- Develop monthly production plan depending on
Monthly forecast and orders.
- Work with the material planners MRP to ensure
material availability for planned Production.
- Develop material plan
- Study new orders according to free bath then check
material and if ok, proceed but if not ok, change date
to nearest delivery.
- Study CRs or new expected orders according to
material availability and free capacity.
- Update for plan data to insert new orders and
update orders situations
- Close monitoring for urgent orders with progress.
- Set Delivery Date for the orders
- M/C and Factory Evaluation and Utilization
- Monthly meeting with all supply chain functions for
the supply planning review
- M/C and Factory Evaluation and Utilization
- Create Job Orders
- OH cables Follow Up
- H.V Cables Follow Up
- M/C Daily plan and M/C Loading
- Monthly Capacity Plan
- Set Delivery Date for the orders
- Responsible For Wooden Drums for all the factory
- M/C and Factory Evaluation and Utilization
- Create Job Orders
- OH cables Follow Up
- H.V Cables Follow Up
- M/C Daily plan and M/C Loading
- Monthly Capacity Plan
- Set Delivery Date for the orders
- Responsible For Wooden Drums for all the factory
- Discuss the daily working Plan for Metal Section
with the Production manager.
- Making the Daily Production Program for Metal
Section.
- Converting the Job Orders to Production Card
(Contain all Technical Specifications).
- Responsible for all Drawing (7 M/Cs) And Stranding
(11 M/Cs) Machines.
- Responsible for 120 Labors, 2 Supervisors and 3
production engineers.
- Following the Daily program with Production
Engineers in Metal Section.
- Solving The Difficult Metal Section Problems that
can’t be solved by the Engineers. - Taking all urgent
Decision for the Metal Section.
- Make sure that all Metals Supervisors labors and
Engineers Following Production, Measurements,
Lean, Six Sigma, Safety and Healthy Instructions.
- Control the Holidays of Production Engineers in
metal Section.
- Making with planning department the Daily working
plan and Monthly Capacity Plan for Metal Section.
- Follow the Drums Specification with Planning
Department.
- Control the Copper And Aluminum Qty (Tonnage)
with Planning
- Manage the Daily Program prepared by Metals
Section head.
- Responsible for all Drawing (7 M/Cs) And Stranding
(11 M/Cs) Machines and following all job orders on
them.
- Responsible for 50 Labors and 2 Supervisors.
- Following the Supervisors to make sure of
Production data, Materials, and all Tools.
- Solving The Difficult Metal Section Problems that
can’t be solved by the supervisors.
- Make sure that all Metals Supervisors and labors
Following Production, Measurements, Lean, Six
Sigma, Safety and Healthy Instructions.
- Control the Holidays of labors and supervisors in
metal Section.
- Making the Preventive Maintenance Plan for all
Drawing and Stranding machines.
- Working in Shifts ( 1st, 2nd, Or 3rd Shift)