Milind Thosar, Proprietor

Milind Thosar

Proprietor

Ramdas engg and consultants

Location
India
Education
Diploma, Piping
Experience
31 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :31 years, 0 Months

Proprietor at Ramdas engg and consultants
  • India - Nagpur
  • My current job since March 2013

Ramdas Engg and consultants providing technical support to steel plants in India and foreign. Plant modification, projects, erection in steel melting shop EAF, IF, LRF, CCM, DRI, BF etc.

Acting--Section Head-----Mechanical Maintenance at Global Pipe Company
  • Saudi Arabia - Jubail
  • April 2012 to November 2012

Erection, Commissioning of L--SAW steel pipe plant; OD= 16 TO 64”, l = 12 meter, Thick= 64 mm, Max Test P= 300 Bar. Presently guiding Senior Engineers, Engineers, Foreman, Fitters for Bending Press—JCU—52, 000 kN—make=Grabener, Post Bending, Tack welding, End facing M/c--Graebener, Expander, Hydrotester—Beck Chun etc. Working with German Engineers + TEMCON--Contractor for implementation of project in 5 months time frame. Looking after erection, Oil hydraulics, Detailed engineering—Plant layout, Utility—piping-air, gas, water, Vehicle maintenence etc. Forklift—make=Kalmar—45 Tonne, Doosan, Generator—Caterpillar—kw=456; Doosan—Kw=200 etc, EOT Cranes-Morris make—max capacity= 50 Tonne, ASNT—Level-II-Vibration Analysis—Will give exam for Level—III. Predictive Maintenance—Noise level, Thermography, Vibration Analysis etc.

Senior Manager--Mechanical Maintenance--EAF,CCM at Global Steel Holdings limited
  • Libya - Misrata
  • September 2004 to March 2010

Managed --4 Engineers & 25 workers- ELECTRIC ARC Furnace- 90 tonne -Liquid metal capacity, Make= VAI-POMINI EUROPEAN UNION, No. of Furnaces = 3, 54 MVA Transformer, Eccentric Bottom ( EBT ) tapping, Raw Material= DRI / Lime / Solid Scrap / Light Scrap, Flat belt / DRI conveyor, Tap to tap Time = 120 Min. APPROX, 3 electrode design, Electrode regulation—Mech—AEG, Electrical—EMG, Graphite electrode Dia 600 mm X 2700 mm long, electrode Normally closed with Helical Spring & open with Hyd.. Cyl., ladle transfer car, Bottom & top Shell, Roof Ring, Fettling And Gunning / Repair Operations, Tripper car / DRI Flat Belt conveyor, Lime Belt conveyor, Bins for DRI- N2 Purged, HBI -N2 Purged, Lime, Hyd. SYS-fire RESISTANT -HFC-620 oil - water Glycol Hydrogenated oil, electrode lifting- 2 Cyl. design- Regulation & Counterbalance Cyl., Tank capacity- 7000 Lit, Ladle Furnace---25 MVA, Bottom Argon / Nitrogen purging, Al / Si wire feeding arrg’t , Ferro Alloy additions system, Lime addition, 3 electrode design
Major Improvments :--( 1 )Increased the production from average monthly from 20, 000 to 65, 000 MT / Monthly ( maximum was 82, 000 MT / Month ). Leakages of HCC, Hoses-water / Oil eliminated by providing heat shield + new way of pourback + new material ( 2 ) Bottom shell life increased from average 200 heats to average 300 heats ( maximum 380 heats) by decreasing breakdown of carbon injection machine.( 3 ) Roof change, Bottom shell change, Water panel change done in less time. ( 4 ) Was interested to introduce bottom purging at bottom shell of EAF.

Engineer Mechanical at Abu Dhabi Metal Pipes and Profiles Industries Complex
  • United Arab Emirates - Abu Dhabi
  • December 2003 to March 2005

Erection, Commissioning & MAINTENANCE of ERW Steel Pipe Mill ( 1/2" - 6" )- Oto Mill, ITALY--Decoiler, Bulkhead, Coil opener, Floop / STRIP Accumulator, Pinch roll, Straightener, Pre-forming Mill, forming Mill, HF Welder, OD Debeading tool, Sizing Mill, Cut-off, Facer, Hydrotester. hands on Experience in using Dumpy level, Theodolite etc

MANAGER--MECHANICAL MAINTENANCE at WELSPUN GUJARAT STAHL ROHREN LIMITED
  • India
  • May 2004 to September 2004

