mohamed Ibrahim Yakout, Electrical Maintenance Engineer

mohamed Ibrahim Yakout

Electrical Maintenance Engineer

Abu-Qir Fertilizer & Petrochemical Co

Location
Egypt - Alexandria
Education
Bachelor's degree, Electrical Engineering (Power and Control Section)
Experience
17 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 10 Months

Electrical Maintenance Engineer at Abu-Qir Fertilizer & Petrochemical Co
  • Egypt - Alexandria
  • My current job since January 2013

• Maintenance for Electrical Substation 66/6.6 Kv, 6.6Kv generator (21MW) and all Electrical Loads as:
Power and distribution Transformer, 6.6Kv Switchgear, Motor Control Center, Protection and Metering Devices, MV and LV Circuit Breaker, Motorized Pumps and Fans, emergency Diesel generator, Dc rectifier panels, AC UPS panels, Motor Drives, Water Pump, (AC) Power Outlet and Lighting.

• Designing maintenance strategies, procedures and methods.

• Diagnosing breakdown problem.

• Directing, instructing and supervising technician.

• Controlling maintenance tools, stores and equipment.

• Monitoring and controlling maintenance costs

• Give the technical support for spare parts purchase.

Electrical Maintenance Engineer at MIDOR Refinery Site. at Alexandria Petroleum Maintenance Co. (Petromaint)
  • Egypt - Alexandria
  • May 2009 to January 2013

Maintenance for Electrical Substation and all Electrical Loads as the following

Power Transformer, Switchgear Boards, Motor Control Center, Protection and Metering Devices, MV and LV Circuit Breaker, AC &DC UPS, Motorized Pumps and Fans, (AC) Power Outlet and Lighting.

Electrical Tests:
1. Medium Voltage Circuit Breakers Analyzing
• Timing of closing and tripping.
• Contact resistance.\

2. Motor protection tests (Overload, Earth fault relay, RTD, Thermocouples and Insulation tests …)

3. Transformer test (Oil Dielectric test, Buchholz relay test and Oil Thermocouples)

Electrical Maintenance Engineer at KHARAFI National Co
  • Kuwait
  • November 2007 to April 2009

1. Maintenance Services for all Water Pump Stations and Main Workshop in Kuwait.
2. Carrying out Preventive Maintenance on various Electrical Equipment’s installed in the Electrical Test Bay as Motor-Generator Set, Excitation panel, LV&HV Switchgear and step-up Transformers up to 300kV.
3. Replacement of an old existing control system by new installation and programming of a control system PLC-S7 and a modern visualization system WINCC for a transformer test field.

Electrical Maintenance Engineer at Alexandria Petroleum Maintenance Co. (Petromaint)
  • Egypt - Alexandria
  • November 2006 to November 2007

Maintenance for Electrical Substation and all Electrical Loads:
Power Transformer, Switchgear Boards, Motor Control Center, Protection and Metering Devices, MV and LV Circuit Breaker, Motorized Pumps and Fans, (AC) Power Outlet and Lighting.

Electrical Design Engineer (Part Time) at Electrical Consulting Office
  • Egypt - Alexandria
  • July 2006 to May 2007

Electrical Power and Light current Drawing Design Using AutoCAD Program for New Projects

Education

Bachelor's degree, Electrical Engineering (Power and Control Section)
  • at Faculty of Engineering, Alexandria University
  • June 2006

Specialties & Skills

Motor Control
Metering
Refinery
Transformer
Pump Stations
design and install PV solar systems

Languages

Arabic
Expert
English
Expert

Hobbies

  • PV solar system
    install many solar home systems install many solar pumping systems