mohamed Ibrahim Yakout, Electrical Maintenance Engineer

mohamed Ibrahim Yakout

Electrical Maintenance Engineer

Abu-Qir Fertilizer & Petrochemical Co

Lieu
Egypte - Alexandrie
Éducation
Baccalauréat, Electrical Engineering (Power and Control Section)
Expérience
17 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 10 Mois

Electrical Maintenance Engineer à Abu-Qir Fertilizer & Petrochemical Co
  • Egypte - Alexandrie
  • Je travaille ici depuis janvier 2013

• Maintenance for Electrical Substation 66/6.6 Kv, 6.6Kv generator (21MW) and all Electrical Loads as:
Power and distribution Transformer, 6.6Kv Switchgear, Motor Control Center, Protection and Metering Devices, MV and LV Circuit Breaker, Motorized Pumps and Fans, emergency Diesel generator, Dc rectifier panels, AC UPS panels, Motor Drives, Water Pump, (AC) Power Outlet and Lighting.

• Designing maintenance strategies, procedures and methods.

• Diagnosing breakdown problem.

• Directing, instructing and supervising technician.

• Controlling maintenance tools, stores and equipment.

• Monitoring and controlling maintenance costs

• Give the technical support for spare parts purchase.

Electrical Maintenance Engineer at MIDOR Refinery Site. à Alexandria Petroleum Maintenance Co. (Petromaint)
  • Egypte - Alexandrie
  • mai 2009 à janvier 2013

Maintenance for Electrical Substation and all Electrical Loads as the following

Power Transformer, Switchgear Boards, Motor Control Center, Protection and Metering Devices, MV and LV Circuit Breaker, AC &DC UPS, Motorized Pumps and Fans, (AC) Power Outlet and Lighting.

Electrical Tests:
1. Medium Voltage Circuit Breakers Analyzing
• Timing of closing and tripping.
• Contact resistance.\

2. Motor protection tests (Overload, Earth fault relay, RTD, Thermocouples and Insulation tests …)

3. Transformer test (Oil Dielectric test, Buchholz relay test and Oil Thermocouples)

Electrical Maintenance Engineer à KHARAFI National Co
  • Koweït
  • novembre 2007 à avril 2009

1. Maintenance Services for all Water Pump Stations and Main Workshop in Kuwait.
2. Carrying out Preventive Maintenance on various Electrical Equipment’s installed in the Electrical Test Bay as Motor-Generator Set, Excitation panel, LV&HV Switchgear and step-up Transformers up to 300kV.
3. Replacement of an old existing control system by new installation and programming of a control system PLC-S7 and a modern visualization system WINCC for a transformer test field.

Electrical Maintenance Engineer à Alexandria Petroleum Maintenance Co. (Petromaint)
  • Egypte - Alexandrie
  • novembre 2006 à novembre 2007

Maintenance for Electrical Substation and all Electrical Loads:
Power Transformer, Switchgear Boards, Motor Control Center, Protection and Metering Devices, MV and LV Circuit Breaker, Motorized Pumps and Fans, (AC) Power Outlet and Lighting.

Electrical Design Engineer (Part Time) à Electrical Consulting Office
  • Egypte - Alexandrie
  • juillet 2006 à mai 2007

Electrical Power and Light current Drawing Design Using AutoCAD Program for New Projects

Éducation

Baccalauréat, Electrical Engineering (Power and Control Section)
  • à Faculty of Engineering, Alexandria University
  • juin 2006

Specialties & Skills

Motor Control
Metering
Refinery
Transformer
Pump Stations
design and install PV solar systems

Langues

Arabe
Expert
Anglais
Expert

Loisirs

  • PV solar system
    install many solar home systems install many solar pumping systems