Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Mohamed Ibrahim, Mechanical Piping Engineer

Mohamed Ibrahim

Mechanical Piping Engineer·TARGET Engineering Construction Company L.L.C

United Arab Emirates

Bachelor's degree, Mechanical Engineering

Work experience

Total years of experience: 13 years, 1 months

Mechanical Piping Engineer

August 2022 - Present

TARGET Engineering Construction Company L.L.C

Abu Dhabi, United Arab Emirates

August 2022 - Present

Company industry:
Oil & Gas
Job role:
Engineering

Piping Design Engineer

October 2021 - July 2022

Durrat Amjad General Trading Co., W.L.L

Al Zour Mina Saud, Kuwait

October 2021 - July 2022

Company industry:
Oil & Gas
Job role:
Engineering

Piping Supervisor

December 2019 - October 2021

Tecnicas Reunidas S.A

Muscat, Oman

December 2019 - October 2021

• Plan and coordinate with the subcontractor discipline supervisor/foreman the day-to-day activities ensuring the feasibility of the execution plan as per the project schedule and milestones.
• Prepare daily reports of work progress and ensure that the production is properly reported to the planning department (daily basis) to assure the reliability and readiness of the progress declared by the subcontractor with the corresponding clarification of the discrepancies.
• Carryout Material Take off from drawings whenever required.
• Responsible for fabrication and erection works that includes piping, structural and equipment
• Review of all Pipeline & Piping drawings including alignment sheets, GAD, Isometrics, Plot plan, Typical drawings, Crossing drawings
• Assist with the project planning, scheduling, manpower estimates.
• Preparation / review of construction and test Procedure, Risk assessments, Method statements etc.
• Execution of construction activities such as cold bending, pipe stringing, welding, NDT, coating, welder qualification, lying, back filling line with the section plans and construction schedule.
• Review content of construction drawings and procedures prior to issue, in order that construction execution is optimized in the most cost effective, safe and timely manner.
• Preparation of drawing revisions, FCN and as-built drawings
• Carryout Material Take off from drawings whenever required.

Company industry:
Oil & Gas
Job role:
Oil and Gas

Piping Engineer

December 2016 - December 2019

Técnicas Reunidas S.A

Al Zour Mina Saud, Kuwait

December 2016 - December 2019

• Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
• Coordinating with Engineering and Construction and liaise with the EPC partner on detail engineering requirements.
• Raising MTO(s) for all additional materials required for construction
• Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics
• Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
• Ensure that hydro test reinstatement is to be done as per procedure.
• Preparation of revision drawings for Piping Layout and Isometric drawings.
• Supervise the fabrication, erection activities of piping, storage tanks and steel structure.
• Detailing of piping and preparation/ review of shop drawings.
• Supervision of “As Built” drawing preparation
• Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
• Implement HSE procedure and ensure and Safe work practices and conduct safety stand downs at site.
• Schedules and supervises day-to-day site activities to ensure the proper utilization of manpower and equipment.
• Elaborates construction feasibility analysis evaluating the available materials & drawings
• Ensure that sub-contractor carry out construction in compliance with drawings and procedure.

Company industry:
Oil & Gas
Job role:
Mechanical Engineering

Piping Engineer

November 2015 - November 2016

Hyundai Heavy Industries Co., Ltd

Al Zour Mina Saud, Kuwait

November 2015 - November 2016

• Review content of construction drawings and procedures prior to issue, in order that construction execution is optimized in the most cost effective, safe and timely manner.
• Preparation of drawing revisions, FCN and as-built drawings
• Carryout Material Take off from drawings whenever required.
• Responsible for fabrication and erection works that includes piping, structural and equipment
• Review of all Pipeline & Piping drawings including alignment sheets, GAD, Isometrics, Plot plan, Typical drawings, Crossing drawings
• Assist with the project planning, scheduling, manpower estimates.
• Preparation / review of construction and test Procedure, Risk assessments, Method statements etc.
• Execution of construction activities such as cold bending, pipe stringing, welding, NDT, coating, welder qualification, lying, back filling line with the section plans and construction schedule.
• Review content of construction drawings and procedures prior to issue, in order that construction execution is optimized in the most cost effective, safe and timely manner.
• Preparation of drawing revisions, FCN and as-built drawings
• Carryout Material Take off from drawings whenever required.

Company industry:
Oil & Gas
Job role:
Mechanical Engineering

Mechanical Engineer

June 2013 - October 2015

Hyundai Heavy Industries Co., Ltd

Jizan, Saudi Arabia

June 2013 - October 2015

EPC works of 11 Chemical storage tanks and handling facilities for Emulsifier, Oxygen scavenger, Corrosion inhibitor, Biocide, Scale inhibitor. Also, Installation of secondary tanks with Tie in connection to day tanks in 20 Gathering Centres (Brown field).

17 Nos. of Fuel Gas/Gas Oil /Fuel Oil (LSFO/HFO) pipelines of different sizes (48” to 10”) connecting JUBAIL to JAZAN REFINERY - a total length of 808 km (48”/40” fuel gas lines- 200km, 24”/12” LSFO/HFO lines -200km, 24”/10” gas oil lines -200km, condensate/rich gas tie-in lines)

Job Profile
• Responsible for fabrication and erection works that includes piping, structural and equipment
• Review of all Pipeline & Piping drawings including alignment sheets, GAD, Isometrics, Plot plan, Typical drawings, Crossing drawings
• Assist with the project planning, scheduling, manpower estimates.
• Preparation / review of construction and test Procedure, Risk assessments, Method statements etc.
• Execution of construction activities such as cold bending, pipe stringing, welding, NDT, coating, welder qualification, lying, back filling line with the section plans and construction schedule.
• Monitor the execution of mechanical activities to ensure compliance with quality, project schedule, design documents, specifications, standards and codes
• Provides reports on project progress against the approved plans, bringing to notice potential delay and recommends solutions.
• Ensure that hydro test/pneumatic test and reinstatement is to be done as per procedure
• Carrying out final P&ID check of installed piping systems
• Co-ordination with engineering team for technical queries / clarifications
• Coordinating with Safety and QA/ QC dept. for smooth functioning of works
• Responsible for PTW system and preparing job safety analysis to meet the requirement of permit to work procedure.

Company industry:
Oil & Gas
Job role:
Mechanical Engineering

Education

Anna University

May 2013

May 2013

Bachelor's degree, Mechanical Engineering

India

GPA (percentage): 85.12%

GPA (percentage): 85.12%

Completed B.E Mechanical Engineering with Distinction.

Crescent International School

March 2009

March 2009

High school or equivalent, Physics, Chemistry & Mathematics

India

GPA (percentage): 91%

GPA (percentage): 91%

Completed H.S.C with Honour Grade.

Skills

Refinery

Expert

ASME

Expert

Oilfield Services

Expert

Piping

Expert

EPC

Expert

API

Expert

AUTOCAD

Expert

CONTENT MANAGEMENT

Intermediate

DOWNSTREAM

Expert

ENGINEERING

Expert

Refinery

Expert

ASME

Expert

Oilfield Services

Expert

Piping

Expert

EPC

Expert

Languages

Arabic

Intermediate

English

Expert

Hindi

Expert

Tamil

Expert

Training and Certifications

Training
In Plant Training
Neyveli Lignite Corporation (NLC)
May 2012
Project Trainee
Steel Authority of India Limited (SAIL)
Feb 2013