- Managing, monitoring and supervising construction of sanitary and drainage projects including sewerage networks, pressure mains, pumping stations and WWTPs
- Liaise and coordinate activities with the Program implementing entities, contractors and other third parties
- Tendering for works, goods in accordance with applicable guidelines
- Follow up the program construction/ procurement plan and OHS plan
- Training of technical fields of execution for sewerage network construction
Design for Infrastructure and Utilities of MASAR Project (KAAR)
Maintaining a good understanding of the background of the client’s business, the project scope, and the various stakeholder’s relationships and requirements.
Carrying out necessary coordination with the various project stakeholders, interfaces, and relevant authorities.
Conducting necessary revisions and validate the wet utilities preliminary designs.
Establish adequate coordination and communication channels with all involved parties
Developing detailed designs and construction methods necessary for the wet utilities’ necessary diversions.
Liaising and following up with utilities authorities for design review and approval at various stages of the design.
Coordination with the PM and assisting the design management team in fulfilling the project’s infrastructure scope.
Applying of value engineering to optimize the wet utilities diversions cost.
Continuous follow up with Authorities to ensure rapid closure.
King Abdullah Project for Development of Makkah (23 billion SR.)
Provide technical support for the Client throughout the project regarding the utilities
Coordinate and liaise with utility agencies and all involved parties
Managing interfaces with other projects / designers
Arrange and conduct utilities coordination meetings
Provide plans and defined methods for contractors how to deal with existing & proposed utilities within the project area
Follow-up the supervisory consultants and contractors for dealing with utilities
Participate in preparing tender package (drawings, specification, evaluation, and clarification regarding the utilities) for new projects (axial roads & BRT).
Monitor and report on progress of scheduled utility relocation work
Review and response utilities correspondences
Prepare a monthly follow-up utilities report and provide support for the preparation of other required monthly reports
Conduct technical study for the possibility of using Common Services Tunnels in Makah
Performs any related duties as assigned by TL.
Agra Water Supply Project (24, 822 billion JPY)
Administering and coordinating project activities in support of project development goals in terms of quality, budget, and program.
Working with the
Projects Manager - Transmission (Water)
DEWA Projects:
CW/041/96 - Installation of Dist Pipeline (215 Km) and service Pipe (L.D.P.E.) at various locations in Dubai.
CW/006/96 - Installation of Dist. Pipeline (205 Km) and Service Pipes (L.D.P.E.) at various locations in Dubai.
CW/113/98 - Installation of Dist. Pipeline (218 Km) and Service Pipes (L.D.P.E.) at various locations in Dubai.
CW/085/99 - Development Water Dist. Network for Government Housing Units At Hatta Central Area (6 Km).
CW/074/2000 - Installation of Dist. Pipeline (200Km) and Service Pipes at various Locations in Dubai.
CW/351/2000 - Installation of Dist. Pipeline (162 Km) and Service Pipes (L.D.P.E.) at various locations in Dubai.
CW/320/98 - Construction of purification Plant, Storage Reservoir, Pumping Station & Distribution Network in Hatta.
CW/175/2001 - SCADA System for water network & Associate Civil and Electro - Mechanical Works.
CW/225/2002 - Installation of Dist. Pipeline (300 km) and service Pipes (L.D P.E) at various locations in Dubai.
CW/296/2004 - Supply, Installation & Commissioning Of 1200 Fiber Cement Pipelines And Associated Works Along Al Khail Road, 900mm &600mm Pipelines Along Al Sofouh Road, Along The Lateral Road With Emirate Hills And Within Al Barsha South.
CW/062/2005 - Supply, Installation & Commissioning Of 1200 MMDiaTransmission - Main From Alain Road To Almadam R/A.
CW/035/2005 -Supply, Installation & Commissioning Of 900 MMDia Transmission - Main From Almadam R/A To Hatta.
Activities:
Approve, Supervise & inspect all the transmission pipelines related works for major (Road, Drainage, Irrigation & Storm) Projects i.e. diversions/ protection for different clients (governmental or private sectors) for their projects such as RTA, D.M, EMAAR, NAKHEEL, LIMITLESS, TECOM etc.
Overall Supervision of water transmission pipeline projects to ensure proper implementation of the contracts.
Review Design specifications of water pipeline projects.
Participate in preparing tender specification, evaluation, and clarification.
Liaising with other service authorities, consultants, contractors, for running projects and future projects.
Designing the pipeline network, valve chambers, thrust blocks and modifying according to the site situation with effective flow control and pressure in the network.
Coordinating with other service authorities for NOC and attending meetings for the same.
Follow - up of site activities from route survey, trial pits, excavation, pipe lying, and deferent tests and up to final reinstatement of the route.
Attend monthly progress meetings, weekly site meeting and submit weekly reports on site activities
Follow - up of commissioning activities.
Designing the diversion of the existing pipeline because of new planning keeping in view the future requirement.
Listing and checking of outstanding items with estimates of retentions.
Control project coasts within budget funds.
Ensure timely project completion.
Advise on & review of project close out report at end of project.
Activities:
Supervise the running projects (high rise buildings) with the planned schedules and controlling the cost of the project
Deploying resources and manpower according to the requirement of the project and maintaining steady pace of the project up to completion.
Coordinating with the engineers for associated works like firefighting systems, plumbing, and water supply, electrical network etc.
Preparing daily, weekly, monthly progress reports and controlling the flow of material for different projects.
(on partnership basis)
Activities:
Pricing for the new tenders
Project administration, Manpower and equipment’s management.
Cost accounting & control.
Planning and scheduling the running projects.
Preparation and checking of shop drawings and controlling cost through effective planning methods
Maintaining progress of the ongoing projects and preparing evaluations and final invoices for the completed projects.
Projects:
Maadi Towers (Cairo)
Borivage building, Louran - Alex.
Syria street towers, Roshdy - Alex.
Mostafa Kamel towers, Alex.
Group of villas & buildings at al Agamy-Alex
Activities:
Supervising the construction of high - rise buildings (concrete skeleton works)
Approval of the structural shop drawings
Site inspections for structural& architectural works
Supervise and coordinate the execution from proposal study stage to client delivery
Supervise and direct the activities of junior project representatives and construction inspectors, testing services and subcontractors.
Activities:
Checking the alignment and setting out of the road works.
Supervision of all site activities from route survey, trial pits, excavation, and deferent tests and up to final completion of road construction.
Supervising and attending the samples and test results for different phases.
Calculate the quantity of civil works executed (cut & fill, rock cutting, subbase, asphalt and curb and all related items of work)
•Other relevant information (e.g., Publications) N/A
,