Sr Land Surveyor
HBK contracting doha qatar
مجموع سنوات الخبرة :20 years, 5 أشهر
• Road related matters for storm water drainage, sewerage, potable water, TSE, IRRIGATION Electric cable, streetlights cable and telephone ducts.
• Excavation, formation, pipe laying, surround backfilling and standard tests for various services.
• Earth works, formation, sub base, and asphalt work for roads in highly congested site connecting and serving the many various high-rise buildings.
• Marine Works Including Quay Wall, Crown Wall, Break water and Street Light, Electric and mechanical Survey and Piling.
● Control top level of concrete
● Establishment of Horizontal and Vertical control points for fixed reference using Total Station and level
● Inspection of Control points and Joint surveys with sub-contractors
● Piles Cut Level, Load Test of Slab with (DNA03 LIECA)
● Precise Levelling & as Built of slab
● Setting out of Leis line marking
● Supervising of Excavation and Concrete Piling Work
● Lay-out of Grid lines and Axis for columns and footings.
● Lay-out and setting out of vertical and horizontal alignment of columns and footings, slabs, doors. Stairs
● Inspection of, pedestals, concrete columns, slab, alignment of Girders and TG-Rails in Plotline Area
● Excavation of Earthwork.
● Layout (setting out) of Runway Level mark of Embankment, Capping and ABC.
● Setting out for asphalt and control level on runway, Taxi area.
● Setting out Apron, Taxi way, Turn Pad area and Control Levelling.
● Setting out For PQC Apron, Turn Pad 01, Turn Pad19 area and Control Level.
● Setting out of all approach Road and Accesses Road and Control Level.
● Setting out Drain And Low flow swale Area and Control Level.
● Setting out for secondary Duct Bank In Runway, Taxi, Apron, Turn Pad Area.
● Setting out For Man hole And hand hole And Light Points in Airport Area.
● Setting out For AGL On Runway, Taxi A, B, C, And Both Turn Pad
1. M/s.Galfar Engineering & Contracting SAOG, Oman (March 2010 to Dec 2013)
Project: Dualisation of the Izz-Adam section of the Nizwa-Thumrait Client: Muscat Municipality
Consultant: Bootek Engineering Consultant Oman
Position: Land Surveyor
Duties and Responsibilities:
• Setting out and leveling for execution of road works.
• Setting out and leveling for execution of all structure works
• Traversing & Leveling For Control Point
• Setting Out For Bride IC 01 To IC 06 And Control Level
• Setting Out For Retaining Wall And Mse Wall
• Setting Out For Calvert In Project Area
Project: Muscat Express Way
Client: Muscat Municipality
Consultant: Parsons International LLC
Position: Land Surveyor
Duties and Responsibilities:
• Lay out (setting out) of Road
• Setting out and level marking Curb Stone and crush barrier
• Setting out For guard post along the Road
• Control level for layer Embankment, Sub Grade, ABC, BBC, BWC
• Rolling straight for level
• Road marking of main carriage way and loop and ramp road also service road
2. M/s. City Surveys, Abudhabi -UAE ( Nov 2008 to March 2010)
Working as Land Surveyor with the following companies on Hire Basis.
1. M/s.Arab Construction Company - Oil Refinery of Ruwaise, UAE
2. M/s.Bin Hafeez L.L.C - Parking Lakes project, International City, Dubai
3. M/s.Al Anbar L.L.C - Plam Jumarah, Dubai
4. M/s.Al Manarah Consultancy - Sultanate of Oman
Duties and Responsibilities:
• Excavation of Earthwork
• Lay out (setting out) of Road
• Setting out and level marking Curb Stone and crush barrier
• Setting out For guard post along the Road
• Control level for layer Embankment, Sub Grade, ABC, BBC, BWC Rolling straight for level
• Topographic Survey Abu Dhabi, Dubai, Sharjah, Ajman, Muscat (Oman)
3. M/s. Geomatic and Engineering Services (Pvt) Ltd (Feb 2005 to Aug 2008)
5. Patrind Hydropower Project in Muzafrabad, Azad Kashmir
6. R.B.O.D. Project. (Sindh) Pakistan
7. Dasu Hydropower Project Dasu.Pakistan
8. Sukhi Kinari Hydropower Project Kaghan Pakistan
9. Gabral Hydropower Project Kalam (NWFP)
10. NTC TMP_LODHRAN (Section) N_5
11. Gawadar International AirPort (Bolochestan) (Funded Project by CAA)
12. Lucky Low Hydropower Project Marala
13. Peshawar Inter National Air Port Topographic Survey
Tasks:
• Checking of Horizontal and Vertical Control of Dam Site and Reservoir area.
• Geotechnical Survey sport to Geologist and Reflection Survey team personal.
• Location marking of Borehole and test pits Dam site and Reservoir area.
• Cross-section of moraine and proposed Dam axis at various locations along River Indus.
• All Calculation and plotted work in computer.
• Topographic Survey of N-5 Road with Cross Section Shape (107 Km)
• Condition Survey of Shah dad Kot Drainage System and Indus Link-1, 2&3.
• Topographic Survey of proposed Channel from Indus Link to Indus River.
• Down loading And Data Processing
• All Calculation and plotted work related to CAA On Peshawar Airport Pakistan
4. M/s. S.H.Noor & CO (Pvt) Ltd. (SINDH), Pakistan (Aug 2003 to Feb 2005)
Project: Palace Villas.
Position: Surveyor
Duties and Responsibilities:
• Topographic Survey for Residential and Sewerage route Area.
• Demarcation of Buildings, Lay out of Roads
• Construction Supervision of Roads and Sewer System.
• Download of Survey Data and plotted for contouring in Eagle point, Auto-Cad.
• Civil Engineering: 2015 - 2019
• Secondary School Certificate: 2000 And 3 year Diploma in civil Engineering 2003
Diploma in civil engineering