Lead Risk and Control Engineer
KEO International Consultants - Saudi Arabia
مجموع سنوات الخبرة :11 years, 7 أشهر
• Assessing the risk management practices and recommending plans for building risk management programs.
• Develop and communicate the annual Process Risk Management plan and monitoring its progress.
• Perform Qualitative and Quantitative risk analysis.
• Prioritize the requirements for the risk response identification.
• Analyze risk process performance against established metrics in order to drive risk process improvements.
• Liaise with the team of professional planners and supports Project Controls Lead in all Upstream
• Engage with various downstream entities as required - PMO, PMC, LDC, Contractors etc.
• Establish, review, and update Risk Management Plan according to the best international standards (ISO, PMI).
• Manage the updating of Project risk register based on the risk management meetings or the project updated reports.
• Conduct risk meetings and workshops with the project team and stakeholders to identify new risks, update the consequences, risk action plan along with risk owner.
• Perform qualitative and quantitative risk assessment using Primavera Risk analysis software and @risk software to perform Monte Carlo simulation risk analysis.
• Develop and maintain a risk matrix identifying dependencies and the impacts of not meeting scheduled dates.
• Monitor projects and ensure that an adequate and robust Risk Management process is under active management.
• Implement an internal PMO Risk Management Plan, Risk register, and associated governance processes.
• Track significant risks to ensure that they are being systematically identified, recorded, evaluated, actively managed, and regularly re-evaluated, and communicated across the program.
• Identify, communicate, and manage inter-program or external risks.
• Develop presentations and dashboards summarizing the status of the project and program risks.
• Monitors, analyses & reports on project performance using qualitative and quantitative tools.
• Plans, coordinates, and monitors activities of assigned projects to develop and implement procedures,
• Review and analyze data/schedule received from the other organizations (Designers, PMCs, and Contractors).
• Preparing progress presentations and supporting internal and upstream reporting for the clients.
• Develop Risk Management Plan for Khattmat Malaha project.
• Create and update risk register.
• Coordinate and lead risk management meetings.
• Facilitate gathering risk information with different disciplines.
• Participate in project meetings and discussions with the Client as required.
• Ensuring site staff have an awareness of project risk management (training where appropriate).
• Ensuring that all identified risks have mitigation actions/controls/fallbacks plans with dates and action owners.
• Monitor and control Risk Registers during the project Phases.
• Evaluating the effectiveness of the risk responses and the determined contingency reserves.
• Keeping track of the identified risks and those on the watch list.
• Project risk register to be reviewed and updated on a regular basis.
• Prepare and update the lesson learned report.
• Create a detailed revised baseline schedule of the project based on amendment no.5.
• Review/approve baselines/updates submitted by subcontractors.
• Prepare bi-weekly/monthly reports.
• Follow up subcontractors/suppliers’ performance/progress.
• Attend and support in the bi-weekly internal and external meetings.
• Assist, create, & support in Cost to Complete (CTC) reports and presentations
Working as a Risk/Planning/Projects Control Engineer at the Headquarter and
responsible for:
• Maintain and update the Overall Master Programs for each project and Roll
up to overall HAP Master Program.
Page 2 of 11
• Support to develop pre-contract stages tracker (Action to Tender) and
monitor by maintain and update the Action to tender for the assigned projects.
• Support to manage the potential claims and provide a time assessment by
maintain and update a potential claims log for the assigned projects.
• Support to review and assess EOT claims, Review/Discuss the assessment
and give planning recommendation for the assigned projects.
• Support to develop the workflow of projects costs relevant to the project
budget with fully coordination with the line manager and others colleague
specially with commercial team.
• Prepare and develop different levels of schedule programmes loaded with all
resources using P6.
• Follow up to have the contractors and Construction reports on time, and
Issue monthly reports.
• Develop Risk Management Plan for HAP projects including the
recommendations of the potential responses required for major risks.
• Coordinate and lead risk management meetings.
• Facilitate gathering risk data and information with different departments/
projects.
• Prioritizing the requirements for risk response identification.
• Accurately assessing the potential impacts of the identified risks.
• Formulating appropriate responses to the identified risks.
