Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
mohamed alsersy, Pipeline & Processes Senior Field Engineer

mohamed alsersy

Pipeline & Processes Senior Field Engineer·SAKNAFTA EGYPT Petroleum Services Co.

Egypt

Master's degree, Business

Work experience

Total years of experience: 19 years, 7 months

Pipeline & Processes Senior Field Engineer

June 2011 - Present

SAKNAFTA EGYPT Petroleum Services Co.

Cairo, Egypt

June 2011 - Present

 Performing pipeline & process facilities services like Pumping, Nitrogen services, pigging, drying, hydrostatic test, leak test, oil flushing, chemical cleaning and flanges management.
 Performing Nitrogen service as N2 unit operator.
 Select rotary equipment (pumps and compressors), generators, Nitrogen equipment, valves, special pipe pieces and tools suitable to job requirements.
 Reviewing tender's documents and P&IDs.
 Visiting sites to complete missing data.
 Preparing specifications for the required equipment.
 Preparing technical proposals and job procedures according to tender's specifications and job requirements.
 Preparing all technical data and providing technical support for operation team.
 Participation in companies' registration and audits preparation steps.
Main Projects
 United Gas Derivatives Co. (UGDC) - Complete NGL Plant Shut Down
Performing Nitrogen purge, mechanical services, pressure test and leak test for processes facilities (plant boundaries, mol. sieve dryers, dried gas filters, mercury removal vessel, expander feed separator, gas/liquid cold box, demethanizer, demethanizer reboiler, depropanizer, depropanizer reboiler, NGL surge drum and cold hydrocarbon drains drum) existing at UGDC natural gas liquids (NGL) plant during shut down.
 ESTYRENICS - Polystyrene Production Plant Pre-commissioning
Performing pre-commissioning activities like drying, pneumatic gross leak test (GLT), commissioning leak test (CLT), vacuum leak test (VLT), Nitrogen purge and retro-jetting for the processes facilities and piping systems existing at polystyrene production plant.
 PETROBEL - New Land Oil Treatment Train Pre-commissioning
Performing pre-commissioning activities like pneumatic gross leak test (GLT), commissioning leak test (CLT) and Nitrogen purge for the crude oil processing facilities (three phase separator, crude oil heat exchangers, land oil train gas boot, thermal oil expansion vessel, thermal oil sump), tanks, fuel system, piping and suction & discharge piping of crude oil transfer pumps & thermal oil circulation pumps existing in the new land oil treatment train.
 PETRODARA - OIL PRODUCTION COMPANY at RAS GHAREB EASTERN DESERT
Injecting water to the wells using injection fluid pump
 BAPETCO - BADR 3 Gas Plant Shut Down
Performing Nitrogen pumping to plant facilities during shut down
 BAPETCO - EL-OBAYED Gas Plant Shut Down
Performing Nitrogen pumping to plant facilities during shut down.
 PETROBEL - DENISE-B Development Project - Offshore Deep Water new
(DENISE 4 / TUNA) Pipeline Commissioning
Performing dewatering, drying and nitrogen purging for (16”/ 6.5km) subsea pipeline.
 BAPETCO - NEAG 1
Crude Oil Pumping using Triplex Pumps
 KHARAFI NATIONAL - EGYPT - KN West DAMIATTA Project
Pre-Commissioning Activities of Underground piping for Fuel gas System
 PETROSILAH - ELFAYOUM Plant
Cleaning using Coiled Tubing for totally plugged pipeline
 HASSAN ALAM HOLDING - AIN SUKHNA Plant
Air Blowing Activities and Nitrogen Pressure Test for Process Lines
 PETROBEL - New Land Oil Treatment Plant ABO-REDIES
Pre-Commissioning Services for New Land Oil Treatment Train
 UNITED GAS DERIVATIVES COMPANY - UGDC Damietta Export Facilities
Pre-Commissioning for the New Extension of Damietta Project
 Khalda Petroleum Co. (KPC) - AKIK Gas Plant Commissioning Project - Gas/Glycol Contactor Chemical Cleaning
Performing chemical cleaning to remove 20% hydrocarbons scale and 80% heavy iron oxide scale from gas/glycol contactor tower existing at KPC AKIK gas plant.
 GUPCO - Ramadan 6 (Rehabitation Project)
Performing pre-commissioning activities like pneumatic gross leak test (GLT), commissioning leak test (CLT) and Nitrogen purge.
 BAPETCO - Assil & Karam Project
Performing Flange management, Air blowing, Air flushing, Performing pre-commissioning activities like pneumatic gross leak test (GLT), commissioning leak test (CLT) and Nitrogen purge.

