Mostafawally Wally, planning manager  Cost Estimation

Mostafawally Wally

planning manager Cost Estimation

الرواد

Location
Egypt - Cairo
Education
Bachelor's degree, كيمياء وطبيعة
Experience
19 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 1 Months

planning manager Cost Estimation at الرواد
  • Saudi Arabia - Riyadh
  • My current job since June 2015

 Making the plan for the production schedule for all section
 Issuance work orders for the factories.
 Estimated materials for some items after checking drawings with the cutting list.
 Issuance delivery orders for raw materials belong to work orders and providing the factories with some indirect materials as a safety stock.
 Control Over Material Issued For Work Order And Report.
 Making the Reorder Level for ( raw materials - finished goods )
 Cost Estimation For Products.( Standard & Projects ) Items .
 Actual Cost & Find Deviation After Production Finished.
 Writing Price Quotation with All details included.
 Fixing Standard Cost of Products.
 Supervisor to permission to be shipped.
 Encoding: encoding furniture finished goods, semi finished and raw material.
 Issuance reports about the following:

1. Reports about the achievement percentage by the standard points. Also selling price compared with cost price of them.
2. Comparison between the plan and the achievement and the variation between them
3. Reports about Labor Efficiency

مديرتخطيط ومتابعة وتكاليف at الحلو استيل للأثاث المعدنى
  • Egypt - Cairo
  • January 2014 to June 2015

1- عمل خطة لجميع اقسام المصنع
2- عمل لستة قائمة الخامات لجميع المنتجات
3-عمل حد طلب لجميع المواد الخام الأزمة فى عملية التصنيع
4- عمل حد طلب لجميع المنتجات التامة بناءا على خطة البيع
5-عمل طلبات شراء للمواد الخام التى تحت حد الطلب
6- عمل أوامر الشغل الخاصة بالتشغيل لكل قسم مرفق معه المواد الخام الزمة لعملية التصنيع بدأ من الخشب إلى القشرة إلى الاكسسورات إلى الدهانات إلى التغليف
7- عمل تكاليف للمنتاجات النمطية وتحديد واقتراح سعر البيع
8- عمل تقارير بالكمية المنتجة من الطاقة المفتردة للمصنع

مسئول قسم التخطيط والمتابعة at هابيتات ( habitat )
  • Egypt - Cairo
  • May 2001 to January 2010

 Making the plan for the production schedule for all section
 Issuance work orders for the factories.
 Estimated materials for some items after checking drawings with the cutting list.
 Issuance delivery orders for raw materials belong to work orders and providing the factories with some indirect materials as a safety stock.
 Control Over Material Issued For Work Order And Report.
 Making the Reorder Level for ( raw materials - finished goods )
 Cost Estimation For Products.( Standard & Projects ) Items .
 Actual Cost & Find Deviation After Production Finished.
 Writing Price Quotation with All details included.
 Fixing Standard Cost of Products.
 Supervisor to permission to be shipped.
 Encoding: encoding furniture finished goods, semi finished and raw material.
 Issuance reports about the following:

1. Reports about the achievement percentage by the standard points. Also selling price compared with cost price of them.
2. Comparison between the plan and the achievement and the variation between them
3. Reports about Labor Efficiency

Education

Bachelor's degree, كيمياء وطبيعة
  • at جامعة الأزهر
  • May 1999

بكالوريوس علوم وتربية

Specialties & Skills

Report Production
Furniture
Furniture Placement
Home Furnishings
الكمبيوتر
الفوتوشوب
العمل الجماعي بروح الفريق
الابتكار لحلول المشاكل
التواصل

Languages

English
Intermediate

Memberships

الشباب والرياضة
  • منتظم
  • May 2011

Training and Certifications

جيد جدَا (Certificate)
Date Attended:
May 2002
Valid Until:
January 9999

Hobbies

  • الكمبيوتر ( عمل - مراسلات ) - الإطلاع على الجديد فى مجالى
    تعلمت معرفة عمل برنامج على Access