisitioned materials and supplies, such as tools, equipment, and replacement parts for work activities. Interpreted specifications, blueprints, and job ordered, and constructed templates and laid out reference points for workers.
 Prepared and studied technical drawings, specifications of electrical systems, and topographical maps to ensure installation and operations conform to standards and customer requirements.
 Created procedures for handling special customer orders.
 Negotiated and renegotiates, and administered contracts with suppliers, vendors, and other representatives.
 Coordinate maintenance efforts with outside contractors and technicians as directed by facilities administrator.
 Troubleshoot, evaluate, and recommend upgrade maintenance operations and/or implement savings opportunities.

Facilities Technician à Edward Keller Philippines, Inc.
  • Philippines - Calamba
  • avril 2006 à septembre 2006

Joined the company as facilities technician for LV & HV electrical systems, HVAC, chillers, boilers, and sewerage water treatment systems. Acting independently to determine methods and procedure on standard assignments and troubleshooting. Perform machine and equipment condition, monitoring, lubrication, and preventive maintenance. Execute maintenance, repair work order and maintenance system and procedure and instruction.
 Lubricated, maintained, and repaired equipment, using hand tools and power tools.
 Cleaned equipment, using air hose, brushed, and rags, and drains water from pipes and air reservoir.
 Recorded temperature, pressure, water levels, fuel consumption, and other data at specified intervals in logbook.
 Added chemicals and tended equipment to maintain temperature of fluids and atmosphere and to prevent scale buildup.
 Read dials of temperature, pressure, and ampere gauges and meters to detect malfunctions and ensure specified operation of equipment.
 Inspected equipment to determine need for repair, lubrication, and adjustment.
 Collected and tested water and sewage samples, using test equipment and color analysis standards.
 Operated and adjusted controls on equipment to purify and clarify water, process, and dispose of sewage, and generate power.
 Cleaned and maintained tanks and filter beds, using hand tools and power tools.
 Directed and coordinated plant workers engaged in routine operations and maintenance activities.
 Added chemicals, such as ammonia, chlorine, and lime, to disinfect and deodorize water and other liquids.

Maintenance Technician à Winsome Development Corporation
  • Philippines - Calamba
  • juin 2005 à novembre 2005

Joined the company as maintenance technician for LV & HV electrical systems, HVAC, chillers, and sewerage treatment facility. Implement day to day operational procedure and program of building equipment and facilities. Attends to equipment breakdown and work on its restoration and normal operations. Conducts preventive maintenance program (PMP). Assists in the implementation of building repair and renovation.
 Interpreted specifications, blueprints, and job ordered, and constructed templates and laid out reference points for workers.
 Established and adjusted work methods and procedures to meet production schedules, using knowledge of capacities of machines, equipment, and personnel.
 Requisitioned materials and supplies, such as tools, equipment, and replacement parts for work activities.
 Trained workers in methods, procedures, and use of equipment and work aids, such as blueprints, hand tools, and test equipment.
 Recommended measures, such as procedural changes, service manuals revisions, and equipment purchases, to improve work performance and minimize operating costs.
 Patrolled work area and examined tools and equipment to detect unsafe conditions and violations of safety rules.
 Computed estimates and actual costs of factors, such as materials, labor, and outside contractors, and prepared budgets.
 Monitored operations, and inspected, tested, and measured completed work, using devices, such as hand tools, gauges, and specifications to verify conformance to standards.
 Conferred with personnel, such as management, engineering, quality control, customers, and workers representatives to coordinate work activities and resolve problems.
 Examined system and facilities, such as telephone, air-conditioning, and industrial plant, and analyzed information, to determine installation, service, and repair needed.

Éducation

Baccalauréat, Electrical Engineering
  • à Mapua Institute Of Technology
  • novembre 2001

Completed the 5 year electrical engineering curriculum

Specialties & Skills

Power Systems
Electrical Maintenance
Quality Control
Testing and Commissioning
Site Inspection
Design review
Microsoft Office Suite
AutoCAD
Project documentation
Bluebeam Revu

Langues

Anglais
Moyen
Arabe
Débutant

Adhésions

Institute of Integrated Electrical Engineers of the Philippines, Inc.
  • Lifetime member
  • May 2003
Saudi Council of Engineers
  • Engineer
  • August 2022

Formation et Diplômes

Fire Alarm System Design, Introduction to Power System Study and Analysis (Certificat)
Date de la formation:
November 2018

Loisirs

  • Playing basketball