Mohamed Nurain, Senior Planning Engineer

Mohamed Nurain

Senior Planning Engineer

Archen Engineering Consultants

Lieu
Arabie Saoudite - Riyad
Éducation
Baccalauréat, Civil Engineering
Expérience
24 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 3 Mois

Senior Planning Engineer à Archen Engineering Consultants
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis décembre 2016

Nature of Projects Multi-Housing Compounds Projects
Client
- Ministry of Interior
Projects:
- South Border Housing (SBH) (A master project comprising of 5 projects (Jazan A, Jazan B, Najran, Aseer & Eastern province) with a total number of sites equals 16 sites, “compounds”. The compound capacity ranges between 200 To 1700 residential units. The total project value is 17.5 billion Saudi Riyal). The scope of the project for the contractors is to prepare detailed design, engineering procurement, construction, testing & commissioning of a total of 10, 000 residential units including apartment buildings, villas, schools, male & female kinder gardens, sport clubs, mosques, clinics, shopping centers, recreational facilities, military police buildings, service buildings, administrative buildings, warehouses, workshops, petrol stations and others.
Scope also comprises all infrastructure, roads, landscaping, and utilities including sewage treatment plants, RO plants, ancillary buildings, and other external works.
Responsibilities:-
1) Review contractor’s construction baseline schedule and ensure that all elements of project scope are included in the baseline schedule and the schedule is in line with contractual obligations.
2) Ensure that the baseline schedule as well as the schedule updates have been prepared with level of quality required.
3) Prepare the planning section of the monthly progress report that should be submitted to the client by the consultant.
4) Review, study, analyze and assess contractors’ extension of time claims with the use of time impact analysis method.

Planning Engineer & Projects coordinator à Mouchel Middle East Ltd.
  • Arabie Saoudite - Riyad
  • juin 2013 à décembre 2016

Infrastructure Design & Supervision Projects with the following Clients:
MOT (Saudi Arabia)_ ROADS
Riyadh Municipality. ROADS & STORM WATER.
MODON. Design Infrastructure of Industrial Cities

Projects:
Supervision of Express Highway & Sub Roads of Jazan Region.
Supervision of Majmaah / Shaqra & Sub Roads of Riyadh Region.
Riyadh Second Southern Ring Road (Design).
Third Riyadh Ring Road_South (Design).
Storm water network, Riyadh (Design).
Sudair Industrial City, Sudair (Design).
Qassim Industrial City, Qassim (Design).
Responsibilities:-
Planning & scheduling with Primavera P6.
Maintain Schedule on track when slip occurs.
Perform all necessary coordination tasks for all infrastructure projects.
Participate in schedule review and coordination meetings.
Perform all necessary coordination tasks for all infrastructure projects.
Prepare and submit projects coordination report whenever required by the contract.
Prepare and submit projects coordination report whenever required.
Preparations and submission of contractors’ monthly progress report.
Review and submit contractors’ technical documents.
Prepare financial forecast for supervision projects to monitor cash flow.
Preparation and submission of supervision invoices.

Planning Engineer à Noble Consult Co.
  • Soudan - Khartoum
  • mai 2010 à février 2013

Jabir Abu-Aliz Diabetic Centre
About the project:
Jabir Abu-Aliz Diabetic Centre comprise the followings:
In-patient & Out-Patient Clinics.
Diabetes Support Unit.
Eye Care Unit.
Diabetic Foot Care.
Medical Labs and other medical facilities.
Responsibilities:
Planning, scheduling & re-scheduling of critical and inter-related tasks with the use of primavera.
Take necessary steps to get schedule on track when slipping occurs.
Cost & quality control.
Coordinate and liaise with the project’s stakeholders.
Ensure that necessary coordination work is carried out properly to avoid waste of resources or poor quality.
Arrange coordination meetings, record comprehensive meeting minutes and monitored entire project documentations
Follow and control producing utilities shop drawings.
Planning, scheduling & re-scheduling of critical and inter-related tasks with the use of primavera.
Prepare quality management plan.
Coordinate and liaise with the project’s stakeholders.

Planning Engineer à UNDP
  • Trinidad et Tobago
  • mai 2006 à mai 2010

Under the United Nations Development Program, UNDP, a program titled “Institutional strengthening and capacity building for the good governance in Tobago” and I was attached to the Division of Infrastructure & Public Utilities, DIPU.
There are many roads projects under the supervision of the DIPU.
i. Studley Park Quarry Re-development.
About the project:
The project deemed strategic project to the island of Tobago. Studley Park Quarry was the major quarry in the island and it went under a comprehensive development plan to increase its capacity and scale of production. The main elements of the substantial investment (in excess of US$ 14 million) were a Crushing Plant with the associated equipment of drilling rig, excavators, dump trucks, front end loader, weighbridge, telescopic-handler and transformer and generator.
Responsibilities:-
Identify the project deliverables, milestones, and required tasks and targets to determine the staffing requirements, and allotment of available resources to various phases of the project through the project measurement system.
Coordinate with the contractor concerning schedule, sequence of work, and best methods for construction.
Implement the work schedule and monitor progress of the work for timely execution of the project through daily, weekly, monthly reports with respect to review of the overall project.
Ensure that project controls documents such as resources histogram, schedules, reporting systems, material controls systems, etc., are fully developed.
Coordinates with the contractors on utilities issues.
Arrange coordination meetings, record comprehensive meeting minutes and monitor entire project documentations.
Provide coordination of construction and special projects as they pertain to the utilities companies.
Reviewing plans and preparing cost estimates.
Planning & scheduling and prepare progress reports.

