Mostafawally Wally, planning manager  Cost Estimation

Mostafawally Wally

planning manager Cost Estimation

الرواد

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, كيمياء وطبيعة
Expérience
19 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 2 Mois

planning manager Cost Estimation à الرواد
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis juin 2015

 Making the plan for the production schedule for all section
 Issuance work orders for the factories.
 Estimated materials for some items after checking drawings with the cutting list.
 Issuance delivery orders for raw materials belong to work orders and providing the factories with some indirect materials as a safety stock.
 Control Over Material Issued For Work Order And Report.
 Making the Reorder Level for ( raw materials - finished goods )
 Cost Estimation For Products.( Standard & Projects ) Items .
 Actual Cost & Find Deviation After Production Finished.
 Writing Price Quotation with All details included.
 Fixing Standard Cost of Products.
 Supervisor to permission to be shipped.
 Encoding: encoding furniture finished goods, semi finished and raw material.
 Issuance reports about the following:

1. Reports about the achievement percentage by the standard points. Also selling price compared with cost price of them.
2. Comparison between the plan and the achievement and the variation between them
3. Reports about Labor Efficiency

مديرتخطيط ومتابعة وتكاليف à الحلو استيل للأثاث المعدنى
  • Egypte - Le Caire
  • janvier 2014 à juin 2015

1- عمل خطة لجميع اقسام المصنع
2- عمل لستة قائمة الخامات لجميع المنتجات
3-عمل حد طلب لجميع المواد الخام الأزمة فى عملية التصنيع
4- عمل حد طلب لجميع المنتجات التامة بناءا على خطة البيع
5-عمل طلبات شراء للمواد الخام التى تحت حد الطلب
6- عمل أوامر الشغل الخاصة بالتشغيل لكل قسم مرفق معه المواد الخام الزمة لعملية التصنيع بدأ من الخشب إلى القشرة إلى الاكسسورات إلى الدهانات إلى التغليف
7- عمل تكاليف للمنتاجات النمطية وتحديد واقتراح سعر البيع
8- عمل تقارير بالكمية المنتجة من الطاقة المفتردة للمصنع

مسئول قسم التخطيط والمتابعة à هابيتات ( habitat )
  • Egypte - Le Caire
  • mai 2001 à janvier 2010

 Making the plan for the production schedule for all section
 Issuance work orders for the factories.
 Estimated materials for some items after checking drawings with the cutting list.
 Issuance delivery orders for raw materials belong to work orders and providing the factories with some indirect materials as a safety stock.
 Control Over Material Issued For Work Order And Report.
 Making the Reorder Level for ( raw materials - finished goods )
 Cost Estimation For Products.( Standard & Projects ) Items .
 Actual Cost & Find Deviation After Production Finished.
 Writing Price Quotation with All details included.
 Fixing Standard Cost of Products.
 Supervisor to permission to be shipped.
 Encoding: encoding furniture finished goods, semi finished and raw material.
 Issuance reports about the following:

1. Reports about the achievement percentage by the standard points. Also selling price compared with cost price of them.
2. Comparison between the plan and the achievement and the variation between them
3. Reports about Labor Efficiency

Éducation

Baccalauréat, كيمياء وطبيعة
  • à جامعة الأزهر
  • mai 1999

بكالوريوس علوم وتربية

Specialties & Skills

Report Production
Furniture
Furniture Placement
Home Furnishings
الكمبيوتر
الفوتوشوب
العمل الجماعي بروح الفريق
الابتكار لحلول المشاكل
التواصل

Langues

Anglais
Moyen

Adhésions

الشباب والرياضة
  • منتظم
  • May 2011

Formation et Diplômes

جيد جدَا (Certificat)
Date de la formation:
May 2002
Valide jusqu'à:
January 9999

Loisirs

  • الكمبيوتر ( عمل - مراسلات ) - الإطلاع على الجديد فى مجالى
    تعلمت معرفة عمل برنامج على Access