مينا جوزيف, elevator installation engineer

مينا جوزيف

elevator installation engineer

Alebda Alsarea Company. Saudi Arabia

البلد
المملكة العربية السعودية - القصيم
التعليم
بكالوريوس, ميكانيكا قوى
الخبرات
6 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :6 years, 11 أشهر

elevator installation engineer في Alebda Alsarea Company. Saudi Arabia
  • المملكة العربية السعودية - القصيم
  • أشغل هذه الوظيفة منذ ديسمبر 2022

Senior Projects Engineer
❖ Responsible for examining local projects (for example: installing the elevator in homes, hotels,
buildings, etc.), making engineering designs, calculating sizes and distances for the local elevator
design, follow-up on installations of elevators with the correct scientific methods, and handover
the projects to customers.
❖ Responsible for correspondence with foreign manufacturers and getting offers for their products
and supply chains.
❖Responsible for supplying and installing (44) elevators for 5-story buildings .
❖Plan and organize the delivery and storage of materials and tools to the site.
❖Responsible for site preparations and follow-up of site readiness.
❖Make a monthly and weekly plan to follow up on the installation work and follow it up to deliver
the project before the project delivery date with the highest efficiency with site safety.
❖Accountable for use of correct installation methods throughout the installation.
❖Managing the installation of the elevator by the mechanical standard dimensions.
❖Improve productivity and quality, reduce flow time, and enhance operational efficiency.
❖provide remote or on-site technical support for installation and maintenance issues.
❖Managing the performance of the team and individuals.
❖Preparing technical letters and reports, reviewing and approving financial extracts,
❖ Accountable for the delivery of the installation project.
➢ Maintenance Manager.
❖ Follow-up company maintenance such as maintenance of local elevators and international
brands (OTS, Fuji, Schindler, etc.).
❖ Make an annual elevator maintenance plan, follow -up on maintenance dates, and visit the
elevator to create comprehensive elevators.
❖ Speed to respond to solving mechanical and electrical faults for the elevators that have
been stopped.

Elevators Project Manager Engineer في Ministry of military production.Factory 999
  • مصر - المنصورة
  • يوليو 2021 إلى ديسمبر 2022

( Project Manager Engineer of installation Mechanical and Electrical Elevators )
❖Responsible for supplying and installing (70) elevators for 12-story buildings .
❖Plan and organize the delivery and storage of materials and tools to the site.
❖Responsible for site preparations and follow-up of site readiness.
❖Make a monthly and weekly plan to follow up the installation work and follow it up to deliver
the project before the project delivery date with the highest efficiency with site safety.
❖Attending meetings with the Department of Military Engineers to present and solve the
construction problems that hinder the installation of elevators in a correct and safe manner.
❖Accountable for use of correct installation methods throughout the installation.
❖Managing the installation of elevator by the mechanical standard dimensions.
❖Improve productivity and quality, reduce flowtime, and enhance operational efficiency.
❖provide remote or on-site technical support for installation and maintenance issues.
❖Managing the performance of the team and individuals.
❖Preparing technical letters and reports, reviewing and approving financial extracts,
❖Accountable for the delivery of the installation project.

Elevators Manager of mechanical installations section في Ministry of military production.Factory 999
  • مصر - القاهرة
  • مارس 2020 إلى يوليو 2021

❖Main responsible for elevators construction preparations and scaffolding installations of (1346)
FUJI elevators at R2 district at the new administrative Capital.
❖Main responsible for elevators installations of (1346) FUJI passenger elevators at R2 district at the
new administrative capital.
❖Managing the installation of elevator by the mechanical standard dimensions.
❖Improve productivity and quality, reduce flowtime, and enhance operational efficiency.
❖Make a monthly and weekly plan to follow up the installation work and follow up the plans'
progress daily.
❖Reaching the target of installation monthly.
❖Receiving technical reports from engineers, following up on them, solving problems, making
monthly reports, and handing them over to the project manager.
❖Managing the performance of the team and individuals.
❖Achieving the installation plan with site safety.

Elevator project engineer في Ministry of military production.Factory 999
  • مصر - القاهرة
  • يناير 2019 إلى مارس 2020

❖Main responsible for elevators construction preparations and scaffolding installations of FUJI
elevators at R1, R2, and R6 districts at the new administrative Capital.
❖The main responsible for core drilling machines and their maintenance and the work of the core
drill holes that cross the ropes through it in the machine room through engineering drawings.
❖Reviewing and approving the financial extracts.
❖Plan and organize the delivery and storage of materials and tools to the site and place the orders to
subcontractors and factory material suppliers.

Maintenance Engineer. في gypt Sponge Iron & Steel Company
  • مصر - المنوفية
  • مارس 2018 إلى يناير 2019

Working on the documents of the Maintenance department in accordance with the quality
management system, environment and safety (OHSAS 18001/2007 & ISO 9001/2015 &
14001/2015).
❖Do a KPI Maintenance department.
❖Make preventive maintenance plan for Production department.
❖Train Laborers on proper operation, maintenance and safety rules.
❖Coordinate development activities and upgrades related to updating and improving machine
functionality.

Process Engineer في (Sumitomo Electrical Wiring Systems - Europe Ltd. (Japanese Multinational Company
  • مصر - القاهرة
  • يوليو 2017 إلى مارس 2018

Implementation of new projects following the New❖ Product Introduction procedure (customer drawings
analysis, Bill of Materials analysis, order new materials based on New Product Authorization system,
design and order the tools for new projects).
❖ Plan and support each trial phase for a new project.
❖ Teamwork with production, quality and logistics department for implementation of new projects or
changes on current projects.
❖ Prepare new production lines & make work instructions to help the operators.

الخلفية التعليمية

بكالوريوس, ميكانيكا قوى
  • في faculty of engineering - Cairo university
  • يوليو 2017

العمل التطوعي في جمعيه رساله الاشتراك في مسابقه الغواصات الاشتراك في مسابقه الفورملا

Specialties & Skills

Maintenance
Management
Project Management
Engineering
Site Engineering
playing chess
solid work
M.S.Office
HAP & Elite
Autocad
Project Management
elevator installation
Installation
Microsoft Office
Engineering
Planning
Management

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

الانجليزية
متوسط
العربية
اللغة الأم
الالمانية
مبتدئ

العضويات

نقابة المهندسين
  • عضو لدى نقابة المهندسين
  • March 2018
نقابة المهندسين السعوديين
  • عضو
  • January 2022
PMI
  • PMP
  • April 2024

التدريب و الشهادات

PMP (الشهادة)
Sugar Company for Integrated Industries in Al-Hawamdiyah (تدريب)
معهد التدريب:
Sugar Company for Integrated Industries in Al-Hawamdiyah
Egypt Air [Ground Services] (تدريب)
معهد التدريب:
Egypt Air [Ground Services]
Egypt Air [Maintenance] (تدريب)
معهد التدريب:
Egypt Air [Maintenance]
Factory of Benha Electronics (تدريب)
معهد التدريب:
Factory of Benha Electronics
Factory Of Arab Contractors [Osman Ahmed Osman & Co]. (تدريب)
معهد التدريب:
Factory Of Arab Contractors [Osman Ahmed Osman & Co].
The Petroleum Projects &Technical Consultations Company (PETROJET) (تدريب)
معهد التدريب:
The Petroleum Projects &Technical Consultations Company (PETROJET)
Egyptian Airports Company (تدريب)
معهد التدريب:
Egyptian Airports Company

الهوايات

  • Watching English
  • Helping my friends to solve their problems
  • Playing Chess
    Get second rank in the university competition and get the second rank in the competition of the university city
  • Playing Football