Company : ETA Ascon Star group
Division : M & E
Position : Electrical Engineer
Project : Cleveland Clinic Hospital project, Abudhabi
Client : Mubadala
Consultants : AECOM/KEO
Main Contractor : SAMSUNG & SIXCO
Period : April 2012 onwards
Responsible for Installation, Testing & Commissioning including QAQC activities of the Following: -
Power And Lighting System, L.V. Switch Boards & Motor Control Centers.
Lighting Control System, Fire Alarm System, Public Address and voice Alarm System
CCTV - Closed Circuit Television System
BMS - Building Management System, CO System
Erection of residential housing complexes, hospital, high rise buildings, good command over trouble shooting problems in electrical field.
Preparation of asbuilt as per site condition Electrical Power, Lighting, Voice and data as well as CCTV System, Access control system, Electro Mechanically system, Fire Alarm as per the requirement from Client, Consultant and Concerned Government Authorities.
CCTV System, Access Door control system, Electro mechanically system, (card reader, pole Barrier, Road Blacker), Fire Alarm system, Audio & Video Intercom system Installation and Maintenance.
Preparing material submittal, planning for the materials
Obtaining approval from client and consultant.
Labour schedule preparation for project execution.
Relevant knowledge of DEWA, ADDC rules and regulations.
DEWA related submissions for power supply operation manual preparation for the project.
Coordinating with other services at the time of erection especially HVAC and plumbing service.
Executing the job as per approved drawing / specification / contractual obligation.
Coordinating with other services at the time of erection especially HVAC and Mechanical Services.
Coordinating with consultants to obtain site inspection reports.
Testing and commissioning of Low voltage, Low Current system, Fire Alarm, Emergency and control systems.
All government authorities related submissions for Power supply.
As Built Drawings, Operation & Maintenance manual preparation for the project
Quantity Take off’s From Electrical Drawings.
QA/QC Activities :
Responsible for corporate QA/QC manager for coordinating project quality matters.
Reporting to the project manager for implementing the project Quality Plan and supervision of projects works to ensure that installation, testing and commissioning are carried out in the correct manner.
Responsible for coordinating with main contractor’s Quality Manager to obtain approval of quality system documentation related to the Project.
Preparing inspection requests received from respective engineers.
Check work has been done in the site as per approved shop drawing, method statement, specification and manufacturer’s instructions.
Listing of Snags in MEP services and implementing to clear the snags on top priority basis.
To check quantity of material, make, model and accessories are as per the material submittal.
Preparing Site observation report and issuing it to concerned engineers.
Preparation of log for inspection request, NCR, Drawing and Material.
Ensure that the calibrated equipment’s are used in the site and maintain the record for the same.
To close out the NCR which is issued by the consultant or main contractor?
Coordinate with the engineers & consultant to close out the NCR.
Distribute approved shop drawing and method statement to the respective department.
Initial installation MEP materials inspection with main contractor and consultants
First fix inspection of False ceiling grid closure, wall closure and second fix final inspection ceiling closure done as per approved shop drawings