Act as the main technical adviser on a construction site for subcontractors, Draftsman and technicians.
Check plans, drawings and quantities for accuracy of calculations
Ensure that all materials used and work performed are in accordance with the specifications
Oversee the selection and requisition of materials
Manage, monitor and interpret the contract design documents supplied by the client or architect
Day to day management of the site, including supervising and monitoring the site Labor force and the work of any subcontractors
Plan the work and efficiently organize the plant and site facilities in order to meet agreed deadlines
Oversee quality control, health and safety issues on site
Prepare reports as required
Resolve any unexpected technical difficulties and other problems that may arise.
Worked for infrastructure works like preparing manholes and hand holes for the cable and wire pulling, preparing trenches for the electric room and switch gear rooms according to panels layout.
Worked for the Earthing, grounding system and lightning protection system which includes pulling of earth cables, putting earth rods, installing earth pits, installing lightning tape and lightning rods.
Worked for estimation of project materials, labor force, project work etc.
Worked for the low current system like for the access control system (ACS), BMS system, coordinating with the subcontractor for the quality of work with the following of NFPA codes and giving instructions according to the approved drawings from the consultant.
Worked also for the fire detection system (FAS) which is also a part of low current system like installing first fix, second fix, and installation of aspirating system with testing of the devices after complete devices installation.
Following the consultant for the submitted materials and drawings, Single line diagrams for the approvals and preparing inspection for the work done on site according to the approved shop drawings and installation drawings.
Carrying out testing for the wires and cables installed with megger device MIT430/2, Continuity test and testing of the medium voltage switch gear (premset-630A, 25KA/3sec, 13.5 kv/400-230v )with the subcontractor for the proper functioning of the project
Carrying out work for the low current system like pulling of data cables, fiber optic cables, power supply of data cabinet system and testing the devices installed for the data, telephone, CCTV, other security system.
Worked for the installation of bus duct system with approved drawings of bus bars 4000 Amp, 2500 Amp, and 1600 Amp etc., both indoor and outdoor installation.
Carrying out testing for the Earthing, grounding system and lightning protection system with fluke 1623 Earth/ground tester geo device in order to check the proper installation of the system.
Worked with the installation and Testing of Distribution Transformers (oil type 4000 kva, 2500 kva), Transformers compact substation type (1500kva, 1000kva), Generator (1500 kva), ATS (2500 kva) etc.
Worked for the various distribution switch boards and distribution panel boards (35 kva, 45kva... etc.) sub main distribution panel (165 kva, 285kva... etc.) and main distribution panel boards (840 kva, 525 kva.. etc.)
Check plans, drawings and quantities for accuracy of calculations
Ensure that all materials used and work performed are in accordance with the specifications
Oversee the selection and requisition of materials
Manage, monitor and interpret the contract design documents supplied by the client or architect
Day to day management of the site, including supervising and monitoring the site Labor force and the work of any subcontractors
Plan the work and efficiently organize the plant and site facilities in order to meet agreed deadlines
Oversee quality control, health and safety issues on site
Prepare reports as required
Resolve any unexpected technical difficulties and other problems that may arise.
Worked for infrastructure works like preparing manholes and hand holes for the cable and wire pulling, preparing trenches for the electric room and switch gear rooms according to panels layout.
Worked for the Earthing, grounding system and lightning protection system which includes pulling of earth cables, putting earth rods, installing earth pits, installing lightning tape and lightning rods.
Worked for estimation of project materials, labor force, project work etc.
Worked for the low current system like for the access control system (ACS), BMS system, coordinating with the subcontractor for the quality of work with the following of NFPA codes and giving instructions according to the approved drawings from the consultant.
Worked also for the fire detection system (FAS) which is also a part of low current system like installing first fix, second fix, and installation of aspirating system with testing of the devices after complete devices installation.
Following the consultant for the submitted materials and drawings, Single line diagrams for the approvals and preparing inspection for the work done on site according to the approved shop drawings and installation drawings.
Carrying out testing for the wires and cables installed with megger device MIT430/2, Continuity test and testing of the medium voltage switch gear (premset-630A, 25KA/3sec, 13.5 kv/400-230v )with the subcontractor for the proper functioning of the project
Carrying out work for the low current system like pulling of data cables, fiber optic cables, power supply of data cabinet system and testing the devices installed for the data, telephone, CCTV, other security system.
Worked for the installation of bus duct system with approved drawings of bus bars 4000 Amp, 2500 Amp, and 1600 Amp etc., both indoor and outdoor installation.
Carrying out testing for the Earthing, grounding system and lightning protection system with fluke 1623 Earth/ground tester geo device in order to check the proper installation of the system.
Worked with the installation and Testing of Distribution Transformers (oil type 4000 kva, 2500 kva), Transformers compact substation type (1500kva, 1000kva), Generator (1500 kva), ATS (2500 kva) etc.
Worked for the various distribution switch boards and distribution panel boards (35 kva, 45kva... etc.) sub main distribution panel (165 kva, 285kva... etc.) and main distribution panel boards (840 kva, 525 kva.. etc.)
September 2015
To September 2017
electrical site engineer
at Al-Rashed Comatec Saudi Arabia
Location :
Saudi Arabia - Dammam
Experience in installing power distribution systems at residential, commercial and industrial buildings.
Skilled in testing, repairing, and maintaining electrical systems.
Strong supervisory, time management and coordination skills.
Wiring system design following EMT piping work, supervision of panel board termination and total wiring work
Engaged in Supervising in Electrical Wiring Installation, repair and maintenance of power systems of residential, commercial and industrial buildings.
Preparation of Bill of Materials and Cost Estimates of Electrical Wiring Installations, Repair and Maintenance Projects.
Domestic industrial load calculation and Cable size calculation.
