Mohamed Fekry, Construction Project Manager

Mohamed Fekry

Construction Project Manager

Project Build Co.

Lieu
Arabie Saoudite - Dammam
Éducation
Baccalauréat, civil engineering
Expérience
24 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 11 Mois

Construction Project Manager à Project Build Co.
  • Arabie Saoudite - Dammam
  • Je travaille ici depuis mars 2018

Project: Construction of Mouwasat Hospital Extension in Dammam (LTC)
Position: Project manager
Owner: Mouwasat Medical Service (MMS)
Consultant: Afniah Consultants
Project area: over 43 000 m2 (2 basements, ground & 6 floors)
Project budget: 180 millions SAR

Responsibilities:
- Integration all the in house and outsourcing works.
- Lead and manage all the execution work in the site
- Monitoring and controlling the work progress as per the approved schedules baseline.
- Reporting to the head office and relative stakeholders weekly and monthly.
- Manage the project cash in and out as per the budget and the schedule baseline.
- Manage and report all the meetings with all the project stakeholders.
- Ensure approval for the work shop drawing by the consultant as per the schedule baseline.
- Ensure approval for the material submittals by the consultant as per the schedule baseline and the project specs.
- Full responsibility for the project and deliverables quality.
- Monitoring and controlling the project risks as per the risk management plan

Operation manager à MADAEN star group (‘Projestar co. The contracting branch of the group)
  • Arabie Saoudite - Riyad
  • octobre 2015 à mars 2018

To decide and assign the needed staff for each project as per work requirements.
•To follow and control the work progress in the current projects and find the methods to increase the productivity to match the planned schedules.
•Review and final approval for the invoices from the current projects.
•To approve the needed subcontractors and review their contracts before start.
•Attending the meetings with owners and subcontractors frequently for the current projects and follow the achieved points for the next meetings with the site crew.
•Advising and support the technical office through studding the new projects.
•As a part of the department responsibility is to manage, control and follow the fire maintenance subcontractors for all MADAEN star properties.
The current Projects through this period:
•Renovation of the JAW mall in Al KHARJ city over 40000 m2 after a big fire incident.
•Complete construction of the JAW mall extension over 10000 m2.

Project manager à Projestar Co.
  • Arabie Saoudite - Riyad
  • mai 2012 à octobre 2015

construction and finishing works for 3 palaces in El FORSAN compound
Owner: NEHAZE investments
Project area: over 5 000 m2 / palace (including landscape)
Project budget: 20 million / palace
Responsibilities:
- Complete responsibility for all the site (workers, subcontractors, approval for all the deliveries and handing over of all the project phases )
- Preparation for all the sites requests (subcontractors, materials, workers and contracts).
- Monitoring and controlling the work progress and matching with the planned schedules.
- Reporting to the head office daily, weekly and monthly.
- Preparing invoices for the owner and reviewing and approving for the subcontractor’s ones.
- Attend and report all the meetings with all the project stakeholders.
- Review and final approval for the work shop drawing after matching with design drawings and site conditions.
- Evaluating all the staff work in the site yearly.

Project manager à Projestar Co.
  • Arabie Saoudite - Riyad
  • septembre 2011 à avril 2012

finishing work for MADAEN star group head office in El RABWA Plaza building
Owner: MADAEN star group
Project area: over 5 000 m2
Project budget: 8 million
Responsibilities:
- Complete responsibility for all the site (workers, subcontractors, approval for all the deliveries and handing over of all the project phases )
- Preparation for all the sites requests (subcontractors, materials, workers and contracts).
- Monitoring and controlling the work progress and matching with the planned schedules.
- Reporting to the head office daily, weekly and monthly.
- Preparing invoices for the owner and reviewing and approving for the subcontractor’s ones.
- Attend and report all the meetings with all the project stakeholders.
- Review and final approval for the work shop drawing after matching with design drawings and site conditions.
- Evaluating all the staff work in the site yearly.

Project manager à Projestar Co.
  • Arabie Saoudite - AlKharj
  • août 2010 à juillet 2011

construction of ROWSHEN market in EL KHARJ city
Owner: MADAEN star real state (branch of MADAEN star group)
Project area: over 32 000 m2 (including land scape)
Project budget: 30 million
Responsibilities:
- Complete responsibility for all the site (workers, subcontractors, approval for all the deliveries and handing over of all the project phases )
- Preparation for all the sites requests (subcontractors, materials, workers and contracts).
- Monitoring and controlling the work progress and matching with the planned schedules.
- Reporting to the head office daily, weekly and monthly.
- Preparing invoices for the owner and reviewing and approving for the subcontractor’s ones.
- Attend and report all the meetings with all the project stakeholders.
- Review and final approval for the work shop drawing after matching with design drawings and site conditions.
- Evaluating all the staff work in the site yearly.

