Mirza Dawar Ali Baig Dawar, Operation Manager

Mirza Dawar Ali Baig Dawar

Operation Manager

Etisalat and Emirates Facilities Management

البلد
الإمارات العربية المتحدة - دبي
التعليم
ماجستير, Mechanical Engineering
الخبرات
22 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 8 أشهر

Operation Manager في Etisalat and Emirates Facilities Management
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ أغسطس 2020
Sr. Projects Manager , Head Of Engineering في BIn Shafar Electro Mechanical (Megamec Mechanical & Electrical Contracting) L.L.C
  • الإمارات العربية المتحدة - دبي
  • يناير 2019 إلى أغسطس 2020

• Presently worked on the (Jewel of Creek Project) Development of Group Hospitality Buildings Including Hotels, Apartments, Offices, Conference Center and 4 basement levels expanding from Floating bridge to Maktoum bridge.
• Manages all Engineering work issues related with MEP works.
• Provide Support to multi-disciplinary engineering team in execution of the project.
• Ensure all technical aspects of project are strictly complied with and in conformity with condition of contract, particular condition, specification, contract drawings & BOQ.
• Coordinating with other specialist contractor for engineering and execution like Acoustic Consultant, Seismic & Vibration, Controls & Instrumentation (BMS), District Cooling plant, Cooling tower, Chiller plant manager, Grey water treatment, Infrastructure contractor, water Filtration system, Chemical flushing, Steam boilers, Hot water boiler, Solar heating system, Testing and commissioning contractors, Marine specialist Contractors, landscape contractor, Steam and sauna Contractor for smooth flow of work.
• Raising RFI, preparing method statements related with technical queries, variation for additional scope of work etc.
• Accountable for entire MEP Engineering and Construction activities on site for the project.
• Submitted and got approval for more than 2000 MEP shop drawings.
• Raised More than 1000 RFI within a short span of time.
• Submitted more than 4000 As-built drawings.

Director of Projects, Head of Department, Head of Commissioning في Saeed Mohammed Al Ghandi Investment Group/ Al Dorra Contracting
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2008 إلى يناير 2019

* Development of new projects as per the directives of the client.
* Manage all phases of project from inception to completion.
* Managing Engineering works/Projects related to Civil, HVAC, Plumbing, drainage, fire fighting, and fire alarm, electrical and low current system as per project scope, schedule, budget and quality.
* Prepare the periodic reports for management including budgets, variances/change claims, schedules, disputes and upcoming activities.
* Ensures the project is progressing as per agreed program control KPI’s and communicates/ report to the stakeholders as per the mile stone achieved in the project compared to planned project.
* Provides support to multi-discipline engineering team in Conceptual Studies, design etc.
* Identifies the project risk, mitigate the risk and prepares the contingency plan and apply the contingency plan as per the allocation.
* Prepares material requisitions for equipment / material.
* Conducts technical and commercial evaluation of bid for equipment / material selection and makes final recommendation.
* Highly skillful in carrying out design calculations as a tool for design checks by utilizing hand and computer software.
* Provides sound quality and expert solutions to problems presented by business unit or support team and meeting target date.
* Preparing Feasibility study for development of new projects.
* Managing Stakeholders as per project requirements.
* Review of Conceptual design / Basic design / Detailed Engineering on HVACs’, Plumbing, Drainage, Firefighting, Fire alarm,
Electrical and low current system for projects under design and execution.
* Ensure all technical aspects of projects are strictly complied with and in conformity with conditions of contract, particular conditions, specifications, contract drawings and BOQ.
* Coordinating with consultant for checking MEP services including shop drawings and coordinating with all government authorities
like Dewa, Dubai Civil Defence and DM as per the requirement of the project.
* Coordinate, manage and guide the consultants, contractor and subcontractors in order for smooth running of the project and on time completion of project as per the project and stakeholder’s
requirement.
* Coordinating with civil contractor to provide a clearance for civil works respect to the approved working program.
* To check the quality of work done as per the specification and design.
* To be part of asset management team by checking all the MEP services with required operation and maintenance manuals and closed out documents.
* Worked as a commissioning Head to witness the water balancing, air balancing, traverse reading for HVAC ducts, performance of LPG system, noise level checking for all occupied spaces, external
noise for all equipment’s, firefighting system, fire alarm system, structured cabling, lifts, L.V System, SMATV system, plumbing and drainage system & low current system etc.
* Preparation of Commissioning plans for the ongoing works.
* Ensuring the risks are identified and documented in the Risk register.
* Develop the strategy in coordination with site team including the projects manager, construction manager, facilities manager, etc.
* Lead the preparation of commissioning procedures and methods, assist in reviewing and monitor all recorded potential change orders.
* Manage the team progress in accordance with the commissioning program and budget allocated.

