planning manager Cost Estimation
الرواد
Total years of experience :19 years, 1 Months
Making the plan for the production schedule for all section
Issuance work orders for the factories.
Estimated materials for some items after checking drawings with the cutting list.
Issuance delivery orders for raw materials belong to work orders and providing the factories with some indirect materials as a safety stock.
Control Over Material Issued For Work Order And Report.
Making the Reorder Level for ( raw materials - finished goods )
Cost Estimation For Products.( Standard & Projects ) Items .
Actual Cost & Find Deviation After Production Finished.
Writing Price Quotation with All details included.
Fixing Standard Cost of Products.
Supervisor to permission to be shipped.
Encoding: encoding furniture finished goods, semi finished and raw material.
Issuance reports about the following:
1. Reports about the achievement percentage by the standard points. Also selling price compared with cost price of them.
2. Comparison between the plan and the achievement and the variation between them
3. Reports about Labor Efficiency
1- عمل خطة لجميع اقسام المصنع
2- عمل لستة قائمة الخامات لجميع المنتجات
3-عمل حد طلب لجميع المواد الخام الأزمة فى عملية التصنيع
4- عمل حد طلب لجميع المنتجات التامة بناءا على خطة البيع
5-عمل طلبات شراء للمواد الخام التى تحت حد الطلب
6- عمل أوامر الشغل الخاصة بالتشغيل لكل قسم مرفق معه المواد الخام الزمة لعملية التصنيع بدأ من الخشب إلى القشرة إلى الاكسسورات إلى الدهانات إلى التغليف
7- عمل تكاليف للمنتاجات النمطية وتحديد واقتراح سعر البيع
8- عمل تقارير بالكمية المنتجة من الطاقة المفتردة للمصنع
Making the plan for the production schedule for all section
Issuance work orders for the factories.
Estimated materials for some items after checking drawings with the cutting list.
Issuance delivery orders for raw materials belong to work orders and providing the factories with some indirect materials as a safety stock.
Control Over Material Issued For Work Order And Report.
Making the Reorder Level for ( raw materials - finished goods )
Cost Estimation For Products.( Standard & Projects ) Items .
Actual Cost & Find Deviation After Production Finished.
Writing Price Quotation with All details included.
Fixing Standard Cost of Products.
Supervisor to permission to be shipped.
Encoding: encoding furniture finished goods, semi finished and raw material.
Issuance reports about the following:
1. Reports about the achievement percentage by the standard points. Also selling price compared with cost price of them.
2. Comparison between the plan and the achievement and the variation between them
3. Reports about Labor Efficiency