ii. UWI University Campus Project
About the project:
The building project has three main components:
Administration building.
Labs
Class rooms
Toilets including disabled toilets.
Activity Yard.
Responsibilities:-
Utilities coordination.
Projects coordination.
Planning and scheduling.
iii. Scarborough Regional Hospital Project, Signal Hill.
About the project:
The project comprise construction of the 100 plus bed, general acute care facility. The Campus is an open pavilion and multiple wards style layout and it is meant to serve as the major general hospital of Tobago island.
Responsibilities:-
Provide technical support as part of design team under supervision of the chief civil engineer of the DIPU.
Act as focal point of contact for the project with the client and contractors
Review and approve contractor’s payment certificate.
iv. Rehabilitation of Tobago Library.
About the project:
The project is aimed, mainly, to rehabilitate The Tobago Library, which was hardly hit by an earthquake in 1997.
Responsibilities:-
Planning and scheduling.
Preparing BOQs.
Representing the ministry as senior civil engineer.
Ensure that the construction work is being carried out as per contract, standards, and specs.
Representing the ministry in the progress following-up meetings.
Support the contractor with engineering opinions and advices in making decisions on constructability problems.
v. Coastal protection and remedy of areas affected by landslide.
About the project:
The Tobago Island has so many areas of high and severe susceptibility to coastal erosion and landslides. The DIPU put up projects to protect the community and properties erosion and landslides.
Responsibilities:-
Supervise construction of different types of retaining walls to protect roads on cliff areas.
Design and supervise construction of sea walls.
Treatment of landslide coastal area by soil revetment & construction of gabion basket walls.

Planning Engineer à CD Consulting Company
  • Soudan - Khartoum
  • mars 2005 à avril 2006

Project:- Building two buildings (8 story each-residential)

About the project:

It is a turnkey project for two story buildings.
Responsibilities
Planning and scheduling.
Preparing BOQs.
Prepare and submit contractor’s monthly progress report.

Civil Engineer à CMC di Ravenna
  • Soudan - Khartoum
  • septembre 2004 à mars 2005

Corinthia Five Star Hotel and Commercial Centre (Previously called Burj Al-Fatih)
About the project:
The hotel and commercial centre was a spectacular project at a cost of over 80 million Euro. It is a five-star hotel in central Khartoum with an oval curved facade and has 18 guest floors, 173 rooms and 57 suites, all offering panoramic views. The hotel has six restaurants and cafes and leisure facilities including spa, gym, tennis and squash courts.
Responsibilities
Projects coordination.
Attend projects & schedule review meetings.
Supervise construction work of the commercial centre.
Supervise installation of steel frames.

Civil Engineer à Concrete Cntarcting Company
  • Soudan - Khartoum
  • juillet 2003 à septembre 2004

Burri Electrical Distribution Substation
About the project:
The project is to construct electricity distribution substation with the following features:
Two transformers’ room.
Two Auxiliary transformers room
Switch & control room
Cable trenches.
Responsibilities
Supervise construction of electrical substation elements including isolated transformers’ room, auxiliary transformers’ room, and cable trenches.
Ensure that the structural works are being done in coordination with MEP requirements.
Issue and follow all material requisitions required at site.
Prepare monthly reports.

Site civil engineer à Alyamamah Co. for Trading & Contracting
  • Arabie Saoudite - Riyad
  • novembre 1999 à juin 2003

Site Civil Engineer
Saudi Arabian Agricultural Bank and other projects.

The Headquarters of the Saudi Arabian Agricultural Bank (SAAB)
The project was a multi-story building of The Saudi Arabian Agricultural Bank Building consists of 2 basement + ground floor + mezzanine floor + 7 floors + 8th suspended floor with a total floor area 39000 M2.

Responsibilities:
===============
Supervision of all construction activities.
Supervise concrete repairs works.
Supervise earthworks and paving

Éducation

Baccalauréat, Civil Engineering
  • à Omdurman Islamic University
  • octobre 1999

Specialties & Skills

Housing
Projects Planning & Management
Scheduling and Controlling.
Construction procedures
Plan for Stakeholder Management
Infrastructure Projects
Planning
Site Planning
Project Coordination
Project Management

Langues

Arabe
Langue Maternelle
Anglais
Expert

Adhésions

the Sudan Engineering Council
  • graduate engineer
  • March 2006
Saudi engineering council
  • Professional Civil Engineer
  • May 2013

Formation et Diplômes

Management Accountancy (Formation)
Institut de formation:
The New Way Institute
Date de la formation:
January 2016
Durée:
100 heures
Financial Management (Formation)
Institut de formation:
The New Way Institute
Date de la formation:
April 2016
Durée:
30 heures