Project Manager في Al Moayyed contracting company
  • الإمارات العربية المتحدة
  • يوليو 2005 إلى يوليو 2008

A Division of Y. K Al Moayyed& Sons, Bahrain).
* Plans and analyzes assigned projects, establishes schedules and
project parameters and sets procedures to accomplish system
objectives, involving complex contracting applications.
* Supervising the team involved in execution like installation of
ducting & A/c equipment (AHU’s FCU’s, FAHU'S, Inline Fans,
roof centrifugal fans, air outlets & Pumps) and also plumbing,
drainage works and electrical works.
* Provides work orders for the site staff and prioritizes the tasks.
* Review of MEP construction program of works prepared by
planning engineer before onward submissions.
* Coordinating with authorities for drawing approval, to carry out
the work as per their requirement & to get the approval from
authorities for building services like water, electricity, telephone
and civil defense.
* Manage and coordinate with suppliers, material Request, etc.
Coordinate with engineer of other trades, consultants, Suppliers
and contractors to run the project smoothly.
* Review prepared estimates and Tendering Documents of projects
undertaken by the Company and submission of progress report to
the management.
* Responsible for project cash-flow management, progress billing,
collections support and monitoring and resource management.
* Support and mentor for Project Team.
7
* Approving and reviewing shop drawings, method statements for all
MEP services before submitting to consultant for approvals,
external static pressure calculations and pump head Calculation.
* Review daily and weekly project reports before forwarding the
same to main contractor.
* Reviewing valuations & variations claims prepared by quantity
surveyor for onward submission.
* Examines and reviews contracts and estimates by performing risk
analysis and developing risk mitigation plans. Ensures compliance
with internal contracting processes.
* Preparing contracts for the Subcontractors &certifying and
approving the work carried out by them.
* Certifying the payment for the work done by contractors.
* Checking As built drawing and other related closed out document
for handover.
* Manage and Coordinate with all other specialist subcontractor to
get the work done as per project requirement and authorities,
requirement especially firefighting and fire alarm, Telephone, Data
system, Intercom system, SMATV system, Lightning protection
system etc.

Mechanical Engineer في M/s. Rashid Al-Majid Air Conditioning Cont. Co
  • الإمارات العربية المتحدة
  • فبراير 2004 إلى يوليو 2005

Handled HVAC systems (Split A/C units and Package units) of
capacity up to 650TR, preparing material request and work
program schedules.
* To supervise the installations of HVAC systems and network of
ducting.
* Attending appraisal meeting to clarify any disputes, if any,
selection of equipment like FCU, AHU etc., heat load calculation
manually as well as by HAP software and quantity take offs etc.
* Supervised layout and installation of ducting, chilled water piping,
A/c equipment (AHU’s FCU’s, VAV’s, Diffusers, Fans & pumps).
* Preparing material Submittals, material request, etc.
* Coordinate with engineer of other trades, consultants, Suppliers
and contractors to endure smooth run of the project.
* Preparing estimates (quantity take offs), and tendering Documents
of various projects undertaken by the Company, submit progress
report to the manager.
* Designing A/c loads ducts etc., Design and calculate Heat load,
piping, pump capacity etc. evaluate daily & weekly project
schedule. & supervising plumbing Work as per the requirement of
project.
(INDIA

HVAC Engineer في M/s. Comfort Care Systems Pvt. Ltd
  • الهند - حيدر اباد
  • أغسطس 2001 إلى ديسمبر 2003

