Project Manager MEP
NMG
Total years of experience :14 years, 7 Months
Design, implement, Supervise & maintenance of MEP Systems
Electrical systems (Lighting, power, UPS, generators, transformers & SW. Gears)
Low current Systems (Fire alarm, Nurse call, public address, CCTV, MATV, BMS, Data systems & Telephones )
Mechanical Systems (AC, Chilled water, Fire fighting, Drainage, water supply )
ADMIN. COURT PROJECT MEP MANAGER
HANDELING ALL MEP WORKS
made shop drawings and design electrical systems
I work as site and technical office Engineer In the following projects.
1- College of Art & Science for Boys Najran University
2- College of Art & Science for Girls Najran University
3- College of Law for Girls Najran University
4- College of Pharmacy For Girls Najran University
5- (3)Schools for Boys Najran University
6- (3)Schools for Girls Najran University
7- Operation & Maintenance Work Shop Najran University
8- Operation & Maintenance Building Prince Salman University
I work in electrical installation for Al Shams Agro Group For Concentrates and juice from 15/11/2012 to 1/6/2014.
-Managing fresh graduate engineers and technicians
I work in electrical installation for Halayeb Company for dairy products and juice in new Damietta since 1/11/2009 to 30/10/2012 in following areas: • Design, implementation and maintenance for power and control panels and PLC panels by using Siemens S5-95 and S7-200 type. • Designed control panels for ventilation system, cooling and Freezers system by using general control (relays, timers and other control devices). • Designed control panel for bactofuge system by using PLC Siemens S5-95 and programming the PLC and connect the all wiring and connect air tubes for all solenoid valves and use RTD, level sensor, flow meter, pressure sensor and PID system. • Designed and programmed Siemens S7-200 control panels for Pasteurizers, ultra filtration unit, Soft and hard cheese production lines, Carbonated and anon carbonated juice production line. • Maintenance of electrical forklifts, elevators and packing machines (Lekkerkerker, Tetra Pack). • Change PLC and programmed it for TetraPack tray and CIP machines