محمد محرم, Construction Manager

محمد محرم

Construction Manager

Kharafi National. Group in project (District Cooling

البلد
الإمارات العربية المتحدة
التعليم
بكالوريوس, civil engineering
الخبرات
14 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 0 أشهر

Construction Manager في Kharafi National. Group in project (District Cooling
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ يوليو 2017

The project name is District Cooling Plant DCP-02.
-The project budget is (65, 000, 000) DHs
-The owner of project is EMAAR.
-work in structural work, Water Proofing, Finish work, infrastructure work (water
supply network- sanitation facilities network- Rainwater drainage network).

project manager في Wade El Nil
  • مايو 2009 إلى يوليو 2010

in structural work, infrastructure work (water supply network- sanitation
facilities network- Rainwater drainage network), block work, finishing work, water
proofing work, plumbing work& marble

project manager assistant في AL ZAMALEK contractures.gen.com
  • الإمارات العربية المتحدة
  • يناير 2007 إلى مايو 2009

The project name is HOREIZON Towers.
-The project budget is (430, 200, 000) D.HS
-The owner of project is SHEIKH HUMID BIN RASHED AL NOAIMI.
-work in structural work, block work, finishing work, water proofing work,
plumbing work, marble work, firefighting fire alarm system, false ceiling,
certain wall, Air condition system, sauna, swimming pools& Jacuzzi pools
finishing

Resident engineer في AL
  • الإمارات العربية المتحدة
  • سبتمبر 2006 إلى يناير 2007

contractures.gen.com in project contain from

site engineer
  • أبريل 2005 إلى سبتمبر 2006

the (R.C box culverts Canales AND Bridges on pile capes for
MINISTRY Of Water resources& Irrigation.)
-The project consists of bridge on pile caps on the El hebiel drain, Luxor.
-The project budget is (200, 000) LE.
-The project consists of R.C box culverts of Mettawa canal.
-The project budget is (650, 000) L.E

site engineer في Mars
  • الإمارات العربية المتحدة
  • يناير 2004 إلى يناير 2005

The project consists of 4 R.C. frame Building contain of (4
base) -The project budget is (5, 000, 000) LE.
-work in structural work, infrastructure work (water supply network- sanitation
facilities network- Rainwater drainage network- Transmission lines and power
supply parts- Networks of telephone lines, signal lines and early warning lines-
Waste disposal facilities and dumps), block work, finishing work, plumbing work,
firefighting, fire alarm system, Air condition system.

engineer
  • سبتمبر 2003 إلى يناير 2004

on the executive in the different field in (THE

في CONSTRUCTION AND services Home
  • مصر
  • يونيو 2002 إلى أكتوبر 2002

Training in The general Arab contractures.com in project contain from
(g+2base+12 floors).
Name of project: The police rest Hotel
Place of project

الخلفية التعليمية

بكالوريوس, civil engineering
  • في South Valley University
  • يونيو 2003

in

Specialties & Skills

ساب 2000
AutoCAD
Microsoft Excel
BRIDGES
BUDGETING
FRAMING
NETWORKING
PLUMBING
POWER SUPPLIES
PROOFING
TELEPHONE SKILLS

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الفرنسية
متمرّس