To design HVAC systems (Air cooled chiller, Package units and
Chilling plants) of capacity of 300TR using Equal Friction
Method, Heat Load Calculations and Static pressure calculations.
* Preparing the Material request and work program schedules.
* Supervising the installations of HVAC Systems, network of
ducting and head calculations of Pumps.
FEW ACCOMPLISHED PROJECTS
* Development of Group Hospitality Buildings Including Hotels,
Apartments, Offices and Conference Center (Jewel of the
Creek Development).
Project Cost: AED 1.5 Billion.
Client: Dubai International Real estate.
Consultant: Kling and Kieferle partners.
Contractor: Bic Contracting.
* 2B+G+2P+ 26 Storey Building Sharjah
Project Cost: AED 123 Million.
Consultant: Al Nahda Consultant.
Contractor: Al KautherContracting.
* B+G+12 Storey Building Sharjah
Project Cost: AED45 Million.
Consultant: Adnan Saffarini.
Contractor: Shoaib Contracting.
* Harvey Nichols Departmental Store (Mall Of Emirates)Fit out
works
Consultant: WSP Middle East.
Contractor: Al Tayer Stocks.
* International City Package 9&14 (England& France)(Mixed
Used Development of 58 Residential& Commercial Buildings)
Project Cost: AED 465 Million.
Client: Nakheel
Consultant: ACE Consulting Engineer.
Contractor: Nurol General Contracting / Ranya Test.
* B+ G + 27 + 2 PH Hotel Apartments@ Dubai Marina
Project Cost: AED108 Million.
Client: Emaar Properties PSJC.
Consultant: Arch Group.
Contractor: Gammon &Billimoria.
9
* B+ G+M+2 (Residential Buildings Of100 Flats) @Jaffiliya
Project Cost: AED95 Million.
Client: Al Ghandi Properties.
Consultant: WSP Middle East.
Contractor: Al Dorra Contracting& General Maintenance.
* IVECO Truck Service Center @Ras Al Khor.
Project Cost: AED 18 Million.
Client: AlGhandi Auto.
Contractor: AlDorra Contracting& General Maintenance.
* Extension of Ras Al Khor Showroom & Offices.
Project Cost: AED 46 Million.
Client: Al Ghandi Properties.
Consultant: Orion Consultants.
Contractor: Al Dorra Contracting& General Maintenance.
* Diamond Factory @ Ras Al Khaima
Project Cost: AED 29 Million.
Contractor: Al Mushrif Contracting.
* Construction Of Two Private Lakes @ Nad Al Shiba For H.E
Mr. Saeed Mohammed AlGhandi.
Project Cost: AED 12Million.
Client: Al Ghandi Properties.
Contractor: Al Dorra Contracting& General Maintenance /
Desert Landscape.
* Construction of Fiat Showroom @ Ras Al Khor (Fit out
works)
Project Cost: AED 6 Million.
Client: National Auto.
Contractor: Al Dorra Contracting& General Maintenance.
* G+1 Juma Mosque @ NAS 4For H.E Mr. Saeed Mohammed
AlGhandi.
Project Cost: AED 73Million.
Client: Al Ghandi Properties.
Project Management: Al Ghandi Properties
Contractor: Al Mazrouei and Bowyer.
* 2B+ G + 4P+ 32Residential Tower @Silicon Oasis.
Project Cost: AED 295Million.
Client: Al Bustan Properties.
Project Management: Al Ghandi properties.
10
* Construction of Luxurious Villa on Sand dune @ RAK facing
the Sea.
Project Cost: AED 55 Million.
Client: AlGhandi Properties.
Contractor: AlDorra Contracting & General Maintenance.
* 2B+G+4P+ 16Proposed Hotel and Hotel Apartments
Commercial Development at Oud Metha Road For H.E Mr.
Saeed Mohammed AlGhandi. (Tender Completed)
Project Cost: AED 450Million.
Client: Al Ghandi Properties.

الخلفية التعليمية

ماجستير, Mechanical Engineering
  • في Jawaharlal Nehru Technological University
  • سبتمبر 2018

Master in Thermal Engineering

بكالوريوس, Mechanical Engineering
  • في Visvesvaraya Technological University
  • فبراير 2002

Specialties & Skills

Estimation
Project Management
Planning
ASSET MANAGEMENT
BILLING
BUDGETING
CABLING
CASH FLOW
CONCEPTUAL DESIGN
CONSULTING
CONTRACT MANAGEMENT

اللغات

العربية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس

العضويات

PMP
  • Member
  • November 2013

التدريب و الشهادات

Sound Contract Administration and Advance Contract Management (تدريب)
معهد التدريب:
Dr Sam FZE
المدة:
40 ساعة