Survey Manager
PARSONS
Total years of experience :46 years, 1 Months
Consulting Management of King Abdullah Project for Mecca Development includes the following:
Managing Construction of Mecca 1st and 2nd Ring Roads & Managing Study and Design, design & Construction of 3rd and 4th Ring Roads.
Study & Design then Management of Construct North, East & South Axis Roads.
Study & Design then Management of Mecca Urban Nodes.
Set up & maintain Project File and Project Excel Status Sheet Entry.
Response of updating plans. Schedules and progress reports.
Takes day to day responsibility for execution of the project.
Coordinates with the Client, and Sub-Contractors.
Ensure the project is adequately resourced & Identify requirements.
Co-ordinates the efforts of all discipline engineers in the project.
Check and approve Topo. Survey Reports & Expropriations Forms.
Study the scope of works & prepare management plan.
Review the schedules and follow up work crews.
Check and approve surveys and design sheets.
Arrange work and verify the completion of crew's tasks.
Participate in follow up projects with clients.
Propose the methods to improve work performance.
Participate in business development assignment.
PROJECTS:
Makkah & Madinah Main & Secondary Roads (345 km), with Hizra Intersection in Madinah / Yanu' Highway (Study & Design Project).
Madinah Agriculture Roads (Group Twelve) for MOT (100 km), (supervision project).
Study & estimate Surveying & Roads Design projects.
Prepare schedules and plans for survey crews.
Supervise land survey crews and field verification tasks.
Check and approve Traverses and Leveling Networks.
Supervise roads design preparation
Initiate the Guidelines and Specifications of GPS Surveys.
Join Quality Assurance (QA) Team for evaluates the produced maps.
Supervise the task of verify and updating maps.
Achieve the map production Quality Control (QC) surveys.
Coordinate and supervise the topographic surveys.
Implement policies, instructions and standards.
Develop topographic survey schedules, and Prepare progress reports.
Review and approve all data prior to entry into the database.
Evaluate Topographic Team and prepare the performance review reports.
Participate in the preparation of the Master Facility Index and The Detailed Land Use and Infrastructure Report & the Master Planning Reports.
PROJECT:
Engineering Information Systems Project (EIS) is one of the superior projects aim to automate all facilities and utilities maintenance, as well as preparing the short term and long term master plan reports. It covers all Royal Saudi Air Force (RSAF) Air Bases whole Kingdom, as well as RSAF Headquarters.
Preparation and organization of Field Edit packages.
Identify and resolve any queries at any stage of map compilation.
Confirming classification of terrain outlines and roads.
Identifying obstructions to flight navigation.
Tasking field surveyors to record the map accuracy points.
Identifying missing fetters for reset and tasking surveyors.
Compiling resets list and producing master reset overlays.
Compiling field edit report for sheet acceptance.
Develops and implements training programs for Field Editors.
Plans, schedules and perform Geodetic Data Management Tasks.
Develops policies and procedures for data acquisition, verification, storage, and distribution.
Maintains databases, including development testing.
Plans and supervises Geodetic Marks Maintenance program.
Implements training programs in plane surveying.
Supervises production of station descriptions, geodetic data collection, and evaluation.
PROJECT:
Eagle Program was an extensive military mapping project, It was covering whole Saudi Arabia and international borders by 1:250, 000 scale maps (JOG maps), these are two versions Air and Ground maps for the purpose of Air force and Air defense. In addition of Topographical 1:25, 000 scale maps for King Khalid Military City (KKMC), Tabuk, and Bisha.
The project was covering whole kingdom by the first National GPS Geodetic Networks (Micro Geodetic, Fundamental, and First order Networks).
Establish, orient and density Geodetic Control Networks.
Approve the method of surveys, and information records.
Supervising Al-Baha Region Aerial Survey Project.
Determine the accuracy of layout features included in maps.
Check and approve the Geographical Names, English Transliteration.
Issue technical directions and instructions in Land Surveys.
Prepare timetables and work schedules for work stages and provide training.
PROJECTS:
Survey and Cadastral Department establish, orient and density Geodetic Networks by both GPS and conventional technique, and perform aerial survey projects. It is covering whole Kingdom’s towns and villages by 1:1000 scale, 1:10, 000 scale and 1:25, 000 scale topographic maps, as well as photo mosaic.
Manager of Municipal Infrastructure & Roads construction Project, that includes remove demolished buildings, Implement storm, water & sewage networks, Extend Electric, Telephone & Lightening Networks, as well as Roads and Footpaths construction.
SHELL WINNING Exploration Networks, Western Desert, Egypt.
Training: Microsoft Office Programs AutoCad Program Land Development (Civil Design & Surveying) GPS Data Processing Ashtech, Trimble, Sokkia, Topcon (Javad) & Adjustment / GeoLab, TrimNet, StarNet Programs. Informix Data Base, UNIX Version Analytical Photogrammetry Digital Mapping Cartography