• Reporting risk status to key stakeholders and top management.
(1 year 4 months)
Giza, Egypt
Working for
1. Execution of block works and plaster works of 20 villas and 3 floors of two
residential towers.
2. Execution of repair and strengthening works of the defected slabs and
columns by concrete replacement and concrete jacketing.
Working at Palm Hills 6th of October Project.
• Duties:
• Ensuring that all materials used and work performed are as per
specifications.
Page 5 of 11
• Organize labors into teams each by their skills to get the best work quality
and assign responsibilities and job description to the site Foreman.
• Execution and overseeing all finishing items works.
• Execution of repair and Strengthening works.
• Solving problems and providing technical advice.
• Follow up the quality control at site.
• Reporting directly to the Project Manager.
• Handing over all site works to the
(1 year 1 month
1.Execution and supervision of pile cap repair, pile surface preparation
and works of PVC membrane waterproofing for almost 70% of total project
piles(1121 piles), raft sections including more than 25 wells of dewatering as
well as retaining walls partitions from subcontractor EMAC.
2.Execution and supervision of geotechnical works of almost 50% of bored
piles, anchors, base plug, diagonal and horizontal struts, walling beams,
capping beam, dewatering as well as excavation from subcontractor BAUER.
3.Leading a team formed of 1 foreman, 5 masons, 15 workers as well as all
subcontractors.
Nile Chornich Towers Project.
• Inspected the construction process in the project as a whole.
• Submitted weekly progress reports to the supervising field engineer.
• Following-up all running activities daily.
1 month)
Cairo Governorate, Egypt
Mivida Project.
• Inspection for the delivered finishing materials for the approval.
• Supervision of the finishing works including (Marbles, ceramics, Internal &
Outer paintings, door & window carpentry) from the contractor.
• Supervision on the execution process of finishing works at the snagging
stage.
saudi binladin group
Hurghada, Red Sea Governorate, Egypt
Hurghada International Airport Project
• Inspection of steel elements (beams, columns, C channels and bolts).
• Supervision of the painting of exposed and shotcrete non exposed steel
elements.
• Inspection and supervision of the block work and cladding over all the project.
• presented a report for all running activities of the project.
Cairo Governorate, Egypt
MADINET NASR FOR HOUSING & DEVELOPMENT.
Taj Sultan, Nasr Gardens and El Waha Projects.
• Using a 3D Panel system (Enbuil Limited system) instead of both block works
and steel reinforcement for the first time at this project.
• Pannels are Higher R or U Thermal Values,
Reduction in construction time and eliminating the need of heavy equipment at
the job site
Due to the light weight of the panels.
• Illustrations and conclusions of that system by preparing a report included
errors and main problems occurred by using untrained workman ship for that
system..
• Perform a successful loading test on that test achieved 120% results.
VINCI Energies - Services for energy and Infrastructures
1 month)
Cairo Governorate, Egypt
Cairo Metro Line 3 phase 2, Kollyet Elbanat Station Project
• Inspection for all running activities.
• Follow up the TBM (Tunnel Boring Machine) while working.
• Survey works around and in the Baron palace as built before TBM dig below
it.
• Follow up the concrete activities at platform, intermediate, ticket and roof
levels.
Panorama El Jabal El Akhdar Project
• Comparing between two types of form work for slabs Doka shorebrace
system and Doka flex S slab system.
Page 9 of 11
• Inspection of Tech forms for columns to be casted.
• Follow up the survey and form works.
The 8th stage of El Rehab City Project.
The 8th stage of El Rehab City Project.
• Inspection of the construction process in the project as a whole.
• Submitted weekly progress reports to the supervising field engineer.
• Following-up all running activities daily.
• Supervision on the execution process of concrete works, form works, finishing
works.
1 month)
Dokki, Giza Governorate, Egypt.
• Identify of the various concrete test machines.
• Identify different types of concrete.
• Identify different types of concrete aggregates and admixtures.
• Focus on special types of concrete such as RPC (Reactive Powder
Concrete) which has no aggregates.
in
Page 10 of 11
in
in the Red Sea High School, High School/Secondary Certificate Programs · (