wireless integration professional
alcatel-lucent
مجموع سنوات الخبرة :7 years, 1 أشهر
integration team for mobinil-egypt project
omc-r admin
delete, create, parameter change, capacity add.
new feature activation (GPoIP, HSL)
sites migration
TPM team for Etisalat UAE project
B11-B12 SW replacement
BSS SW migration MX-MFS & BSCs.
new site integration
swap project
new features activation (LBoIP, AUPoIP, ASigoIP)
BSS SW migration team for orange-mali
B11-B11 SW replacement
SW migration for 3 MFS & 27 BSCs
Configuration Management via OMC-R
OMC-r & NPO trouble shooting
BSS SW migration
BSS SW migration
Configuration Management via OMC-R
BSS SW migration
Configuration Management via OMC-R
2G/3G dimensioning.
GSM, GPRS & 3G dimensioning.
BSS/RNC dimensioning.
Interface dimensioning.
BSS hardware dimensioning.
Trouble shooting OMC-R problems for B11
BSS/PDH & NMS technical support.
give more than 30 training sessions on 2G network & BSS HW.
Give 3 sessions on BSS Preventive maintenance.
technical support for BSS HW.
implementing new PDH NMS network
technical support for NMS project.
BSS roll out engineer
working for 2 months in QA team
commissioning for all BSS & PDH HW.
Technical support in DSL department
Graduation Project: study of wireless communication systems & antenna design & implementation (studying of the GPS system). Project Grade: Excellent. Research on The Spread Spectrum. Designing of a front end of AM receiver system. Design of a digital ciruit using VHDL. Cellular system design for a Mobile Network. Design of a Frequency Meter using micro-controller ( PIC-16F84A ) Analysis & Implementation of a differential input amplifier.