Lead Telecom Engineer
Bechtel Corporation
Total des années d'expérience :16 years, 2 Mois
Working as a PMC consultant. handling 26 major royal commission project. technically and engineering
Security upgrade project for the Abqaiq Oil and Gas plant, All GOSP plant, Uthmaniyah Plant, Shedgum plant.
System : Telecommunication ISP & OSP, Public Address System, CCTV, Modular Data Center, Audio and Visual System, Video Wall, Video Projection System, Content Creative solution, Video Mapping System, Network Security System, Video presentation System,
Product : Huawei DataCenter and GPON, ZeeVee Encoder and Decoder, 7Th Sense Video Mapping, LG Video Wall, Panasonic Conference theatre Solution, PaloAlto Cyber Security, Pufferfish Spherical Display, Content Creative solution, Biamp Audio System, K array linear Speaker.
1. Audio Visual System
2. Modular DataCenter Facilities
3. OSP Optical & Copper Cabling Infrastructure.
4. Digital Sigange System ( Video Wall and Conference Theatre Solution)
5. ISP Optical & Copper, SCS Cabling Infrastructure.
6. FTTH, FTTB, FTTA, FTTx, PON, GPON Optical Networks.
7. PLC and SCADA System
7. SCS, Floor plans, conduits, cable trays & ladders, data outlets, work reas,
grounding for both backbone, floor distribution, TRs and TERs calculations.
8. WLAN, IPT, VOIP, PAGA, IPPS, EVAC, IPTV, MATV, PA etc;
9. Low Current & ELV Systems.
10. Bandwidth consumption, channel loss, system fidelity, link length,
power budget, CCTV FOV, NVR storage, link loss budget, data rates
calculations.
11. Server/ Storage solutions and Cyber Security Solution.
12. Unified Communications.
13. HCIS, TIA, EIA, ANSI, SA Standards, CITC, SASO compliance.
14. IDAS & ANPR system.
• Project Technical Adviser
• Responsible for Low Current System project
• Attend meetings with clients(minutes of meeting, kick off meeting)
• Responsible for Aramco standards and Document Submittal.
• Responsible for Cost Controller
• Responsible for Prepartion of Method of stsement and ITP & Checklist.
• Responsible for Project management.
• Responsible for Project execution.
• Responsible for Technical Query, Red Mark Diagram,
• Review Plans and Drawings in accordance with specification, code and standars.
• As per International and Saudi Aramco standard, specification, as per approved project drawings supervised, Telecommunication Duct bank, Cable pulling as per SAES Telecom standard Inside plant and Out side plant.
• Involved in SAT ( Site Accpectence Test) activities.
• Prepared punch list for the activites carried out by construction group.
• To verify the latest revision of the issued for Construction drawings as per the engineering drawing register.
• Verify the controlled copy of the latest project specification, approval of the inspection & ITP, quality control Procedure etc. prior to start up of the work.
• Termination and installation of cable and conduit.
• Red lined / as built project Construction drawings.
• Red lined / as built vendor equipment drawings.
• The activity include construction of Oil and Gas sector & Submission of final Dossier for the project.
• Execution as per standard and specification.
• Execution of Telecom site activities:
Cable trays, Junction Boxes, Conduit, Control panel, Termination, Duct Bank, inner duct, pedestal, Cabinet, switches, routers.
• Responsible for Civil work activities like Duct bank and Sub duct and Manhole and Handhole.
Integrated security systems solution using
* IP-CCTV.
* Security Access Control System
* Fire Alarm System.
* Attendance system
* Gps tracking system
* Designing and Engineering
* Project Study
* Project Supervision
* Site Survey
* Project Costing and implementation ( RFI, RFQ, BOQ & Project Tender)
* Technical Support
* AutoCAD Drawings, Project Presentation and Training to Customer.
* Installation, Programming, Testing & Commissioning.
* Maintenance
Projects Executed:
A. King Abdulaziz city for science and technology
System: Access control and barrier gates and Telecommunication
Role: Installation, Programming and Commissioning
Product: Electronia, Came
B. Riyadh Municipality
System: GPS Vehicle Tracking System
Role: Installation, Programming, Testing and Commissioning
Product: Electronia
C. Maaden (Ras al khair)
System: Access control system, turnstile gates
Role: Designing, Installation, Programming, and Commissioning
Product: Electronia, Alvardo gates..
D. Ministry of Defence - Riyadh
System: Access control ad CCTV system
Role: Designing, Installation, Programming, Testing, Commissioning and
Project Supervision.
Product: Axis Cameras, HP Severs, Workstations and Central
Storage Cisco Switches and electronia reader and software.
3.System of Strategic Business Solution, Alkhobar
Responsible and accountable for the coordinated management of vehicle tracking related projects directed toward strategic business and other organizational objectives
Managed client engagement services and solution implementations.
Manage transition of client from Solutions Implementation to Client Suppor
Manage the development and maintenance of technical portions of project.
Responsible for configure the device vehicle tracker
Energy Management & Telecommunication Project
Energy management is the process of monitoring, controlling, and conserving energy in a
building or organization.
Responsibility:
* Responsible for awareness of the energy waste.
* Responsible for metering the energy consumption and collecting the data.
* Responsible for site survey.
* Responsible for tackling the routine waste and replacing or upgrading the
inefficient equipment.
* Responsible for Fiber optic cable pulling.
* Responsible for FOC and Network cables termination.
* Installation and configuration of switches and routers.
* Installation of cabinet and face plate.
* Responsible for structured cabling.
Electronics and Communication Engineering