Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Midhun Poyil, Instrumentation Scheduler

Midhun Poyil

Instrumentation Scheduler·ABJ Engineering and Construction Co.,

Kuwait

Bachelor's degree, Applied Electronics and Instrumentation Engineering

Work experience

Total years of experience: 10 years, 8 months

Instrumentation Scheduler

January 2024 - Present

ABJ Engineering and Construction Co.,

Al Ahmadi, Kuwait

January 2024 - Present

• Initiate, prepare & develop project plans & schedules according to standards, contract specifications and
accepted Project Management practices.
• Ensure that the schedule is based on the project execution strategy and schedule milestones are achievable.
• Generate detailed work plan, critical activities/path, planned/progress S-Curves, Budget
Histogram/planned distribution tables, Resource Histogram/planned distribution tables etc.
• Monitoring, updating & analysis of progress right from the field.
• Prepare reports & charts, i.e., daily/weekly and/or monthly reports as required by management and/or
client.
• Knowledge resource loading/planning management techniques using Primavera P6.
• Prepare MBO (Monthly Business Outlook) and present progress reports in every month-end.
• Analyse drawings, specifications & method statements of works for the preparation of activity
networks/scheduling/resources planning, and allocation.
• Carries out day-to-day preventive and corrective maintenance activities on Instrumentation systems as per
KOC Standards.
• Submission of KPI reports, and related documents.
• Preparation of PowerPoint presentations for progress meetings.
• Creation of DTRs (Desk Through Reports), ICMRs (Inventory Control Material Requestion), DMRR
(Delete Material Requestion) and evaluation of RFQs on the basis of spare procurement using eBEAMS
/Maximo (eBusiness & Enterprise Asset Management System).
• Arising spare parts requests and procuring from the warehouse, and liaising with the purchasing team.
• Spare balance investigation, inventory control for all instrument spares, and evaluation of RFQs (Request
for Quotation) and create the report.
• Liaising with the field instrument defects and executing work on site/or in the workshop.
• Worked on eBEAMS /Maximo (eBusiness & Enterprise Asset Management System), such as receiving
work orders, reviewing, Plan & Process the Work orders as per priority. Creating service requests for
various KOC Teams.
• Working under KOC with high standard of safety and follows all company HSE Policies and procedures
such as conducting tool box talks/ pre job safety meeting and follow up with the safe working practices.
• Familiar with the Company permit to work system and all the safety and fire rules regulations, including
the use of protective clothing and equipment.

Company industry:
Oil & Gas

Electronics and Instrumentation Maintenance Scheduler

January 2019 - December 2023

Heavy Engineering Industries & Shipbuilding Company (HEISCO),

Al Ahmadi, Kuwait

January 2019 - December 2023

• Carries out day to day preventive, corrective maintenance activities on Instrumentation systems as per
KOC Standards.
• Ensure that schedule is based on project execution strategy and schedule milestones are achievable.
• Generate detailed work plan, critical activities/path, planned/progress S-Curves, Budget
Histogram/planned distribution tables, Resource Histogram/planned distribution tables etc.
• Monitoring, updating & analysis of progress right from the field.
• Prepare reports & charts, i.e., daily/weekly and/or monthly reports as required by management and/or
client.
• Knowledge resource loading/planning management techniques using Primavera P6.
• Prepare MBO (Monthly Business Outlook) and present progress reports in every month-end.
• Analyse drawings, specifications & method statements of works for the preparation of activity
networks/scheduling/resources planning, and allocation.
• Preparing calibration reports, KPI reports, and documentation submission.
• Analyse drawings, specifications & method statements of works for the preparation of activity
networks/scheduling/resources planning, and allocation.
• Worked on eBEAMS /Maximo (eBusiness & Enterprise Asset Management System), such as receiving
work orders, reviewing, Plan & Process the Work orders as per priority. Creating service requests for
various KOC Teams.
• Familiar with the Company permit to work system and all the safety and fire rules and regulations,
including the use of protective clothing and equipment.