Company industry:
Oil & Gas
Job role:
Engineering

Field Engineer

June 2008 - March 2011

Intelligent Life Co

Cairo, Egypt

June 2008 - March 2011

Position held: Field Engineer
Intelligent Life Co, June 2008 - March 2011.
Company background: Specialized in building management and control systems including: o Networking (both wireless and wired systems)
o Buildings security systems (access controls, alarms, fire and gas systems, motion sensors, CCTVs)
o Automating gates, windows, curtains etc
o Integrating all devices (individual controllers, air conditioners, recorders, etc) through one control and monitoring interface.

Position held: Project Manager (Sales and Installation), responsible for: o Finding and contacting clients.
o Selling the products.
o Drawing AUTOCAD designs.
o Install the products and following up with clients.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Project Manager (Sales and Installation)

August 2007 - June 2008

Mansour Electronics & Technologies

Cairo, Egypt

August 2007 - June 2008

Mansour Electronics & Technologies (Bang & Olufsen), August 2007 - June 2008.

Company background: Specialized in building management and control systems.

Position held: Project Manager (Sales and Installation), responsible for: o Finding and contacting clients.
o Selling the products.
o Drawing AUTOCAD designs.
o Install the products and following up with clients.


SUMMER INTERNSHIPS

Company industry:
Entertainment
Job role:
Engineering

Trainee

August 2005 - September 2005

Future Communication Company

Bahrain

August 2005 - September 2005

Trainee, Future Communication Company (FCC), Kuwait, Information Technology team, August - September 2005.

Company industry:
Telecommunications
Job role:
Engineering

Trainee

June 2004 - September 2004

show time

Cairo, Egypt

June 2004 - September 2004

Trainee, Show time, Sales, June - September 2004.

Company industry:
Telecommunications
Job role:
Engineering

Trainee, Up to date computer, Sales and Maintenance

June 2003 - September 2003

up to date

Cairo, Egypt

June 2003 - September 2003

Trainee, Up to date computer, Sales and Maintenance, June - September 2003.

Company industry:
Entertainment
Job role:
Maintenance, Repair, and Technician

Education

Edinburgh School of Business for Heriot-Watt University

February 2015

February 2015

Master's degree, Business

Egypt

Enrolled in Master of Business Administration (MBA): Edinburgh School of Business for Heriot-Watt University (Self Study)

Arab Academy for Science and Technology and Maritime Transport

September 2007

September 2007

Bachelor's degree, Electronics Engineering

Egypt

Bachelor of Science, Arab Academy for Science and Technology and Maritime Transport (AAST), Cairo, Egypt, fall 2007. • Major: Communication and Electronics Engineering. • Graduation Project: DESIGN AND IMPLEMENTATION OF SECURE CDMA MOBILE SYSTEM FOR END TO END COMMUNICATION. o The project is focused on the design and implementation of a proposed new stream cipher algorithm on FPGA to be used for securing the mobile communication. o The algorithm was software implemented to assure its functionality and also, testing its statistical parameters. o The algorithm was used to encrypt and decrypt files on PC and the used high level language was Borland C++ Ver. 5. o The hardware design is divided into two parts the encryption algorithm and the algorithm controller. o The Xilinx Intellectual Property (IP) PicoBlaze Controller is used to synchronize the computer serial port with the serial port of FPGA. o The whole design was hardware implemented and it is tested using RS232 through sending and receiving files on computer to be encrypted and decrypted. o Design, simulation, downloading, testing and verification were done using the software of Xilinx ISE Ver. 8.2i. o Finally, the implemented circuit is ready to be used for the mobile communications security.

Saint George's College

January 2000

January 2000

High school or equivalent,

Egypt

• Thanaweya Amma, Science Section, Saint George's College, Cairo, Egypt, 2000.

Skills

Installation
Expert
Installation
Expert
Commissioning
Expert
Commissioning
Expert
Science
Expert
Science
Expert
Testing
Expert
Testing
Expert
Mobile
Expert
Mobile
Expert
ACCESS
Expert
ACCESS
Expert
AUTOCAD
Expert
AUTOCAD
Expert
CLIENTS
Expert
CLIENTS
Expert
CONTROL SYSTEMS
Expert
CONTROL SYSTEMS
Expert
DRAWING
Expert
DRAWING
Expert
ENGINEER
Expert
ENGINEER
Expert
FIELD ENGINEER
Expert
FIELD ENGINEER
Expert
PROJECT MANAGER
Expert
PROJECT MANAGER
Expert
SALES
Expert
SALES
Expert
SECURITY
Expert
SECURITY
Expert
Installation
Expert
Installation
Expert
Commissioning
Expert
Commissioning
Expert
Science
Expert
Science
Expert
Testing
Expert
Testing
Expert
Mobile
Expert
Mobile
Expert

Languages

Arabic

Expert

English

Expert

French

Expert

Memberships

Tae Kwon Do Team, Al Zohour Club, Cairo

Member

Water Polo Team, Al Zohour Club, Cairo

Member

January 2000

AAST Tae Kwon Do team

Member