Cost Control Engineer
Arabian Construction Company (ACC)
Total years of experience :13 years, 11 Months
Monitors the financial progress of a project, computes operating fixed and variable costs and compares such costs to budgets. Comparing budget amounts to actual expenses is an accounting function that helps senior management adjust project costs while work is still in progress. This procedure is also called variance analysis. A cost controller typically reports periodic financial statements to a company's finance chief and ensures that accounting procedures and systems are adequate and functional.
-Verdun height :Site Engineer False ceiling over 55 apartments .
- Eauone Hamra: Site Engineer and shop drawing for 60 apartments (false ceiling, parquet, wood cladding etc.)
-Site supervision, preparing site meetings between main contractor and ID .
-Execution Drawing, and Shop Drawings.
- Attending Meeting with Material Suppliers to coordinate with Concept design.
-Site supervision, preparing site meetings between clients and suppliers.
-Preparing labour working sheets.
-Interior design work for a private apartment in Achrafeieh Beirut with a total area of 350 meter square.(concept study, furniture design and layout lighting layout, finishing materials)
-Interior Design work for a small apartment in Marelias Beirut with a total area of 160 meter square.(concept study, furniture design and layout, lighting layout, finishing materials)
-As build drafts, Electric, mechanical, water and all autocad works.
-Prepared working set drawings, specifications, and construction documents.
Worked as an Architectural Site Engineer and problem solver
-BS in Architectural Engineering -RIBA Part I