(Technical Office & Site) Engineer
Atlas General Contracting , Real Estate Investments , Air Conditioning & Elevators Works Co
مجموع سنوات الخبرة :18 years, 5 أشهر
• Ventilation, Air cooling & dehumidification.
• Elevators
- Perform the design works assigned (calculations, drawings, specifications, BOQ and etc.)
- Make New Extensions Proposals and feasibility Studies.
- Prepare requests for quotations (RFQ’s)
- Preparation and follow-up of tenders.
- Review Quotations & Offers Technical and Commercial Sides.
- Write professional emails and reports with visit report.
selection of the product / service required.
- Coordinate the preparation of proposals / tenders.
- Supervising the mechanical and electrical installations for Elevators.
- Follow-up maintenance work for elevators.
Planning & make studies for projects.
Installing ( Executive engineer for pipng instrumentation drawing *PID*
Running the equipments and Observing it With maintenance.
AutoCAD Draftsman for spare parts and follow up manufacturing.
Start up operation of plant
Operation of centrifugal equipments.
Operation of pneumatic systems.
Operation of hydraulic systems.
Operation of water lines.
Operation of steam lines.
Responsibilities in detail
◘ Reporting to the projects Manager
◘ Make New Extensions Proposals and feasibility Studies
◘ Prepare requests for quotations (RFQ’s)
◘ Preparation and follow-up of tenders
◘ Review Quotations & Offers Technical and Commercial Sides
◘ Upgrading the old equipment to decrease the cost of the project
◘ Storage and Organization of the project equipment ( Machines, Chemicals, utilities, .. )
◘ Mechanical installation of new machines according to manufacturers recommendations
◘ Tanks, Silo and vessels Fabrication
◘ Supervise Piping installation
◘ Co-ordination of mechanical, electrical and civil works
◘ Schedule preparation and resource forecasting for Projects
◘ In charge of performance management of the architectural, Contractors and engineering vendors
◘ Ensure projects are completed according to project plans.
◘ Manage project team resources and training
◘ Inter-discipline coordination and overall quality control of the engineering work
◘ Piping systems and design strategies - documentation, P&ID, flow diagrams - capacities and limits
◘ Pipes Inspection - Carbon Steel, Stainless Steel, HDPE, PVC - Visual Inspection, Geometrical Inspection and Material Analysis
◘ Follow Machines Installation & Commissioning.
◘ water treatment stations (High pressure pumps, Sand Filters, Multi-Media Filters, Activated Carbon filters, cartridge filters, cyclators, RO Units )
◘ Inspect all new mechanical parts and decide on which goes to production and which stays for repairs and which gets rejected
Education: University : Helwan University. Faculty : Engineering. Major : Mechanical Power Engineering. Graduation year : May 2004 Grade : Good. Graduation Project : design of cylinder head. Head Line : Change inlet angle of suction manifold to reduce detonation and pre-ignition. Program Used: AutoCAD Grade: Excellent