مينا حربى, Eleectrical Project Engineer

مينا حربى

Eleectrical Project Engineer

Al SHAFAR General Contracting

البلد
الإمارات العربية المتحدة
التعليم
بكالوريوس, ELectrical Engineering
الخبرات
13 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 5 أشهر

Eleectrical Project Engineer في Al SHAFAR General Contracting
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ يناير 2013

***Project Description : City Walk Residential Building, Jumeriah, Dubai from (Jan 2014 till Oct 2016 ).
• Roles and Responsibilities:
• Electrical Designing for Light & Power Systems
• Cable Sizing for Light, Power & Motor Systems
• Electrical Design including wiring diagrams, selection of Electrical Equipment's such as Circuit Breakers, Cable Sizing, Distribution Boards.
• Responsible for Preparation of Bill of Quantity of Materials for Supply, Erection, Testing & commissioning for Projects
• Maintaining records and archives to company standards
• Site surveys and inspections
• Responsible to ensure the correct implementation of the project quality plan and quality procedures and productivity related to all electrical works in accordance with program of work on site
• Ensure that all electrical site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan
• Monitoring the daily, weekly & monthly progress
• To execute the works according to the latest approved revision of drawings and/or instructions of authorized authorities. • Conforms to all the operations are done in strict compliance with department safety rules and regulations, giving priority to safety and security.


***Project Description : Dubai Airport Concourse C, B & Terminal 1 from (Oct 2016 till now ).
• Roles and Responsibilities:
•Electrical Designing for Light & Power Systems
• Check and review all systems ( SAS, Public Adress, Master Clock System, Sacs Doors )
• Electrical Design including wiring diagrams, selection of Electrical Equipment's such as Circuit Breakers, Cable Sizing, Distribution Boards, etc.
• Responsible for Preparation of Bill of Quantity of Materials for Supply, Erection, Testing & commissioning for Projects
• Maintaining records and archives to company standards
• Site surveys and inspections
• Responsible to ensure the correct implementation of the project quality plan and quality procedures and productivity related to all electrical works in accordance with program of work on site
• Ensure that all electrical site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan
• Monitoring the daily, weekly & monthly progress
• To execute the works according to the latest approved revision of drawings and/or instructions of authorized authorities. • Conforms to all the operations are done in strict compliance with department safety rules and regulations, giving priority to safety and security.

Technical Engineer في ThyssenKrupp Industrial Solutions GmbH
  • مصر - دمياط
  • يناير 2011 إلى أكتوبر 2013

***Project Description : Constructing a Mega Fertilizer Plant ( Amonia _Urea ) In Damietta - Egypt
• Project Contribution:
Responsible for all project-related matters, including resolution of project and technical issues.
- Accuracy and timely submission of all project-related documents.
- Quqntity Surveyor for Electrical Work.
- Electrical Design including wiring diagrams, selection of Electrical Equipment's such as Circuit Breakers, Cable Sizing, Distribution Boards.
- Managing installation, trouble shooting, preventive and corrective maintenance works.
- Budgeting and managing expenses to meet bottom line.
- Managing customer relations and business operation process.
- Developing standard Operating procedures and good practices.
- Liaising with Clients and the End user to proposed projects.
- Handling sub-con for Preventive Maintenance Works and Projects works.
- Prepare and submit detailed cost estimates using fixed schedule of rates.
- Coordinate and Liaise with contractors to proposed projects, Additional and Alteration Works.
- Submit Certificate of Completion (COC) and necessary document for the project.
- Liaising with auditors for verification in accordance to the project completed.
- Liaising with Safety Officer on site activities compliance to permit-to-work system, Risk Assessment and safe practices.
- Reporting to Facility Operation Manager.

الخلفية التعليمية

بكالوريوس, ELectrical Engineering
  • في High Institute of Energy Engineering
  • مايو 2005

Specialties & Skills

DRIVING
ENGINEERING
IMMIGRATION AND NATIONALITY DIRECTORATE
MINISTERIO DE DEFENSA
OFICINA NACIONAL DE ESTADÍSTICA

اللغات

العربية
متمرّس
الانجليزية
متمرّس