MANAGER MECHANICAL MAINTENANCE ( 18-May-2004 to 15-Sept-2004 )
Work :- Managed--4 Engineers & 15 workers, Erection & Commissioning of ERW Steel Pipe Mill 6 to 16” OD Mill- LINEAR Speed - 30 Meter / Min., AMERICAN Plant Make--Mannesman Demag, Germany -& 1-6” OD GALLIUM, JAPAN Make, Speed -140 Meter / Min.- Erection & Commissioning of Mill - Preparation of foundation Drgs.- Uncoiler, Flattener / Straightener, end EDGE SHEAR, BUTT Welder, LOOP / Coil Accumulator, PRE-forming Mill, forming Mill, HF Welder, Turks Head, Sizing Mill, Cutting car, end Facing, Hydrotester, Coating / Varnish M/C.
Salary :- -- Basic- Rs.-13, 600 + Free Family accomodation of three Room + Kitchen or Rs. -4500 HRA + P.F., Medical, LTA, Bonus, Attire, Conveyance GROSS Rs.- Approx. 27, 000 per Month

ENGINEERING--MECHANICAL at MAHARASHTRA SEAMLESS LIMITED--JINDAL
  • India
  • March 1992 to December 2003

Managed---3 Engineers & 15 workers ( 1 ) Erection, Commissioning & MAINTENANCE of MAIN Mill & FINISHING Mill of ERW Pipe Plant :- SIZE RANGE- 8” - 20” OD, capacity - 1, 20, 000 M.T. per Annum . MANNESMAN DEMAG, GERMANY Plant. Uncoiler, STRAIGHTENING M/C, Pinch roll, BUTT Welder, LOOP -100 Meter long, Pinch roll, STRIP UT, Pre-Forming Mill -2 roll, forMin.G -Mill-2 roll, HF Welder-5 roll, ANNEALER, TURKS HEAD, Sizing Mill - 4 roll, Facer, Hydrotester - Max. P= 400 bar, Thickness = 4- 15 mm, length = 6-20 Meter, NDT M/C, Coating M/C.
( 2 ) MAINTENANCE / DEVELOPMENTAL Work :- Successfully Converted Plant Capability from 5 1/2 to 7 INCH OUTSIDE DIAMETER of SEAMLESS Steel Pipe HOT ROLLING Mill of MANNESMAN DEMAG, GERMANY, Make Plant-Cross PIERCING & Elongation Plant, from Mechanical MAINTENANCE side. Mannesman Demag, Germany quoted for Indian Rs. 54 Crores ( USD -12 Million ) & we have done at Indian Rs. 1 Crore ( USD 0.3 ) with 1 ½ year time period . Increase in production from 600 MT/ Day to 800 MT/Day.

( 3 ) TROUBLE SHOOTING & HOT ROLLING Mill :- i.e. PIERCER, PUSH BENCH, LOOSENING Mill, SRM Furnace, DESCALER water system - 70 bar, STRETCH REDUCING Mill, MANDREL bar Extractor, Hydraulic system design of walking BEAM Furnace,

( 4 ) EXECUTIVE ASSISTANT / INDUSTRIAL ENGG. :- Monthly report / BREAKDOWN Analysis of Hot Mil Cycle Time reduction / productivity Improvement, low cost Automation. Increase in production due to better planning was from 600 pipes / day to 840 pipes per day ( 40 % ) with same manpower, machinery.
( 5 ) SPARES :- preparing programme- Popup, Array, User Friendly in FOXPRO for CODIFICATIONOF of more than 30, 000 SPARE parts for ISO-9000 system on 10 DIGIT NUMERIC Code .

Graduate Engineer Apprentice at Kareyn Precision Machines Pvt LTD
  • India
  • March 1991 to February 1992

design of Shaft of Gearbox of LATHE, TESTING & designing of Helical Compression Springs, production, Marking of Castings, Lathe, Milling, Drilling, Grinding M/CS

Education

Diploma, Piping
  • at IPEBS Hyderabad Telangana India
  • November 2015
Master's degree, Operations Management
  • at IGNOU
  • December 2012

Operations / Production Management---Production Planning, Technology Management, Technology forecasting, Project Management, Operation Research etc.

Bachelor's degree, MECHANICAL ENGINEERING
  • at Government College of Engineering, Amravati, MS
  • November 1990

Elective subjects--Production--Tool Engineering, Tool design, Production Planning & control

Specialties & Skills

Hydraulics
Plant Operations
Management
Project Management

Languages

English
Expert
Arabic
Beginner
Hindi
Expert

Training and Certifications

Diploma in Piping Process Design as per ASME B31.3 (Training)
Training Institute:
IPEBS Hyderabad Telangana India
Date Attended:
November 2015
Duration:
220 hours
Programmable logic control (Certificate)
Date Attended:
December 2011
Valid Until:
December 2011
Yes. (Certificate)
Date Attended:
November 2011
Valid Until:
November 2011
ASNT Level--II---Vibraion Analysis (Certificate)
Date Attended:
February 2012
Valid Until:
March 2012

Hobbies

  • Yogasan, Swimming, volleyball