MOHAMMED MOHARAM, Construction Manager

MOHAMMED MOHARAM

Construction Manager

Kharafi National. Group in project (District Cooling

Lieu
Émirats Arabes Unis
Éducation
Baccalauréat, civil engineering
Expérience
14 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 1 Mois

Construction Manager à Kharafi National. Group in project (District Cooling
  • Émirats Arabes Unis
  • Je travaille ici depuis juillet 2017

The project name is District Cooling Plant DCP-02.
-The project budget is (65, 000, 000) DHs
-The owner of project is EMAAR.
-work in structural work, Water Proofing, Finish work, infrastructure work (water
supply network- sanitation facilities network- Rainwater drainage network).

project manager à Wade El Nil
  • mai 2009 à juillet 2010

in structural work, infrastructure work (water supply network- sanitation
facilities network- Rainwater drainage network), block work, finishing work, water
proofing work, plumbing work& marble

project manager assistant à AL ZAMALEK contractures.gen.com
  • Émirats Arabes Unis
  • janvier 2007 à mai 2009

The project name is HOREIZON Towers.
-The project budget is (430, 200, 000) D.HS
-The owner of project is SHEIKH HUMID BIN RASHED AL NOAIMI.
-work in structural work, block work, finishing work, water proofing work,
plumbing work, marble work, firefighting fire alarm system, false ceiling,
certain wall, Air condition system, sauna, swimming pools& Jacuzzi pools
finishing

Resident engineer à AL
  • Émirats Arabes Unis
  • septembre 2006 à janvier 2007

contractures.gen.com in project contain from

site engineer
  • avril 2005 à septembre 2006

the (R.C box culverts Canales AND Bridges on pile capes for
MINISTRY Of Water resources& Irrigation.)
-The project consists of bridge on pile caps on the El hebiel drain, Luxor.
-The project budget is (200, 000) LE.
-The project consists of R.C box culverts of Mettawa canal.
-The project budget is (650, 000) L.E

site engineer à Mars
  • Émirats Arabes Unis
  • janvier 2004 à janvier 2005

The project consists of 4 R.C. frame Building contain of (4
base) -The project budget is (5, 000, 000) LE.
-work in structural work, infrastructure work (water supply network- sanitation
facilities network- Rainwater drainage network- Transmission lines and power
supply parts- Networks of telephone lines, signal lines and early warning lines-
Waste disposal facilities and dumps), block work, finishing work, plumbing work,
firefighting, fire alarm system, Air condition system.

engineer
  • septembre 2003 à janvier 2004

on the executive in the different field in (THE

à CONSTRUCTION AND services Home
  • Egypte
  • juin 2002 à octobre 2002

Training in The general Arab contractures.com in project contain from
(g+2base+12 floors).
Name of project: The police rest Hotel
Place of project

Éducation

Baccalauréat, civil engineering
  • à South Valley University
  • juin 2003

in

Specialties & Skills

ساب 2000
AutoCAD
Microsoft Excel
BRIDGES
BUDGETING
FRAMING
NETWORKING
PLUMBING
POWER SUPPLIES
PROOFING
TELEPHONE SKILLS

Langues

Arabe
Expert
Anglais
Expert
Français
Expert