Company industry:
Oil & Gas

Instrumentation Maintenance Scheduler

January 2017 - December 2018

Heavy Engineering Industries & Shipbuilding Company (HEISCO),

Al Ahmadi, Kuwait

January 2017 - December 2018

• Managing and performing details planning using Primavera P6.
• Consolidate the overall planning datas, perform analysis, forecast, duration of completion and cost at
completion.
• Knowledge in budgeting and cost forecasting.
• Involved in developing/ maintaining and managing the shutdown schedules from award to handover.
• Preparation of work Breakdown structure (WBS) for the shutdown.
• Plan the manpower resource skills needed for the shutdown at various stages and truck their mobilization.
• Monitor the progress of resource mobilization (manpower, equipment and vendors and subcontractors),
highlighted in case delay.
• Preparation of manpower, Histogram, progress reports and S Curve and updating as applicable.
• Preparation of PowerPoint presentations for progress meetings.
• Track and records the sequence of delay events and guide execution team on priorities and rectification
actions as applicable.
• Worked on eBEAMS /Maximo (eBusiness & Enterprise Asset Management System) such as Receiving
work orders from supervisor and Review, Plan & Process the Work orders as per priority.

Company industry:
Oil & Gas

Instrumentation Engineer

January 2015 - January 2015

Dhavir Instruments

Mumbai, India

January 2015 - January 2015

• Generate the work schedule of the calibrating instrument.
• Find the instruments using Piping and Instrumentation Diagram (P&ID).
• Prepare daily activity report and submitted the authorized person.
• Maintain project schedule by monitoring actual progress; coordinate and plan day to day activities
with/between supervisors and contractors; resolve problems.
• Disconnecting the control wiring and detached instruments from field.
• Collect all instruments and listed out from the workshop.
• Supervising on instrument calibration and report making (Pressure Transmitters, Temperature
Transmitters, Pressure Gauges, Level Switches, Differential Pressure Transmitter, Thermocouples,
RTD, I/P Converters and Regulators).
• Installed and terminate the wiring connection of the instrument after calibration.

Company industry:
Oil & Gas

Instrumentation Supervisor.

January 2013 - January 2014

Ratna Enterprises Electrical and

Mangalore, India

January 2013 - January 2014

• Supervising on instrument installation, tray fitting, testing of main cable/branch cable, cable pulling,
cable glanding, tube fitting, instrument cable termination, junction box installation, DCS, PLC install
ation loop checking and commissioning.
• Assist control panel erection.
• Ensure that schedule is based on project execution strategy and schedule milestones are
• achievable.
• Implement the work schedule and monitor progress of the works for timely execution.
• Prepared (daily/weekly/monthly) reports with respect to review of the overall project.
• Develop S Curve and Manpower histogram and check if these are achievable.
• Maintain project schedule by monitoring actual progress; coordinate and plan day to day activities
with/between supervisors and contractors; resolve problems.
• Attending progress meeting with client and consultants.
• Generate progress reports, tracks project progress and maintain detailed records of all data, drawings,
and documents related to the projects.
• Preparation of submittal and procurement logs.
• Installation and configuration of Ultrasonic flow meter, Turbine flow meter and Magnetic flow meter.
• Inspection and installation of instrument using Hook-up Drawing.
• Finding and inspected the instrument using Piping & Instrumentation Diagram (P&ID).
• FAT and SAT testing of control panel.
• Installation, validation and execution of Custody Transfer Flow Metering and Gas Chromatogram
analyser.

Company industry:
Oil & Gas

Education

University of Calicut

January 2013

January 2013

Bachelor's degree, Applied Electronics and Instrumentation Engineering

India

G.G.H.S.S KALLAI

June 2009

June 2009

High school or equivalent, Higher Secondary School

India

S.R.K.M.H.S.S

March 2007

March 2007

High school or equivalent, Secondary School

India

Skills

CASH FLOWS

Intermediate

CONSTRUCTION

Intermediate

INSTRUMENTATION

Intermediate

OIL AND GAS

Intermediate

OPERATIONS

Intermediate

PLANNING

Intermediate

PREVENTIVE MAINTENANCE

Intermediate

PRIMAVERA SOFTWARE

Intermediate

PROJECT MANAGEMENT

Intermediate

SCHEDULING

Intermediate

Languages

English

Intermediate

Hindi

Beginner

Malayalam

Beginner

Training and Certifications

Certifications
VFD: Schneider Electric-Altivar, Allen-bradley-Powerflex.
DCS: Introduction to DCS Hardware and application.
SCADA: Wonderware In touch, i FIX.
&
PLCs: Allen Bradley
Automation Engineer course
Primavera P6.