Third engineer
Alexandria Water Company
Total des années d'expérience :13 years, 3 Mois
Job Description:
1- 1- Supervising the maintenance of all mechanical equipment (pumps, pipe lines, valves, tanks and compressors) for water treatment plant and mechanical installations.
2- Supervising the mechanical installation of new additional pumps, pipe lines, valves, tanks and any new fire fighting line in water stations including testing, commissioning and operation.
3- Holding Installation, Operation and Maintenance of two units of the GA75P Oil-Free compressor unit of Atlas Copco including the (DDp(+) and PDp(+)) dry dust filters, Air dryers and Air receivers.
Project : mechanical installations for new extensions of steel factory
in ‘Adabya highway’ owned by Suez Steel CO. designed by
''DANIELI''.
The installations included:
- Piping systems,
- Plumbing systems,
- Fire fighting system,
- HVAC with chiller system.
Job Description:
- Preparing case studies for mechanical equipments related to Construction
and Industry. Review and approve design drawings, technical submittals,
and offers submitted designers.
- To find solutions to the conflict between the site and drawings designed.
- Making final drawings for the work carried out (as-built).
passed