Project manager à Projestar Co.
  • Arabie Saoudite - Riyad
  • octobre 2009 à juillet 2010

construction of reception & offices building of El FORSAN compound (precast buildings)
Owner: NEHAZE investments
Project area: over 6 000 m2
Project budget: 10 million
Responsibilities:
- Complete responsibility for all the site (workers, subcontractors, approval for all the deliveries and handing over of all the project phases )
- Preparation for all the sites requests (subcontractors, materials, workers and contracts).
- Monitoring and controlling the work progress and matching with the planned schedules.
- Reporting to the head office daily, weekly and monthly.
- Preparing invoices for the owner and reviewing and approving for the subcontractor’s ones.
- Attend and report all the meetings with all the project stakeholders.
- Review and final approval for the work shop drawing after matching with design drawings and site conditions.
- Evaluating all the staff work in the site yearly.

Project manager à projestar Co.
  • Arabie Saoudite - Riyad
  • janvier 2008 à août 2009

construction of RABWA Plaza including TAMIMI marke (precast buildings)
Owner: MADAEN star real state (branch of MADAEN star group)
Project area: over 16 000 m2
Project budget: 60 million
Responsibilities:
- Complete responsibility for all the site (workers, subcontractors, approval for all the deliveries and handing over of all the project phases )
- Preparation for all the sites requests (subcontractors, materials, workers and contracts).
- Monitoring and controlling the work progress and matching with the planned schedules.
- Reporting to the head office daily, weekly and monthly.
- Preparing invoices for the owner and reviewing and approving for the subcontractor’s ones.
- Attend and report all the meetings with all the project stakeholders.
- Review and final approval for the work shop drawing after matching with design drawings and site conditions.
- Evaluating all the staff work in the site yearly.

project manager à EL HABASHI general contracting - Cairo
  • Egypte - Le Caire
  • janvier 2006 à juin 2007

construction of the central store of TRAVCO group - in ABO RAWASH and 60 ton concrete bridge with 300 m length in front of the head office in EL SHIEKH ZAID city
Owner: TRAVCO group - Egypt

project manager à EL HABASHI general contracting
  • Egypte - Le Caire
  • août 2004 à février 2005

construction of warehouses accommodation warehouses for TAV (Turkish international co.) the main contractor of terminal 3 in Cairo airport
Owner: TAV Cairo (international Turkish co.)

assistance site manager à EL HABASHI general contracting
  • Algérie - Alger
  • mai 2002 à mars 2004

the complete renovation of the German embassy and the residence in Alger - Algeria
Owner: German Foreign ministry - German embassy in Alger

assistance site manager à EL HABASHI general contracting
  • Egypte - Le Caire
  • octobre 2001 à avril 2002

construction of Air craft magazine in ALMAZA air base (space truss over 16000 m2)
Owner: Egyptian armed forces - Air forces

Project manager à EL HABASHI general contracting
  • Egypte - Le Caire
  • janvier 2000 à juillet 2001

construction of residential villas in 10th of Ramadan city (2 villas, swimming pool & health club)
Owner: Mohamed Asoufi Ramadan

assistance site manager à EL HABASHI general contracting
  • Egypte - Louxor
  • août 1998 à décembre 1999

Renovation of BELLDONNA hotel in Luxor
Owner: Club Med. Corporate & Finance - France

Site engineer à EL HABASHI general contracting
  • Egypte - Le Caire
  • mars 1997 à mars 1998

Renovation of EL MANESTERLY palace in Cairo
Owner: Ministry of culture in Egypt

Éducation

Baccalauréat, civil engineering
  • à Ain Shams university
  • mai 1995

Done a project and research on the effect of the fire on the reinforced concrete and methods of repair (degree excellent)

Baccalauréat, الهندسة المدنية
  • à جامعة عين شمس
  • mai 1995

تقدير تراكمي جيد جدا مع مرتبة الشرف المشروع مقاومة المنشأت للحريق و طرق الاصلاح تقدير ممتاز

Specialties & Skills

Site Plans
Leading People
Controllers
Department Budgeting
Structural Design Engineering
BUDGETING
CONTRACT MANAGEMENT
ENGINEERING
MATERIALS MANAGEMENT
MEETING FACILITATION
MICROSOFT OFFICE
PROGRESS

Langues

Anglais
Expert

Adhésions

الهيئة السعودية للمهندسين
  • عضو
  • March 2012
نقابة المهندسين المصريين
  • عضو
  • May 1995

Formation et Diplômes

Project Management Professional (PMP) (Certificat)
Date de la formation:
March 2018
Valide jusqu'à:
March 2024
Planning and controlling projects using PRIMAVERA resource and cost analysis (Formation)
Institut de formation:
EPM consultancy - EGYPT
Date de la formation:
July 2007
Durée:
20 heures
Planning and controlling projects using PRIMAVERA planning and scheduling (Formation)
Institut de formation:
EPM consultancy - EGYPT
Date de la formation:
June 2007
Durée:
20 heures
الكود المصري للخرسانة المسلحة (Formation)
Institut de formation:
مركز بحوث الاسكان و البناء
Date de la formation:
October 1997
Durée:
10 heures
PSDP training course for quality managers (Formation)
Institut de formation:
Euro-Mediterranean partnership - Eygpt
Date de la formation:
November 1998
Durée:
18 heures