Preparation of material submitting and documental submittal for the consultant’s approval.
Testing and commissioning of Medium voltage switchgear (630A, 25KA/3sec, 17.5 kv/400-230v) with client (SEC).
Made different tests like Functional test, CB test, Insulation resistance test for both low and medium voltage switch gear system.
Scheme check, testing of protection devices and insulation systems.
Conducting test for the electrical cables, electrical motors and laying of electrical cables of both low voltage and medium voltage.
Develop new or improved application techniques required to complete a project and, if necessary, may modify or suggest modifications to existing systems or equipment.
Preparing R.F.I and carrying out inspection for all the electrical works executed, material approval with consultant.
Assume the lead engineer’s role on assigned projects.
Supervise and organize the electricians.
Material requisition for erection work/breakdown occurred by workers or material in case of non-available and make sure that the job is completed with specification time.
Maintaining documents, records of work carried out.
Review of the updating submittals, drawings and executing on site.
Carried out insulation resistance test (IR) (megger test), hi potential test medium voltage cables.
Ensure that changes are recorded on drawings with actual dimensions as required, before cover-up preparation of As Built drawings.
Ensure work is executed in accordance with the contract specifications, design approved drawings, agreed procedures and method statements.
Supervise and provide necessary guidance to workers at site.
Ensure there is no wastage material and manpower
Ability to Negotiate.
Skilled in testing, repairing, and maintaining electrical systems.
Strong supervisory, time management and coordination skills.
Wiring system design following EMT piping work, supervision of panel board termination and total wiring work
Engaged in Supervising in Electrical Wiring Installation, repair and maintenance of power systems of residential, commercial and industrial buildings.
Preparation of Bill of Materials and Cost Estimates of Electrical Wiring Installations, Repair and Maintenance Projects.
Domestic industrial load calculation and Cable size calculation.
Preparation of material submitting and documental submittal for the consultant’s approval.
Testing and commissioning of Medium voltage switchgear (630A, 25KA/3sec, 17.5 kv/400-230v) with client (SEC).
Made different tests like Functional test, CB test, Insulation resistance test for both low and medium voltage switch gear system.
Scheme check, testing of protection devices and insulation systems.
Conducting test for the electrical cables, electrical motors and laying of electrical cables of both low voltage and medium voltage.
Develop new or improved application techniques required to complete a project and, if necessary, may modify or suggest modifications to existing systems or equipment.
Preparing R.F.I and carrying out inspection for all the electrical works executed, material approval with consultant.
Assume the lead engineer’s role on assigned projects.
Supervise and organize the electricians.
Material requisition for erection work/breakdown occurred by workers or material in case of non-available and make sure that the job is completed with specification time.
Maintaining documents, records of work carried out.
Review of the updating submittals, drawings and executing on site.
Carried out insulation resistance test (IR) (megger test), hi potential test medium voltage cables.
Ensure that changes are recorded on drawings with actual dimensions as required, before cover-up preparation of As Built drawings.
Ensure work is executed in accordance with the contract specifications, design approved drawings, agreed procedures and method statements.
Supervise and provide necessary guidance to workers at site.
Ensure there is no wastage material and manpower
Ability to Negotiate.
February 2014
To May 2015
Executive material Engineer
at pilog pvt limited
Location :
India - Hyderabad
Master Data Quality Solutions for the creation and management of Supplier catalog procurement.
Master Data Quality Solutions for the acquisition of material catalogues (SPIR or SPIL), maintenance plant configuration, Bills of Materials and maintenance Works order information during new plant construction or plant expansion projects.
Selecting the best combination of materials for specific purposes.
Analyzing data using computer modeling software.
Supervising the work of materials engineering technicians and other staff.
Master Data Quality Solutions for the acquisition of material catalogues (SPIR or SPIL), maintenance plant configuration, Bills of Materials and maintenance Works order information during new plant construction or plant expansion projects.
Selecting the best combination of materials for specific purposes.
Analyzing data using computer modeling software.
Supervising the work of materials engineering technicians and other staff.
January 2012
To January 2014
SITE ENGINEER
at AIR VOICE TECHNOLOGIES PRIVATE LIMITED
Location :
India - Hyderabad
Wiring system design following emt piping work, supervision of panel board termination and total wiring work
Engaged in Supervising in Electrical Wiring Installation, repair and maintenance of power systems of residential, commercial and industrial buildings.
Preparation of Bill of Materials and Cost Estimates of Electrical Wiring Installations, Repair and Maintenance Projects.
Domestic industrial load calculation and Cable size calculation.
Preparation of material submittals for the consultant’s approval.
Installation of lightning fixtures, power sockets, data sockets, switches for electrical loads, submersible pumps, water heaters, cable tray for the cables and safety switches with water proof sockets.
Ensure that changes are recorded on drawings with actual dimensions as required, before cover-up preparation of As Built drawings.
Ensure work is executed in accordance with the contract specifications, design approved drawings, agreed procedures and method statements.
Supervise and provide necessary guidance to workers at site.
Engaged in Supervising in Electrical Wiring Installation, repair and maintenance of power systems of residential, commercial and industrial buildings.
Preparation of Bill of Materials and Cost Estimates of Electrical Wiring Installations, Repair and Maintenance Projects.
Domestic industrial load calculation and Cable size calculation.
Preparation of material submittals for the consultant’s approval.
Installation of lightning fixtures, power sockets, data sockets, switches for electrical loads, submersible pumps, water heaters, cable tray for the cables and safety switches with water proof sockets.
Ensure that changes are recorded on drawings with actual dimensions as required, before cover-up preparation of As Built drawings.
Ensure work is executed in accordance with the contract specifications, design approved drawings, agreed procedures and method statements.
Supervise and provide necessary guidance to workers at site.