Consultant Exploration Senior Drilling and completions Fluids Supervisor with APACHE Corporation (KA
Apache
Total years of experience :19 years, 11 Months
Responsible to improve safe and fast work operations in two of the Apache Corporation facilities in (KALDA AND QARUN) Egyptian petroleum companies western desert Egypt.
Supervise Mud operations preparation treatment oil base mud or synthetic mud or variable types of water base mud and completion fluids in all (KALDA AND QARUN) Rigs in all locations land rigs, .
Mud Systems pumps hoppers super charges lines and solids control equipment’s Rigs Acceptance.
Mud programs simulation technical/coast approvals.
Tracking rigs Operations/Fluids Oil/Water basis (send, received, lost and to identify losses types and volume lost to work 1st priority on well control ceases, chemicals on rig site/ daily usage.
Supervise sending and mixing on other location high weighted kill mud or mud cap and environmental nontoxic safra oil base / regular oil base mud and supply all critical situations as any well control issue or total losses on any drilling rig.
Technical Supporting Unit Coordinator for all (KALDA AND QARUN) rigs and mud plant chemical yard supervisor.
16 years Offshore Experience in GCC Jack Up Rigs.
Responsible for safety, efficiently managing on well site, any kind of operations relevant to the drilling fluids system also huge backgrounds in drilling and work over operations, supports chemicals or fluids, shipping and receiving all kind of chemicals, OBM, WBM, Killing Fluids.
Responsible of the drilling fluids system chemistry, and capable of properly testing and maintaining the properties of any kind from the drilling fluids systems as per the Client's requirements.
Perform hydraulics calculations (i.e. Annular velocity, Bit hydraulics, ECD, etc.) using ONE-TRAX, EMEC, RAS GAS) software without supervision on the rig site.
Responsible for making recommendations to hole cleaning issues, stuck pipe incidents and select appropriate pipe release agents or lost circulation events and identify and recognize lost circulation reason also select and apply appropriate remedial treatments.
Capable of managing the drilling fluids system during any well control conditions.
Full Knowledgeable with all rig solids control equipment’s and process and able to explain how various recommendations on each (shakers screen size selection, Desander, Desilter, Degasser, Centrifuges) will impact the drilling fluid properties or efficiency of solids removal.
Senior Drilling and Completions Fluids Engineer with MBPS from 2016 to present with work visa and Aramco ID: 8994139.
Drilled the most deepest vertical well in Qatar Area with various types of high weighted up to 20- PPG salt saturated polymer mud pre KHUFF formations, the deepest Exploration vertical HPHT in QATAR off shore DUKHAN Island, QP/TOTAL Qatar Offshore CQBH-1 Vertical 320 f, 420 days, 16, 500ft., 8.4-20 PPG, KCL Salt Saturated, salt saturated polymer, Spud, Exploration /off shore.
My job is to follow up morning reports of offshore rigs to anticipate NY emergency situations and to determine the priorities for supporting them by mud and chemicals and direct boats to transfer it also to supervise Mud mixing and treatment for Offshore rigs and represent my mud services company ( EMEC ) as coordinator in planning for sending and receiving boats with ARAMCO Supervisors of drilling support unit, dispatch and marine in TANA-JIB marine facility including handling liquid Clean mud mixing, shipping and receiving, waste management, chemicals shipping and receiving, and to Calibrate our Laboratories on offshore rigs and to support them by devices and reagents used in rig sites mud services, so my job needs a highly qualified person technically, personally including interpersonal communication skills, language skills, team management, planning skills, time management, self-motivation good knowledge of safety procedures including HAZCOM and learning flexibility .
Saudi Aramco Aindar ANDR - 3001 Deviated 340 f, 45 days, 12, 121 ft., 8.7-13.5 PPG, OBM, Salt Saturated, Spud Onshore/Relief well.
Saudi Aramco Minifa, MNIF-645 Injection/Directional 360 f, 300 days, 29, 362 ft., 8.4 - 16.5 PPG, LSND Mud, NaCl Polymer Mud, OBM, Spud, Injection Well/horizontal.
Saudi Aramco Hasba, HSBH-101, Deviated, 280 f, 95 days, 15, 650 ft., 8.7-20 PPG, Spud, KCL Polymer, HP WBM, Exploration /off shore.
Provide the client with a Geological and Hydro-Carbons Evaluation log at well site.
Operating for an Advanced Unit to make a monitor for all Drilling parameters all the time.
Make detection and Analysis for all gasses rises up from the well and the first warning for any harmfully gas Ex. H2S.
Colleting the samples and make full investigation for all of them.
Make petrochemical analysis to determine the presence of the oil and plotting oil shows.
Responsible for all calculation of volumes, length, gasses Analysis (FID) gasses detection (TG).
Responsible in some cases for the Pressure Evaluation Log and Hydraulics Runs.
Responsible for all output data related to the geological or drilling operations in reports.
Make Accuracy calibrations and maintenance for all Unite tools, computers, Equipment’s, Networks and sensors.
worked with different companies in Egypt offshore/land (shell, Gupco, petrobel, Gpc, Khalda, Betrodara, oil search, Naftogass)
Mud Logger
URL removed due to policy violation. Please contact support for further information.